Amendment_0001_SPMYM218Q3426.docx

DOCX document 66 KB Posted

Attached to
TOOL ROOM VERTICAL CAROUSEL STORAGE SYSTEMS
Solicitation number
SPMYM218Q3426
Issued by

About this file

AMENDMENT TO ISSUE UPDATED SPECIFICATIONS. VENDOR MUST SUBMIT SIGNED COPY OF AMENDMENT 0001 WITH OFFER.

View the file

Other files

File Type Posted
Updated_RFQ_SPMYM218Q3426_(Tool_Rm_Vertical_Carousel).docx DOCX document
EXHIBITS.pdf PDF
SPMYM218Q3426_(TOOL_ROOM_VERTICAL_CAROUSELS).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPMYM218Q3426

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

UPDATED SPECIFICATIONS

1 SCOPE

This specification reflects those characteristics that are essential to the minimum needs of the government for a two (2) Tool Room Vertical Carousels, site preparation and installation of as specified herein The scope of work shall include the “Turn-Key” set-up, operational testing of the carousel/vertical lift storage systems/ equipment as specified herein. It is the government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this specification.

2 APPLICABLE DOCUMENTS

The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals shall apply.

2.1 SAFETY REQUIREMENTS

· Safety Requirements For The Puget Sound Naval Shipyard And Intermediate Maintenance Facility (PSNS & IMF), Bangor Site A copy of this document is attached to this specification (See Enclosure 1).

2.2 ADDITIONAL SAFETY REQUIREMENTS In addition to the safety requirements specified in Paragraph 2.1, the following is requisite:

2.2.1The equipment and its component parts shall be in compliance with applicable Code of Electrical Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and approved by PSNS&IMF if it meets specific Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Part 1910; Subparts "O" and "S". Specifically, equipment will be "Accepted" by PSNS&IMF if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party). A NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report or documentation mounted on the equipment, (which acknowledges it is NRTL certified), shall be provided.
2.3ENVIRONMENTAL COMPLIANCE REQUIREMENTS

· Environmental Compliance Requirements For The Puget Sound Naval Shipyard And Intermediate Maintenance Facility (PSNS & IMF), Bangor Site

2.4 GENERAL ENVIRONMENTAL REQUIREMENTS

2.4.1 Hazardous Material Control shall include the following:

2.4.1.1 Estimated Contractors Hazardous Material Inventory (CHMI) Table provides quantities of each hazardous material to be used on this project. Copies of all Safety Data Sheets (SDS) will be submitted to the Base Environmental Office (BEO) and be kept on site where the work is being performed.

2.4.1.2 Contractor shall not use Hazardous Material (HM) composed of any of the following chemicals or substances: Leads, chromium, mercury, phenols, trichloroethylene, chlorofluorocarbons, halon, PCBs, asbestos, silica sand (for use as blasting agent), Class I Ozone Depleting Substances (ODS), radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed in 40 CFR 355.50 Appendix B.

2.4.1.3 If additional Hazardous Materials (HM) is required for this project, an SDS shall be submitted to the BEO for approval before the HM is brought on board Naval Base Kitsap (NBK) Bangor. The contractor shall not bring on board NBK Bangor any HM until approved by the BEO. All containers of hazardous material shall be resealed, placed in a secure area while on base, and transported off base for reuse of material at other contractor projects. The Contractor shall not generate any contractor generated hazardous or dangerous waste on this project.

2.4.2 Waste Control shall include the following:

2.4.2.1 A trained individual from the shop with a current Waste Originator certification must be present for each shift that hazardous waste is produced.

2.4.2.2The shop shall submit completed NBK Bangor Waste Information Specification (WIS) forms for all waste, hazardous and non-hazardous, expected to be encountered during the course of this project. The BEO will provide final waste designation along with WIS instructions. If additional wastes are produced after this plan is approved, waste is encountered not identified, or changes occur to waste streams that have already been assigned a WIS number, a new or updated WIS's for each waste stream must be submitted to the BEO for designation.
2.4.2.3A hazardous waste label must be affixed to the appropriate container upon the first addition of waste. If more than 55 gallons of Dangerous Waste (DW) or 1 quart of Extremely Hazardous Waste (EHW) is produced, the date must be filled in on the label. All containers must be under the control of the shop and located in the same area the waste is generated.
3GENERAL DESCRIPTION OF SYSTEM - This specification covers the minimum government requirements for a “Turn-Key” Two (2) Tool Room Vertical Carousels.
3.1WORK INCLUDED - The Contractor shall be responsible for the following:

· Design, manufacture, test and groom all equipment required to provide a complete system and in accordance with the requirements specified herein.

· All shipping, crating, and rigging costs associated with the transport and delivery of the equipment specified herein.

· Complete documentation and organization of all technical data which applies to the operation, maintenance, repair and testing of the specific equipment.

· Installation in our facility of the specified equipment with the features identified in this specification. This includes connection of the equipment to required available utilities.

3.2 WORK NOT INCLUDED - The government/receiving activity will provide:

· Air, electrical and other utilities services (within 50 feet) as required for the proper operation of the equipment unless otherwise stated herein.

3.3CONDITIONS OF SERVICE AND PERFORMANCE - The following service and operational conditions shall apply to the equipment delivered under this specification.
3.3.1Environmental Conditions - The specified equipment shall be designed to operate in a non-air-conditioned manufacturing building in an industrial environment.
· Temperature Range:15 to 110 oF
· Relative Humidity:up to 100% Non-Condensing
3.3.2Electrical - The building facility has 480 VAC, 3-phase, 60 Hz electrical power, in its fully configured and operational state. Each proposed system shall operate using this power. If necessary, an appropriate sized step-down transformer shall be provided and installed by the contractor.
3.3.3Asbestos - No asbestos products/materials shall be used in any components (i.e. gaskets, etc.) of the equipment. The equipment shall be asbestos free.
3.4GENERAL EQUIPMENT REQUIREMENTS:
3.4.1Standard, Off The Shelf Components - All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing. Standard, off the shelf components with proven reliability shall be used wherever possible to increase performance reliability and reduce costs. The system components shall be one of the manufacturer’s current production models which, on the day this solicitation is issued, has been designed, engineered and sold, or is being offered for sale through advertisements or manufacturer’s published catalogs or brochures. System components such as a prototype unit, pre-production model, or experimental unit DO NOT qualify as meeting this requirement. The system shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.
3.4.2Painting - All surfaces shall be painted in conformance with the manufacturer’s standard practices and good workmanship. Painting shall result in a highly wear-resistant finish, which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. The manufacturer’s standard color shall be provided. Lead base or chromium base paints are prohibited.
3.4.3Caution - Warning Plates - Corrosion resistant “Caution” or “Warning” plates shall be securely attached to system components in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.
3.4.4All Electrical Components including motors, starters, relays, switches, and wiring shall conform to and be located in accordance with the applicable NFPA, NEMA, and ANSI standards for the intended application.
3.5CONTRACTOR PROVIDED CAROUSEL STORAGE SYSTEMS - The contractor shall provide the following:
3.5.1This specification covers the minimum Government requirements for two (2) “Turn-Key” Carousel Storage Systems. These systems shall store various types of hardware/fasteners/tools/materials used in the maintenance/repair of submarines. The carousels shall have the capability to store bulky, heavy and dissimilar parts, with fast storage and retrieval times. An operator shall be able to store/retrieve an item via a push button & touch screen controller, using a micro-processor controller. Carriers (that hold spare parts) shall be delivered to an operator comfortably, at an optimum ergonomic height. These Carousel Storage Systems shall be designed for seismic zone 4 installation in accordance with requirements identified in these specifications, and shall meet all safety requirements as outlined in enclosure 1. The contractor shall provide the following (with all dimensions being +/- 3 inches):
3.5.2One (1) Hanel Rotomat Industrial Carousel Storage System (Model 985S/172/342/305) or equal including the following minimum technical features: All sides of the Carousel shall be enclosed including bottom, and powder coated in light grey (or similar color). The dimensions are 189.8”H x 135”W x 68”D and no worktable across the front of the carousel. There are to be 26 carriers each with 3.35" high roll out drawers in a 2x2 configuration. The drawers are 52”W x 23”D with a fixed center divider. Each drawer will hold approx. 230 lbs. (approx. 30 lbs/sq ft). Maximum of 1,300 lbs per carrier +/- 5%. Operator access height 35” This storage system shall have data base sharing software (that allow multiply units to communicate with each other, including similar units already installed)
3.5.3One (1) Hanel Rotomat Industrial Carousel Storage Systems (Model 985S/172/342/406) or equal including the following minimum technical features: All sides of the Carousel shall be enclosed including bottom, and powder coated in light grey. The dimensions are 195.7”H x 135”W x 68”D and no worktable across the front of the carousel. There are to be 20 open carriers with a clear height of 13.27”, clear depth of 24.8”, a clear width of 108.26” and a .6” front lip to keep material from sliding off of carrier. Max carrier weight of 1,300 lbs +/- 5%. Operator access height 43”.
3.5.4The systems shall have the capability (and be set-up) to share one database across both units and an existing Hanel Lean Lift via an Ethernet cable connection. The contractor shall provide the Ethernet cabling connection.
3.6CONTRACTOR PROVIDED CAROUSEL STORAGE SYSTEMS REQUIREMENTS - The contractor shall provide the following requirements for each carousel:
3.6.1Each carousel shall have an Eco-mode (or equal) programmable energy saving feature that will power down the inactive carousel after a predetermined time of inactivity in four stages or levels. Level 1, the background lighting of the TFT display is turned off. Level 2, the components of the electrical control system are turned off. Level 3, the lighting is dimmed. Level 4, the carousel is turned off at the main switch.
3.6.2Each carousel shall have an Eco-load (or equal) status imbalance monitor. The monitor will enable the microprocessor controller to achieve optimum distribution of the storage items by making loading recommendations that keep the stored goods evenly distributed thereby saving energy. Motors that are forced to push uneven loads wear out faster and use more energy compared to motors that are moving evenly distributed loads.
3.6.3An operator interface station (controller) shall be provided on each carousel that is easy to use, to store/retrieve parts. The controller shall be mounted on a universal arm. It shall be a Firmware-based unit, with no moving parts, utilizing industrial-grade compact flash memory that is insensitive to dust, dirt, and extreme temperature ranges, to provide high data security with no need to connect to a computer. The Microprocessor control system shall be a standalone database with a full-color touch-screen control and keypad with integrated real-time data browser, providing part and description search, order details, and space utilization information. Transaction logging feature shall provide data on the date, time, processing user, transaction type, quantity transacted, and affected storage location of each pick or put-away process. Provide inventory control features as a standalone unit and can be easily interfaced with external devices such as barcode reader, ID badge readers, and printer. These interfaces/ports will be on the unit already allowing the government to simply plug in a device and have that device work. The control system shall include part number, description, and minimum inventory level. File download capability eliminating the manual entry of information. The system shall be able to process kits or job requests. It must be able to send information to a desktop or printer and receive information from a bar code scanner. It must connect to a computer through an Ethernet connection allowing you to work at your desk or at the Lift itself. The controller must provide the following functions and capacities: Job management – priority controlled processing with acknowledgement of the quantity actually withdrawn; Storage strategies such as FIFO, FIFO with re-storage, selective access to storage locations, fixed location storage and random storage; Storage location unit size; Automatic size dependent storage location search (free space search); Minimum inventory feature with low stock warning and printout of a reorder recommendation list; Quantity factor and availability check for pick lists; Order picking can be sequential or route optimized (shortest route between all of the units); Storage data retrievable via web browser, partially editable
3.6.4Each carousel shall have soft starts and stops. The operator work surface height shall be approximately 35” from the ground.
3.6.5Each carousel’s carriers shall be attached to conveyor chains or another equal system. The guide track system shall provide for carousel stability. Each carrier’s access opening shall be reduced to one carrier high (for product security)
3.6.6Each carousel must have dual motors. Dual Motor Drive Technology eliminates the torque problems created by single motor drive systems providing longer service for the entire system. And in case of failure of one of the motors the second motor provides redundant power eliminating the need to hand-crank the unit.
3.6.7Each carousel shall have dual safety redundancy (with two overrides providing complete operator safety for unit function without the need to hand crank). The emergency safety system bypass shall ensure the carousel is fully operational, even if any part of the safety system is not. The emergency safety bypass system is an immediate solution to light curtain alignment problems or other safety system failures. When in safety bypass, the unit will operate by simply closing the access door. The microprocessor control override feature shall ensure that retrieval and stocking can still take place, even if the control malfunctions. Should a microprocessor failure occur, the manual override shall provide an immediate drive alternative.
3.6.8Each carousel must be a six-sided cabinet (full top and bottom, standard) designed for cleanliness, security and maximum protection for articles being stored. The skins must have interlocking lips (male/female) for maximum structural integrity and load carrying. This feature also insures that the carousel can only be installed plumb thereby reducing the wear and tear that internal moving parts can experience if not plumb to each other.
3.6.9Each carousel shall have continuous guide racks welded in place at the factory to assure proper cycling of the carriers yielding maximum uptime and eliminating the need for costly track adjustments.
3.6.10Drive chains or equal shall be installed and pre-tensioned at the factory. No field adjustment shall be required following installation ever.
3.6.11Each carousel must use sealed self-lubricating bearings ensuring longer life and less maintenance.
3.6.12Each carousel shall have multifunctional positioning sensor shall allow for multiple stopping locations for each carrier. All stopping heights shall have the capability to be different on each carrier.
3.6.13Each carousel shall have split, locking doors with upper and lower full length piano hinge style safety touch thresholds to ensure article security and operator safety. The threshold shall break away from the rotating carriers creating a safety gap (no pinch point in case of safety failure) for protecting personnel and stored items from any risk by bringing the carousel to an immediate stop.
3.6.14Each carousel must have a 25% Imbalance Drive Capacity to allow for maximum imbalance while still rotating.
3.6.15Self-monitoring LVS light curtain shall be installed at the operator access opening, on each carousel. This shall provide safety features that protect the operator from injury when the carriers are moving. This feature shall immediately stop the carriers from moving, when an operator’s hand/arm is in danger of injury.
3.6.16Each carousel shall have a lockable sliding door(s), with two keys shall be provided (so stored parts can be secured).
3.6.17Each carousel shall have an emergency stop button shall be provided at the operator’s station that is of the mushroom type and colored red.
3.6.18Each carousel shall have an operator lighting system shall be provided (i.e. full width LED energy saving, overhead lighting)
3.6.19Quality and durable construction of all system components, shall be provide on each carousel. System structural components shall be rigid and stable.
3.6.20Each carousel shall have operations journal logging – which shall allow for tracking each transaction (storage to a new location, storage to an existing location, retrieval, retrieval with deletion of a bin, cancelled part request and manual shelf call) by time, date and storage location affected. This is accessible via the integrated web interface and can be exported to other programs.
3.6.21Each carousel shall have item pool management – which shall allow descriptive data and reorder points to be electronically sent to the unit, rather than having to type this information at the controller. Also allows for storage of this data without having a storage location assigned within the unit.
3.6.22Each carousel shall have access code management – with magnetic locking doors– which shall provide username/password functionality with the ability to control shelf access to specific users. The system will only rotate when the doors are closed.
3.6.23Each carousel shall provide a position and depth bar, which shall have an LED Light Bar with Position and depth indicators every 6” across access opening. The carousels shall have a total of 18 lights across the front.
3.7CONTRACTOR PROVIDED MISCELLANEOUS SERVICES - Miscellaneous services shall include the following minimal requirements:
3.7.1Coordination with Authority Having Jurisdiction (AHJ) for Electrical installation and modifications. Utilities installation shall include the contractor requesting each necessary utility outage(s). The contractor shall complete and submit an outage request form (for each utility outage), and pay a nominal outage fee (for each outage) to the local base operating contractor (who will secure/re-energize the utility source).
3.7.2Compliance with all required Naval Base Kitsap Safety, Environmental, Quality Control, Base Security, Waste Management and Disposal, and other construction requirements necessary for the enclosure installation.
3.7.3Coordination for required outages, inspections, and testing (if required).
3.7.4Submittals, Color, and Finish Selection Coordination.
3.7.5As-Built, and Operation and Maintenance (O&M) Manuals and Documentation at completion of the project.
3.7.6Commissioning and startup.
3.7.7Provide a layout drawing to the government (and receive government approval of the layout drawing) prior to procurement of enclosure components and project start-up (installation).
3.8CONTRACTOR INSTALLATION AND SET-UP SERVICES TO BE PROVIDED - The specified modular enclosure, and all associated equipment shall be assembled, installed, set-up and tested by the contractor in the area(s) designated as its functional work area by the Receiving Activity Point of Contact. The contractor shall provide all personnel, and supplies necessary for the complete installation and set-up of the proposed modular enclosure (except as noted elsewhere in this specifications). The contractor shall remove/relocate overhead light fixtures, and electrical conduits/wiring (that feed these fixtures), and relocate a heating system vent, all of which interfere with the location of the lifts.
3.8.1Each Carousel shall operate on the building provided 480 VAC, 3 phase power. The contractor shall install conduit and wiring, connecting each system’s electrical panel to the building’s electrical power panel. The contractor shall provide an appropriate sized breaker for each system (and install it in the building’s electrical power panel). This includes installing conduit fasteners, etc. The contractor shall follow all applicable codes, when installing this electric service. A lockable electrical power disconnect box for each system shall be provided and installed by the contactor in the vicinity of each storage system.
3.8.2Coordination - The Contractor shall contact the Receiving Activity Point of Contact with a proposed installation schedule (at least one week before the installation starts). The installation schedule shall be subject to review and approval of the Receiving Activity Point of Contact. Approval of installation schedule shall not relieve the Contractor of any responsibility for performance in accordance with the contract. The Contractor shall coordinate the site preparation and the delivery of materials in a manner which causes minimum disruption/interference with the activity’s normal business routine.
3.8.3Work Process - The Contractor shall provide a field supervisor to direct set up and testing. The field supervisor shall have full authority to implement his field decisions in an expeditious manner. No work shall be accomplished when the field supervisor is not in the immediate work area.
3.8.4Lifting And Rigger Services - The contractor shall provide all material handling equipment necessary to unload the module components, etc., and transport it to the installation site and any other equipment (such as forklifts, man-lifts, etc.) necessary for continuous support of the transportation and installation of the specified module components, etc., and shall provide qualified personnel to operate it by the contractor. The contractor shall not use cranes and only use a forklift to lift materials from the bottom of the load (and not from the top, in a crane-like manner).
3.8.5Contractor Site Visit - The contractor shall make a site visit to the facility prior to submitting a bid. This shall include viewing the existing facility, utilities, etc. The contractor shall have a complete understanding of the requirements for the installation of the specified equipment (prior to bidding on this project).
3.8.6Security Escorts – The contactor shall secure and provide security escorts when their personnel are on the Delta Pier.
3.8.7Seismic Anchors – Each storage system shall be anchored to the floor to meet current local earthquake seismic Zone 4 requirements.
4INSTALLATION SUPPORT SERVICES PROVIDED BY THE GOVERNMENT - The activity will provide the following in support of the installation:
4.1Receiving Activity Point Of Contact - Upon contract award, the receiving activity (Puget Sound Naval Shipyard & Intermediate Maintenance Facility, at Bangor) shall designate a Receiving Activity Point of Contact who shall be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Receiving Activity Point of Contact shall serve as the contractor’s primary contact for all interaction with Government activities.
4.2Utilities - Reasonable amounts of water, shop air (80-90 psi) and electricity shall be made available adjacent (within 50 feet) to the assembly site at no cost to the contractor (for temporary use during the installation of the specified equipment). The Contractor shall be responsible for any costs incurred in connecting, converting and transferring the utilities to the work site.
4.3Storage - Lay-down area will be provided within the vicinity of installation site for storage of Contractor materials and tools. The Government does not accept responsibility for security of Contractor’s materials or tools. The area must be kept clean and orderly, free of rags, paper and other debris. Failure to maintain area in a clean condition may result in the loss of the area. The Contractor shall be responsible to restore the storage area to original condition after use.
4.4Disposal Of Waste - Puget Sound Naval Shipyard and Intermediate Maintenance Facility is the owner of all waste (hazardous or otherwise) generated within its facilities. This includes waste generated by contractor personnel while working at Puget Sound Naval Shipyard and Intermediate Maintenance Facility. All waste generated by this contract shall be turned over to the activity for disposal prior to the end of the work shift.
5TECHNICAL DATA TO BE PROVIDED
5.1Operator / Maintenance / Repair Manuals - The equipment shall be furnished with three (3) hard copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure. The vendor shall provide a “no asbestos used” statement, certifying that all products/materials (i.e. gaskets, etc.) used in the components of the equipment does not contain asbestos, as outlined in paragraph 3.3.3
5.2NRTL Certification Report - As outlined in paragraph 2.2.1
6WARRANTY - Supplies and services furnished shall be covered by warranty from defects in design, materials and workmanship. The warranty shall be the manufacturer’s standard commercial warranty, which shall conform to all the requirements of the contract. Acceptance of the manufacturer’s standard commercial warranty shall not minimize the rights of the Government under clauses in the contract, and in any conflict that arises between the terms and conditions of the contract and manufacturer’s warranty, the terms and conditions of the contract shall take precedence. The warranty period shall be for 1 year. The warranty period shall commence from the date of acceptance. All warranty work shall be provided by a factory authorized distributer.
7QUALITY ASSURANCE PROVISIONS
7.1RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for the performance of all inspection requirements (examinations and tests) as specified herein. The Government reserves the right to perform any of the inspections set forth in this specification, where such inspections are deemed necessary to assure supplies and services conform to the prescribed requirements.
7.2RESPONSIBILITY FOR COMPLIANCE - All items shall meet all requirements of this specification. The inspection(s) set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspections, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.
7.3INSPECTION/TESTING AT ORIGIN - Basic performance tests (prior to shipment) shall be conducted by the manufacturer on the primary equipment and all associated equipment to the extent practicable, to demonstrate functionality, to ensure contract requirements are being met. The tests may be performed by the Contractor, either by personnel of their service organization directly, or by an independent testing agency. The contractor shall contact the government two (2) weeks before the completion of the manufacturing of the specified equipment. This shall allow the government the option of sending their technical representative(s) to witness the tests, and to ensure contract requirements are being met, prior to shipment of the unit to the government.
7.4INSPECTION/TESTING AT DESTINATION
7.4.1Initial Test And Grooming - The equipment delivered with the system shall be inspected by the Government for mechanical and electrical integrity as follows: All welds shall be inspected for integrity and appearance. Surfaces shall be examined for sharp edges and burrs. Fasteners shall be checked for tightness and if fixed to prevent loosening due to vibration. Paint will be checked for flaking and blistering. Electrical requirements shall be examined for compliance to the National Electrical Code, (NFPA 70/79). The fit of parts shall be observed, with particular reference to the interchangeability of those that are likely to require replacement. Faults will be duly recorded and presented to the contractor for rectification.
7.4.2Operational Tests - Upon satisfactory completion of the tests above, the equipment shall be set up for an operational test and evaluation. The contractor shall demonstrate the ability of the equipment to perform as required in this specification. All equipment functions shall be exercised to the extent necessary to prove proper operation in accordance with specification requirements. The system shall function, without failure, for the duration of this test period. If a failure occurs during the test period, repairs shall be immediately affected by the Contractor, and the tests shall be restarted from the first test. Three failures without completion of the test period shall be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction, which requires remedial action to restore the system to full operation in accordance with contract specifications.
7.5PROVISIONS FOR REPAIR AND RETEST - In the event of a test failure, the contractor, at their discretion, may elect to correct the failed condition and request a retest of the system (vs. shipping the equipment back to the manufacturer for repairs).
7.6FINAL ACCEPTANCE - Final acceptance shall be upon satisfactory completion of installation, inspection and testing of the system (as outlined in this specification).
8DELIVERY
8.1It is required that all goods and services provided by this solicitation be delivered prior to 120 days of contract award.
8.2The Surveillance Officer shall be notified no less than 48 hours prior to the arrival at the site of the specified equipment and/or contractor personnel.
8.3Material transportation from the manufacturer’s facility to the work site shall be the responsibility of the contractor. Limited secured storage areas at the facility will not permit the Government to store material for extended periods of time. Early shipment of materials, without the permission of the receiving activity shall be refused.
8.4PACKING MATERIAL - The use of shredded paper, whether newspaper, office scrap, computer sheets, or wax paper, in packing material for shipment to Navy activities, is prohibited.
8.5It is the Government’s intent that the Contractor delivers a fully operational and functional system meeting the requirements stated herein prior to acceptance by the receiving activity and final payment by the government. Delivery of this system shall occur when all deliverable items of this contract have been received, installed and made operational and the contractor has demonstrated and the receiving activity has confirmed that the system meets or exceeds the requirements set forth in this specification and is ready for Government use.
9GENERAL NOTE
9.1RESPONSE TO REQUEST - As a part of the response to this request, descriptive literature (in accordance with FAR 52.214-21) shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling provided, statements of compliance with specification, and performance statements with special attention to the key performance criteria stated herein.
9.2ADMITTANCE TO THE WORK SITE:
9.2.1Upon contract award, employees or representatives of the Contractor who require access to the Receiving Activity's facility at Naval Base Kitsap Bangor (NBK Bangor) shall be admitted to the work site only after they have been issued an appropriate NBK Bangor Security ID Badge which is obtained at NBK Bangor Pass & ID Office.
9.2.2For access to the NBK Bangor main perimeter, NBK Bangor OA Gate or Delta Pier/Waterfront Restricted Area gates, contractors are required to be a US Citizen and have either the following:
9.2.2.1A up to five days visitor badge obtained from NBK Bangor Pass & ID (located by the main gate to the base). Contact the Receiving Activity Point of Contact to request a one and up to a five day visitor badge.
9.2.2.2A five days or More visitor badge to gain access through the NBK Bangor OA Gate, or Delta Pier/Waterfront Restricted Area, a Navy Region NW badge is required and is obtained through the on-line Base Authorization and Visit Request (BAVR) computer system. To request a Navy Region NW badge, Go on line to "https://www.bavr.cnic.navy.mil/", and submit a request for a badge, a minimum of three business days prior to arrival. The "Command you are visiting" is: NAVIMFAC. The "Sponsor E-Mail" for an on-line badge should be: larry.schofield@navy.mil (Larry Schofield, 360-315-1187). In the "Purpose of Visit" box, please add the Contract Number, the Receiving Activity Point of Contact and the building/area you are visiting. If the BAVR computer system doesn't work, all visiting personnel shall contact the Receiving Activity Point of Contact or our security manager, Larry Schofield, 360-315-1187 to schedule a visit(s), and shall provide the following information:

* Full Legal Name

* US Citizen Status

* All Company Contact Information

* Contract Number

9.2.3Visitors must show proof of US Citizenship (at the NBK Bangor Pass & ID Office) by having an original active US Passport, an "Enhanced Driver's License", or an unlamented official birth certificate.
9.2.4Truck delivery personnel only need to show their Bill of Lading and show proof of US Citizenship (at the NBK Bangor Pass & ID Office) by having an original active US Passport, Enhanced Driver's License, or an unlamented official birth certificate. All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection. Drivers should expect delays due to heightened security.
9.2.5Contractor's vehicles requiring NBK Bangor Delta Pier/Waterfront Restricted Area access shall provide the following data to the Receiving Activity Point of Contact, who shall request a Strategic Weapons Facility, Pacific (SWFPAC) Delta Pier vehicle permit. These permits are issued by SWFPAC and are picked up (by the contractor) at the SWFPAC building (Building 6401)

* Company Name (must match the vehicle's registration):

* Vehicle Make:

* Vehicle Model:

* Vehicle Year:

* License Plate #:

* License Plate Issue State:

* Access Start/End Dates:

9.2.6Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances, and will be denied access to the activity.
9.2.7It shall be the Contractor's responsibility to collect, account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required. All NBK Bangor Pass & ID Office issued badges and identification passes must be returned back to the NBK Bangor Pass & ID Office no later than the expiration date.
9.2.8Foreign Nationals or Affiliations - Foreign Nationals (non U.S. Citizens) or persons affiliated with, or employed by, a foreign, or foreign owned company will not be granted access without proper NBK Bangor Commanding Officer's written approval. Please note that All NBK Bangor Command Foreign Nationals or Affiliations visit request must be submitted sixty (60) days prior to a requested visit date.
9.2.9Identification. All Contractors shall clearly identify themselves as contactor personnel.
9.3RESTRICTIONS:
9.3.1Parking - Vehicles and equipment required by the Contractor to complete this contract must be registered with Security. Forms for obtaining vehicle passes and permits may be obtained from the Receiving Activity Point of Contact. Parking is available at or near the work site or at other authorized areas on the station. Contractor vehicles must be marked on the outside with the company name or logo or both. Failure to comply will result in ticketing and/or loss of vehicle privileges.
9.3.2Regular Working Hours - All work is to be performed during PSNS & IMF, Bangor Site's regular work hours from 6:30 a.m. to 3:00 p.m., Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturdays, Sundays, holidays, or outside the regular or specified hours/days, the Contractor shall submit a request to the Receiving Activity Point of Contact, for approval a minimum of two (2) working days prior to the anticipated work date. In no event shall a Contractor carry on work outside the hours and days specified in the contract without prior approval.
9.3.3Restricted Colors - PSNS & IMF, Bangor Site uses the colors magenta and yellow to identify specially controlled materials. The Contractor is specifically prohibited from using magenta and yellow colored plastic wrapping materials or bags, tape, or other covering materials.
9.3.4Radio Restrictions - Operation of privately owned citizens band or amateur radio equipment (receive and transmit) within the geographic limits of the activity is prohibited. All radio equipment installed in privately owned motor vehicles must be turned off upon entering the premises.
9.3.5Contractor Electronic Devices – Use of such devices, including cell phones, and computers shall not be capable of photography or digital recording by contractor personnel at PSNS & IMF, Bangor Site is restricted. This includes personally owned Portable Electronic Devices (PEDs) that are used for storing data, including but not limited to removable storage devices (e.g. memory sticks rewriteable CDs and DVDs, Zip and floppy disks). Contractors requiring such devices in the performance of this contract shall have the equipment inspected and approved by the PSNS & IMF Information Assurance office, located in Bremerton, WA. If this equipment is needed, it must comply with the photography regulations. Please contact Christopher Yeagley at 360-315-5112, christopher.yeagley@navy.mil to make a request. Please allow 5 business days for appointments with PSNS & IMF cyber security to be made.

9.3.6 Photography/Recording - Contractor personnel are prohibited from having personal reproduction equipment of any kind, including but not limited to photocopying, copying, and/or recording devices. This includes photographic equipment, tape recorders, or other recording devices in their possession while inside the Operations Area (OA). Contractors requiring the use of photographic equipment in PSNS & IMF, Bangor Site spaces must request authorization through the IMF security office. Please contact Larry Schofield at 360-315-1187, larry.schofield@navy.mil, to make a request.

9.3.7 Prohibited Items - The items listed below are prohibited (and includes any other item, which the possession of is prohibited by Federal, State or municipal law, Department of Defense or Department of Navy instruction directive or policy).

9.3.7.1 Weapons or other dangerous materials of any kind, including by not limited to firearms, ammunition, knives (blades longer than 3-inches), explosives, incendiaries, personal defense aerosols/sprays.

9.3.7.2Alcoholic Beverages of any kind and illegal to include marijuana.
10PERSONAL HEALTH AND SAFETY
10.1The Contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract, and ensure their employees follow safe work practices. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (i.e. hard-hats, safety shoes, safety glasses with permanently attached side shields, face protection and hearing protection; In addition, any special PPE required for the task or process, including the required training for the particular PPE). The Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.
10.2All Contractors shall clearly identify themselves as contactor personnel.
10.3MEDICAL TREATMENT. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured. Government facilities may be used in these instances as the first point of treatment. Transfer to a non-Government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.
11WORK SITE INFORMATION
11.1REGULAR WORKING HOURS/SHIFTS. Regular working hours is normally 8 hours (6:30 am 3:00 pm), with a 30-minute lunch break, Monday through Friday. Working hour variations may be requested by contractor personnel, and approved by the Receiving Activity Point of Contact.
11.2Holidays and Shutdown Periods. All shutdown periods, when directed by the Commanding Officer, are normally associated with holidays or inclement weather. Naval Base Kitsap policy is to continue operations during adverse weather. Severe weather may cause an electrical power outage, or snow, ice, or wind conditions may cause the base to remain closed. Other shutdown periods may be declared by Executive Order. Contact the Surveillance Officer regarding severe weather or Executive Order shutdown information. The contractor shall not be required to work during designated shutdown periods. Holidays observed by the contractor shall include all legal holidays observed by the Government. These holidays are:
New Year's DayLabor Day
Martin Luther King DayColumbus Day
President's DayVeterans' Day
Memorial DayThanksgiving Day
Independence DayChristmas Day
11.3Overtime is not authorized. Overtime is defined as hours worked in excess of the employee's normal workweek. The normal workweek is defined as forty (40) hours.
11.4Nothing contained in the specifications shall relieve the Contractor from complying with applicable Federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits that may be required for the Contractor or Subcontractor(s) to perform a particular function, such as hazardous waste handling or disposal, for example.

ENCLOSURE 1

SAFETY REQUIREMENTS FOR THE PUGET SOUND NAVAL SHIPYARD AND INTERMEDIATE MAINTENANCE FACILITY, BANGOR SITE

SCOPE

These specifications provide safety information and procedures required for any work performed at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Bangor Site. This does not include additional safety requirements from Naval Base Kitsap at Bangor which is the host activity at Bangor.

APPLICABLE DOCUMENTS

The following documents form a part of this specification. Unless otherwise indicated, the issue in effect on the date of a request for proposals or request for quotes shall apply.

National Fire Protection Association (NFPA)

NFPA 54National Fuel Gas Code
NFPA 70National Electric Code
NFPA 79Electrical Standards for Industrial Equipment

Code Of Federal Regulations

29 CFR 1910Occupational Safety and Health Standards
29 CFR 1915Occupational Safety and Health Standards for Shipyard Employment
29 CFR 1926Safety and Health Regulations for Construction

(Application for copies should be addressed to Superintendent of Documents, Government Printing Office, Washington, DC 20402) Washington State Administration Code (WAC) WAC 173-60 Maximum Environmental Noise Levels

I. GENERAL REQUIREMENTS

a. All documentation/correspondence and/or communication specified in these specifications shall be submitted to the Contracting Officer or their designated Government Representative.

b. Mutual Understanding Meeting. Prior to commencing work: The Contractor shall meet in conference with the Contracting Officer, and other necessary Government personnel to discuss and develop mutual understandings regarding administration of the Safety Program, methods and schedules, security, and any other subject necessary for a smooth and successful operation.

c. Environmental & Safety Compliance, General Awareness Training, and Regulatory Interface

1. Contractors working at the PSNS & IMF are required to perform their work in compliance with all Federal, State, and local regulations pertaining to the environment at all times.

2. The contractor is responsible for complying with the safety regulatory notices or orders, including payment of any fines attributable to the contractor’s conduct, regardless of whether or not the contractor is the name recipient of the notice, order, or fine.

3. The contractor is responsible to perform all duties and responsibilities for environmental and safety compliance set forth in this contract. The Contracting Officer can use failure to comply with the responsibilities for environmental and safety requirements as a basis for termination for default.

4. Failure to comply with or repeated violations of local, state, or Federal regulations can result in the violator(s) losing their access to PSNS & IMF or the operation being suspended until the Contractor can provide properly trained personnel. Certification of training shall be presented upon request by the Contracting Officer. The contractors (including its employees) loss of access to PSNS & IMF will not be considered by the Contracting Officer as a basis for an adjustment to the contract for additional costs incurred by the contractor.

5. The contractor shall be responsible for conducting routine inspections of the work and storage areas to maintain compliance with the cleanliness and safety requirements associated with this contract.

d. Definitions – Technical:

1. Contractor. The term Contractor refers to both the prime Contractor and subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract

II. HEALTH AND SAFETY

a. Personal Health And Safety Contractor work performed at PSNS & IMF is typically in an industrialized area and is subject to OSHA Standards. The contractor shall conduct all work in a safe manner and shall provide all necessary safety equipment.

The contractor shall make the maximum use of low-noise emission equipment as certified by the Environmental Protection Agency. Applicable regulatory requirements for maximum environmental noise levels are published in the Washington Administrative Code, WAC 173-60. The contractor shall provide hazardous noise signs and label equipment wherever work procedures and equipment produce sound-pressure levels greater than 84 dB(A) steady state and/or 140 dB peak sound pressure level for impact or impulse noise, regardless of the duration of the exposure.

b. Compliance With OSHA Contractor’s personnel shall perform all work in accordance with the most current OSHA rules and regulations issued by the Department of Labor, as applicable.

For all electrical equipment installation, the equipment and its component parts shall be in compliance with the applicable OSHA regulations in accordance with CFR Title 29, Chapter XVII, Part 1910 and installed in accordance with NEC/NFPA requirements.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.