Specs_-_County_Line_Fence_FY22.docx
DOCX document 68 KB Posted
- Attached to
- County Line Fence FY22
- Solicitation number
- 140L0722Q0020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L0722Q0020_Amd_0002.pdf | ||
| Sol_140L0722Q0020_Amd_0001.pdf | ||
| Drawing_Packet_-_County_Line_Fence_FY22.pdf | ||
| Map_Packet_-_County_Line_Fence_FY22.pdf | ||
| ID20220087.docx | DOCX document | |
| Sol_140L0722Q0020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1 – GENERAL
1.01 SUMMARY
Removal and disposal of approximately 1,050 rod of fence consisting of barbed wire, net wire, t-posts, stays and all ancillary fence materials. Rocks from disassembled rock cribs shall be scattered. Existing steel t-posts are to be left in place and reused for this project. Fence section to be removed will be flagged by the Government before the start of work.
Construct with government furnished material, approximately 944 rod of Let-Down fence with steel anchor structures and three wire gates. Construct with government furnished material, approximately 56 rod of 4-Wire fence with steel anchor structures. Starting location of work shall be determined and approved by the Contracting Officer prior to installation.
A. Description of Work: Furnish labor, equipment and supplies to construct the specified 4-Wire and Let-Down fence with steel structures and three wire gates. Existing steel t-posts are to be reused for this project.
B. Location: Work under this Contract is in Fremont County, approximately 16 miles Southeast of Kilgore, Idaho. The work locations are shown on the drawings.
1.02 REFERENCES
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
| ASTM | American Society for Testing and Materials | |||
| 100 Barr Harbor Dr. | ||||
| West Conshohocken PA 19428-2959 | ||||
| ASTM A 53 REV A-95 | Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless | |||
| ASTM A 121 REV A-92 | Zinc-Coated (Galvanized) Steel Barbed Wire | |||
| ASTM A 641-92 | Zinc-Coated (Galvanized) Carbon Steel Wire | |||
| ASTM A 702-89 | Steel Fence Posts and Assemblies, Hot Wrought (R1994) | |||
| OSHA | Occupational Safety and Health Administration | |||
| US Department of Labor | ||||
| 200 Constitution Ave., NW | ||||
| Washington DC 20210 | ||||
| OSHA 2207-91 | Construction Industry | |||
| USFS | USFS Spark Arrester Guide 1992 |
1.03 DEFINITIONS
A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.04 SUBMITTALS
A. Scope: Submittals include design computations, shop drawings, manufacturers' literature, as-built drawings, samples, and maintenance manuals.
B. Requirements: Refer to specifications for submittals required. Allow at least 10 working days for review. Submittals shall be delivered to BLM, Idaho Falls District, 1405 Hollipark Drive, Idaho Falls, ID 83401.
C. Identification of Submittals: Completely identify each submittal by showing at least the following information:
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.05 CERTIFICATES OF CONFORMANCE
A. Requirements: The Contracting Officer may permit use, prior to sampling and testing, of materials when accompanied by Certificates of Conformance. Materials used based on a Certificate of Conformance may be sampled and tested. Installation of materials based on a Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials which conform to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.
B. Format: The form of the Certificate of Conformance provided by the supplier shall be as follows:
1. The certificate shall state that the named product conforms to the Contract requirements.
2. The certificate shall either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.
3. The certificate shall provide the name and address of the manufacturer, the testing agency, and the date of tests.
4. The certificate shall set forth the means of identification which will permit field determination of the product delivered as being the product covered by the certification.
1.06 QUALITY ASSURANCE
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
C. Measurements: Where approved manufacturer's diagrams and shop drawings give specific measurements or rough-in dimensions for equipment, these dimensions shall take precedence over dimensions indicated on the drawings.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Delivery: The Contractor shall protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated.
B. Storage: The Contractor shall provide temporary storage facilities for products, which will protect them from damage until installation on the project and final acceptance.
C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage until installation on the project.
1.08 PROJECT/SITE CONDITIONS
A. Access to the Work sites: Access is generally provided by two-track trails; cross-country travel will be permitted for local access and along fence lines. Steep side slopes, rocks, and brush will make some sections of fence line inaccessible to highway vehicles. Off-road ATV/UTV use is allowable for the purpose of fence construction. Where access to work crosses private property, Contractor will be responsible to obtain permission for access.
B. Environmental Considerations: Limit brush clearing to a total of twelve feet in width. Disturbance of ground and vegetation shall be kept to a minimum. No scalping will be allowed. Burnt juniper trees will be encountered and some will have to be removed during fence construction. Stumps left from cut Junipers shall be 4 inches or less from existing ground surface. Piling of brush and trees shall not be allowed. Brush and cut trees that have been cleared shall be scattered to give a more natural appearance. The terrain at the fence location is an old burn site and is rocky.
1.09 SEQUENCING AND SCHEDULING
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the estimate.
PART 2 – PRODUCTS
(There are no applicable requirements.)
PART 3 – EXECUTION
3.01 PROJECT MEETINGS
A. Pre-Work Conference:
1. A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.
3. The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.
B. Progress Meetings:
1. Meetings shall be held at the project site, or as determined by the Contracting Officer.
2. Meetings may be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.
C. Final Inspection:
1. Meeting shall be held at the project site, or as determined by the Contracting Officer.
2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.
3. The Contractor shall require the superintendent to be present during this inspection.
3.02 PREPARATION
A. Work Layout: The Government will set stakes to give the Contractor measurements, lines, and grades necessary for the work executed under the Contract. Baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.
3.03 DISPOSAL OF DEBRIS
A. Requirements: Items or debris not designated as salvage for the Government shall become the property of the Contractor. The Contractor shall be responsible for disposal of materials in a legal manner and for payment of any fees required. Burning of removed materials is not permitted on the work site.
PART 4 – MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.
END OF SECTION
| DIVISION 1 | SECTION 01 10 00 |
| GENERAL REQUIREMENTS | SUMMARY |
| 07/06/2022 | GENERAL REQUIREMENTS |
| COUNTY LINE FENCE FY22 | 01 10 00 - 6 |
PART 1 – GENERAL
1.01 SUMMARY
Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site. Also includes other work and operations which must be performed and/or costs incurred prior to beginning work on the components listed in the schedule of items.
PART 2 – PRODUCTS
(There are no applicable requirements.)
PART 3 – EXECUTION
(There are no applicable requirements.)
PART 4 – MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
Progress payments for Mobilization will be made as follows:
When 5% of the original contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original contract amount, whichever is the lesser will be paid.
When 10% of the original contract amount is earned from other bid items, 100% of the bid for mobilization or 10% of the original contract amount, whichever is the lesser will be paid.
4.02 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
| Pay Item | Pay Unit | |
| 01 71 13 – 01 Mobilization | Lump Sum |
| DIVISION 1 | SECTION 01 71 13 |
| GENERAL REQUIREMENTS | MOBILIZATION |
END OF SECTION
| 07/06/2022 | MOBILIZATION |
| COUNTY LINE FENCE FY22 | 01 71 13 - 3 |
PART 1 – GENERAL
1.01 SUMMARY
A. Section Includes:
1. Furnishing all equipment, and labor for the removal of 1,050 rod of Government flagged barbed wire / panel fencing.
1.02 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Government that may be uncovered during demolition remain the property of Government.
1. Carefully salvage in a manner to prevent damage and promptly return to Government.
PART 2 – PRODUCTS
(There are no applicable requirements.)
PART 3 – EXECUTION
3.01 PREPARATION
A. Clearing and Grubbing: Maximum clearing width is 6 feet on each side of the fence line. Provide minimum disturbance to existing grass and sod. Dispose of debris by scattering.
3.02 REMOVAL
A. General: Remove all barbed wire strands within the Government flagged fencing sections. This includes barbed wire fence/posts/stays and all ancillary fence materials. Materials removed not designated as salvage for the Government shall become the property of the Contractor. Disposal of materials in a legal manner and payment of fees required is the Contractor's responsibility. Burning of removed materials is not permitted on the work site.
3.03 EXPLOSIVES
A. Requirements: The use of explosives is prohibited.
PART 4 – MEASUREMENT AND PAYMENT
| 4.01 | METHOD OF MEASUREMENT | |
| The work described in this section will be measured for payment by the rod for each section of fence removed as measured along the ground surface. |
4.02 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
| Pay Item | Pay Unit | |
| 02 41 00 – 01 Wire Fence Removal | Rod |
| DIVISION 2 | SECTION 02 41 00 |
| EXISTING CONDITIONS | DEMOLITION |
END OF SECTION
| 07/06/2022 | DEMOLITION |
| COUNTY LINE FENCE FY22 | 02 41 00 - 3 |
PART 1 – GENERAL
1.01 SUMMARY
A. Section Includes: Furnishing treated wood products. Refer to applicable sections and drawings for additional wood requirements.
B. Related Sections:
1. Wire Fences and Gates: Section 32 31 26
1.02 SUBMITTALS
A. General: Submittals shall be according to Section 01 10 00: General Requirements.
B. Manufacturer’s data and written recommendations for application of wood treatments.
1.03 QUALITY ASSURANCE
A. Preservative Treated Lumber: Each piece shall bear a quality mark from an agency accredited by ALSC. The quality mark shall include the preservative retention level, the corresponding application (above ground, ground/freshwater contact, etc.), applicable AWPA standards, and the symbol of the inspection agency.
B. Fabricator's Qualifications: A person required to apply preservatives must provide evidence of completion of an Environmental Protection Agency approved training course.
1.04 DELIVERY, STORAGE, AND HANDLING
A. Storage: Stack treated material separately from untreated material. Identify framing lumber as to grades and store each grade separately from other grades. Support above the ground and cover against moisture. Allow air to circulate between members.
B. Handling: Treated materials shall be handled to preserve the integrity of the treatment. Scrapes, penetrations, or abrasions shall be treated with a preservative approved in writing by the Contracting Officer.
1.05 SEQUENCING AND SCHEDULING
A. Requirements: Coordinate the provision of treated members with the progress of the work and the crew necessary for their installation. Anchor bolts or other necessary attaching devices shall be correctly sized and in place. Follow manufacturer’s recommendations for hot dipped galvanized or otherwise treated fasteners.
PART 2 – PRODUCTS
2.01 MATERIALS
A. Lumber: Shall be treated according to AWPA C2
2.02 WOOD PRESERVATIVE TREATMENT PRACTICES
A. General: Minimum net retention, penetration, and treatment method shall be according to AWPA C 1, and the appropriate AWPA standard listed above.
B. Pentachlorophenol: Shall conform to AWPA P3 in petroleum conforming to AWPA P 9.
C. Waterborne Preservatives: Shall conform to AWPA P 5, as follows:
1. Acid Copper Chromate (ACC)
2. Ammoniacal Copper Arsenate (ACA)
3. Ammoniacal Copper Zinc Arsenate (ACZA)
4. Chromated Copper Arsenate (CCA), types A, B, and C D. Coal Tar Creosote: Conforming to AWPA P 1 or P 2.
E. Creosote-Petroleum Oil Solution: Conforming to AWPA P 3.
F. Copper Naphthenate: Shall conform to AWPA P3 in petroleum conforming to AWPA P9, for treatment of field cuts, follow the procedures in AWPA M4 using a preservative with a concentration containing no less than 2 percent copper metal.
G. Washing and Kiln Drying: After treatment, lumber and plywood treated with waterborne preservatives shall be washed and kiln dried to a maximum moisture content of 19 and 15 percent, respectively.
2.03 FABRICATION
A. Incising:
1. All lumber except Ponderosa, Red, or Southern Pine, 2-inch nominal (28 mm actual) or greater in thickness shall be incised prior to treatment. The spacing and shape of the cutting teeth and the method of incising shall be such as to produce a uniform penetration.
2. Lumber 1-inch (25 mm) in thickness or less shall be incised on the wide faces only. All other lumber shall be incised on all faces.
B. Sorting: The material shall be sorted into one kind or designated group of kinds of wood and into pieces of approximately equal size, moisture, and sapwood content. Separate to ensure contact of the treating medium with all surfaces.
C. Field Treatment: Lumber fabricated in the field or cut after treatment shall be treated and cared for according to AWPA M 4.
PART 3 – EXECUTION
(There are no applicable requirements.)
PART 4 – MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.
| DIVISION 6 | SECTION 06 10 63 |
| EXTERIOR ROUGH CARPENTRY | TREATED LUMBER |
END OF SECTION
| 07/06/2022 | TREATED LUMBER |
| COUNTY LINE FENCE FY22 | 06 10 63 - 3 |
PART 1 – GENERAL
1.01 SUMMARY
A. Section Includes: Furnishing all equipment, labor and some material for installing the following:
1. Let-down fence.
2. 4-wire fence.
3. Associated steel fence anchor structures.
B. Related Sections:
1. General Requirements: Section 01 10 00.
1.02 REFERENCES
A. American Society for Testing and Materials:
| ASTM A 53-90b | Pipe, Steel, Black, and Hot-Dipped Zinc-Coated Welded and Seamless | |
| ASTM A 116-88 | Zinc-Coated (Galvanized) Steel Woven Wire Fence Fabric | |
| ASTM A 121-92a | Zinc-Coated (Galvanized) Steel Barbed Wire | |
| ASTM A 390-92a | Zinc-Coated (Galvanized) Steel Poultry Fence Fabric (Hexagonal and Straight Line) | |
| ASTM A 584-92 | Aluminum-Coated Steel Woven-Wire Fence Fabric | |
| ASTM A 702-89 | Steel Fenceposts and Assemblies, Hot-Wrought | |
| ASTM A 854-/854M-91 | Zinc-Coated (Galvanized) Steel Smooth High-Tensile Fence and Trellis Wire | |
| ASTM F 1083-91 | Pipe, Steel, Hot-Dipped Zinc-Coated (Galvanized) Welded, for Fence Structures |
B. West Coast Lumber Inspection Bureau:
1. WCLIB: Standard Grading Rules for West Coast Lumber.
1.03 SUBMITTALS
A. General: Submittals shall be according to General Requirements: Section 01 10 00.
B. Certificates of Conformance: Submit (3) copies of written certification from the manufacturer that the Contractor furnished materials conform to the requirements of this section.
1.04 QUALITY ASSURANCE
A. General: Contractor furnished supplies and accessories will be approved by the Contracting Officer before installation.
1.05 PROJECT/SITE CONDITIONS
A. Access roads shall not be constructed along fence lines and to the construction site unless written approval is granted by the Contracting Officer. Cross country travel with wheeled or tracked vehicles shall be only to and along fence lines.
PART 2 – PRODUCTS
2.01 CONTRACTOR-FURNISHED MATERIALS
A. Nails: Shall be 40d.
B. Post Grout: The grout shall be a rapid setting commercial product manufactured for anchoring posts.
C. Pipe and chain gate closer.
| 2.02 | GOVERNMENT-FURNISHED MATERIALS |
| Government furnished material will be available for pick-up at the Idaho Falls Bureau of Land Management District Office: 1405 Hollipark Dr, Idaho Falls, ID 83401. |
A. Barbed Wire: A strand of two 121/2ga galvanized wires twisted together with 2point barbs of 14ga wire spaced 4 inches apart. Wire and barbs shall be zinccoated steel, with a zinc coating of at least 0.3 oz/ft2 of coated surface area. The minimum breaking strength of each wire shall be 950 lbforce. The barbed wire shall conform to ASTM A 121.
B. Barbless Wire: A strand of two 121/2ga, galvanized wires twisted together. Wire shall be zinccoated steel wire of at least 0.3 oz/ft2 of coated surface area. The minimum breaking strength of each wire shall be 950 lbforce. The barbless wire shall conform to ASTM A 121.
C. Wood Posts: Posts shall be a minimum of 3” diameter by 48” long pressure treated Douglas Fir grade no. 2 or better or select fencing grade according to WCLIB for the hinge points for the gates. Pressure-treat posts in accordance with Section 06 10 63, Treated Lumber.
D. Wood Stays: Stays shall be a minimum of 1 ½” thick by 48” long Douglas Fir, Larch or Cedar.
E. Steel Fence T Posts: ASTM A 702; painted solid green or green with white or silver tops with a welded or riveted anchor plate. Furnish with cliptype wire fasteners (punched tabs for fastening wires are not acceptable). Steel T posts shall be manufactured from wrought, rail, or new billet steel and shall have a minimum weight of 1.33 lb/ft. The anchor plates shall weigh a minimum of 0.67 pounds +/- 5 percent and be a minimum of 18 inch2 in area.
F. Easy-Fence braces.
G. Easy-Fence panels.
H. Easy-Fence panel clamps.
I. ¼” grade 30 galvanized chain.
J. 8’ x 34” galvanized hog panels.
K. ClipType Wire Fastener: Galvanized wire, 8 gauge.
L. Staples: Shall be 9-ga, bright-finish or galvanized with slash-cut points 1-1/2 inches long.
2.03 WOOD TREATMENT PRACTICES
A. See Section 06 10 63 – Exterior Rough Carpentry.
PART 3 – EXECUTION
3.01 PREPARATION
A. Clearing: Maximum clearing width is 6 feet on each side of the fence line. Provide minimum disturbance to existing grass and sod. Dispose of debris by scattering.
3.02 INSTALLATION AND REMOVAL
A. General: Drive/set steel posts for fence endpanels, cornerpanels, and stresspanel posts (Steel t-posts shall not be used for panels unless specified in drawings).
B. Driving/Setting Steel Posts: Drive or dig holes into the ground to the depth shown on the drawings. Set posts plumb and to the spacing shown on the drawings, unless staked otherwise. Holes shall provide adequate open space around the post so backfill can be tamped to the full depth around the post. Backfill gradually and uniformly with soil around each post. Compact backfill firmly from the bottom of the hole to the ground surface. Where existing soils are sandy and posts are loose and unstable, posts shall be set in concrete at depths indicated in specs and drawings. All posts shall be firmly set in place.
C. Driving T Posts: Drive into the ground to the depth shown on the drawings or until the anchor plate is completely below the ground surface. Posts shall be driven plumb. When rock formations prevent driving remove anchor plate and excavate or drill holes a minimum of 18 inches deep and slightly larger than the diameter of the post. Place posts in the holes and grout the post solidly in position with cement grout or mortar.
D. Corner panel, End Panel, Stress Panel/H Brace assemblies: Construct as shown on the drawings or as staked in the field. Rock jacks shall not be substituted for these items. Construct stress panels on crests of hills, and a maximum of 1,320 feet center-to-center for barbed wire sections. In addition, stress panels are required at points between which wire is to be stretched. Construct end panels at the end of fence runs, including at gates, cattleguards, and rock rim termination points unless shown otherwise on the drawings.
E. Figure Fours and Rock Jacks: May be used with Contracting Officer's permission. Figure fours shall be used in lieu of steel posts, and rock jacks in lieu of wood line posts, except that where a series of figure fours are required, a rock jack shall be substituted for every fifth figure four. Figure fours and rock jacks shall be constructed as shown on the drawings.
F. Wire: Stretch tightly and staple to wood posts or securely attach to steel posts with standard wire clips. Wire is properly stretched when it is springy to the touch. The wire shall be free to move through the wire ties as it expands and contracts. Drive staples into wood until the staple meets the wire against the post, but not so tight as to crimp the wire or prevent movement of the wire. Do not drive staples parallel to the grain of the wood. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times.
G. Brace Wire: Double-loop and twist tight with rebar, partial t-post, or steel rod. For steel pipe panels, each wrap shall be looped once around the post (as shown in drawings).
H. Gates: Shall be installed according to the drawings and as recommended by the manufacturer when applicable.
I. Mechanical Gate Closers: Line up the latch with the gate. Adjust latch assembly after installation so that the latch does not bind, and the gate hangs properly.
J. Spiking: For spikes larger than 40d, predrilled lead holes shall be used. The hole diameter shall be three-fourths the diameter of the spike and drilled to a depth no greater than one-half the length of the spike.
3.03 EXPLOSIVES
A. Requirements: The use of explosives is prohibited.
PART 4 – MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
The work described in this section will be measured and paid for by the rod for each type of fence as measured along the ground surface next to the completed fence, including distance across gate openings, end, stress, and corner panels; cattleguards and drainage crossings. The quantities of end, stress, and corner panels, and gates to be paid for will be the actual number of these items. Note: Gates do not include adjacent end or corner panels, these are separate items.
4.02 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
| Pay Item | Pay Unit | |
| 32 31 26 – 01 Wire Fence Removal | Rod | |
| 32 31 26 – 02 Let-Down Fence Construction | Rod | |
| 32 31 26 – 03 Four-Wire Fence Construction | Rod | |
| 32 31 26 – 04 Wire Gate | Each | |
| 32 31 26 – 05 Let-Down End | Each | |
| 32 31 26 – 06 Easy-Fence Corner | Each | |
| 32 31 26 – 07 Easy-Fence Stress Panel | Each | |
| 32 31 26 – 08 Easy-Fence End | Each |
DATA WORKSHEET
for
SECTION 32 31 26 – WIRE FENCES AND GATES
FENCE TYPE 1
Fence type: 4-WIRE LET-DOWN STEEL FENCE, ALL STEEL POST Quantity of fence in rods: 994 Type of top wire: BARBED WIRE Type of intermediate wires: BARBED WIRE Type of bottom wire: BARBLESS WIRE Wire locations/dimensions in inches (spacing):
D: 12 INCHES
C: 8 INCHES
B: 6 INCHES
A: 16 INCHES
Line post spacing (L): 12 FEET, 9 INCHES Type of Stays: NO STAYS Stay spacing: N/A Length of steel posts: 5 FEET, 6 INCHES Depth of steel posts in ground: 18 INCHES Type and quantity of stress panels: EASYFENCE (5) Type and quantity of corner panels: EASYFENCE (8) Type and quantity of gates: 4-WIRE, WOOD-STAY GATE (3) Type and quantity of mechanical gate closers: PIPE & CHAIN (3)
FENCE TYPE 2
Fence type: 4-WIRE STEEL FENCE, ALL STEEL POST Quantity of fence in rods: 56 Type of top wire: BARBED WIRE Type of intermediate wires: BARBED WIRE Type of bottom wire: BARBLESS WIRE Wire locations/dimensions in inches (spacing):
D: 12 INCHES
C: 8 INCHES
B: 6 INCHES
A: 16 INCHES
Line post spacing (L): 12 FEET, 9 INCHES Type of Stays: NO STAYS Stay spacing: N/A Length of steel posts: 5 FEET, 6 INCHES Depth of steel posts in ground: 18 INCHES Type and quantity of stress panels: N/A Type and quantity of corner panels: EASYFENCE (1) Type and quantity of gates: N/A Type and quantity of mechanical gate closers: N/A
| END OF SECTION | ||
| DIVISION 32 | SECTION 32 31 26 | |
| EXTERIOR IMPROVEMENTS | WIRE FENCES AND GATES |
| 07/06/2022 | WIRE FENCES AND GATES |
| COUNTY LINE FENCE FY22 | 32 31 26 - 4 |
| H.6.0 | RESTORATION OF RESOURCES |
| H.6.1 | Cleanup – Contractor is responsible for cleaning up all camp and worksites before leaving the area. Final payment may be withheld until the Contractor has complied with this requirement. |
| H.6.2 | Access Roads – Public or private access roads damaged by the Contractor shall be restored, at contractor’s expense, to the same condition they were in at the commencement of work. |
H.7.0 FIRE DANGER SEASON
If the Contracting Officer allows the Contractor to continue work during periods of Closed Fire Season, the Contractor shall comply with all applicable State laws relating to fire prevention and with all special conditions of work as directed by the Contracting Officer.
END OF SECTION
| 07/06/2022 | RESTORATION OF RESOURCES |
| COUNTY LINE FENCE FY22 | 3 |
PART VI
SPECIFICATIONS LIST
DIVISION 1
| GENERAL REQUIREMENTS – SUMMARY | SECTION 01 10 00 |
| GENERAL REQUIREMENTS – MOBILIZATION | SECTION 01 71 13 |
DIVISION 2
EXISTING SITE CONDITIONS – DEMOLITION SECTION 02 41 00
DIVISION 6
EXTERIOR ROUGH CARPENTRY – TREATED LUMBER SECTION 06 10 63
DIVISION 32
EXTERIOR IMPROVEMENTS – FENCES AND GATES SECTION 32 31 26
| 07/06/2022 | SPECIFICATIONS LIST |
| COUNTY LINE FENCE FY22 | 1 |
PART VII
DRAWING AND MAP LIST
A. DRAWINGS
1. Cover Sheet
2. Fence Panels
3. Easy-Fence Brace Structures
4. Rock Jack & Figure Four Structures
B. MAPS
1. Project Location
2. County Line Fence
| 07/06/2022 | DRAWING & MAP LIST | |
| COUNTY LINE FENCE FY22 | 6 |
File details come from the government source that posted it. Updated .