SPECS HP AIR FLASKS.pdf
PDF 137 KB Posted
- Attached to
- USNS LARAMIE (T-AO 203) HP AIR FLASKS
- Solicitation number
- N3220522Q2095
About this file
This solicitation is for the manufacture of 28 high pressure air flasks for the USNS LARAMIE (T-AO 203). The contractor shall review all provided references and drawings, submit designs for approval, and manufacture 20 air flasks in accordance with ASME standards to include support brackets capable of withstanding the weight and additional forces from ship motion. Welding shall be performed by qualified welders using qualified procedures. The contractor must obtain all required approvals and certifications, including ASME certification for the air flasks. The contractor shall also perform hydrostatic and other post-construction tests, paint surfaces, install nameplates, and provide technical drawings of the air flasks. The solicitation number for this opportunity is N3220522Q2095 and it was issued by the Department of the Navy Military Sealift Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LIST OF MATERIAL.PDF | ||
| Solicitation USNS Laramie Airflasks Q2095.pdf | ||
| 6580222_B air flasks.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS LARAMIE
( T-AO 203 )
MACHINERY, AUXILIARY SYSTEMS CONTRACT NO. XXXXXX-XXX
ITEM NO. mor/sor CATEGORY "A" 2022-02-07
High Pressure Air vessels MSC/N72/xxx xxxx - 1
1.0 ABSTRACT: This item describes the manufacture of 28
(twenty-eight) high pressure air flasks.
2.0 REFERENCES:
2.1 DWG 500-6580222 Pressure Vessels for Air Flasks & Air
Receivers
2.2 ABS Marine Vessel Rules 2022
2.3 ASME Boiler and Pressure Code VIII
2.4 ABS Generic Rules for Classification, Materials and
Welding and Survey after Construction – Part 2 2022
2.5 Military Sealift Command General Technical
Requirements (GTR)
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity:
3.1.1 Location: Various
3.1.2 Quantity: 20 (twenty)
3.2 Item Description/Manufacturer's Data: None
3.3 Bill of Material:
3.3.1 See Reference 2.1 for estimate
3.3.2 Quantities given in the List of Materials are
considered estimates. The Contractor shall provide these quantities and reasonable additional material in order to install a fully functional system that meets the requirements of this specification.
3.3.3 Additional material/components necessary to
accomplish work required by this work item, such as hangers, pipe fittings (i.e. pipe elbows, connectors, adapters, weld rods, weld material, etc.) are not included above or below, and shall be provided by the Contractor.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
MACHINERY, AUXILIARY SYSTEMS CONTRACT NO. XXXXXX-XXX
xxxx - 2
5.1 The contractor and all subcontractors, regardless of
tier must consult the Military Sealift Command General
Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to
GTRs 1 through 7, 23 and 29.
5.2 The contractor and subcontractors shall review other
work items under this contract, to determine their effect on the work required by this item. Based on this review the contractor shall plan and schedule work to minimize conflicts between work items.
5.3 Materials not listed as Government Furnished (GFM)
shall be furnished by the Contractor. The Contractor shall provide all labor and material required to accomplish this work item including but not limited to staging, space certification, contamination containment, firewatches, removal and reinstallation of all interferences including insulation in way of repairs to effect a complete and finished end result.
5.4 Provide certificates of inspection and approvals by
USCG/ABS upon completion of this work item.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional
7.0 STATEMENT OF WORK REQUIRED:
7.1 Arrangements/Outfitting: None Additional
7.2 Structural: None Additional
7.3 Mechanical/Fluid:
MACHINERY, AUXILIARY SYSTEMS CONTRACT NO. XXXXXX-XXX
xxxx - 3
7.3.1 The contractor shall review ref 2.1 in its
entirety prior to starting any work.
7.3.2 The contractor shall submit Design Approval to
ABS engineering and the MSC REP before performing any work and an ABS approval letter will be received.
a. The contractor shall meet all ABS requirements including but not limited to Part 4, chapter 4, section 1 of reference 2.2.
b. The contractor shall meet all ASME standards and requirements as outlined in ref 2.3.
7.3.3 The contractor shall make 20 air flasks in
accordance with sheet no. 7 of ref 2.1. The air flasks shall be made to ASME standards as described in ref 2.3.
a. Air Flasks shall be manufactured such that at a minimum they have support brackets capable of supporting the weight of the air flasks and an additional 2Gs of force due to ship’s motion.
i. Air Flasks shall have two support brackets for mounting as described in
Detail 14-G of ref 2.1.
ii. Air Flasks shall also be manufactured with three 4” x 4” x 7.5# T columns about the base of the air flasks. Use sheet no.
8 of ref 2.1. as guidance.
b. Welding of pressure parts and of non-pressure parts to pressure parts are to be performed by means of qualified welding procedures and by qualified welders. The qualification of welding procedures is to be conducted in accordance with Section 2-4-3 of the ABS Rules for
Materials and Welding as found in ref 2.4.
7.3.4 Contractor shall obtain all required approvals
and certifications as required by ref 2.1, ref
2.2, and ref 2.3. This is to include ASME certification on all of the air flasks.
MACHINERY, AUXILIARY SYSTEMS CONTRACT NO. XXXXXX-XXX
xxxx - 4
7.4 Electrical: None Additional
7.5 Electronics: None Additional
7.6 Preparation of Drawings: Contractor shall provide a
technical drawing for the air flasks. Drawings are to be in accordance with ref 2.5. Drawings shall be submitted in pdf form to the MSCREP and
Tech Library
9276 3rd Ave., Bldg LP-26
Norfolk, VA 23511
7.7 Inspections/Tests:
7.7.1 The contractor shall complete all post
construction tests as found in ref 2.2 and ref
2.3.
7.7.2 Perform a hydrostatic test on every pressure
vessel. The test shall be at 4500 PSIG. All tests shall be witnessed and accepted by ABS surveyor and MSCREP. Flush components with clean water after performance of hydrostatic test.
7.8 Painting:
7.8.1 Clean, prime and paint all new and modified
surfaces (including piping lagging) to match surrounding surfaces using Reference 2.5 as guidance.
7.8.2 Contractor shall restore all surface coatings, lagging and disturbed insulation during performance of this work.
7.9 Marking:
7.9.1 Install name plates for all new and modified
systems using refS 2.1, 2.3 and ref 2.5 as guidance.
7.10 Manufacturer’s Representative: None Additional.
8.0 GENERAL REQUIREMENTS: None Additional