Specifications.pdf
PDF 223 KB Posted
- Attached to
- QXDM 5G SW Subscr License
- Solicitation number
- NB675010-23-01176
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
Use this document to detail the specifications/requirements for an item and/or ancillary services.
TITLE: Boulder: QXDM 5G Software Subscription License
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Spectrum Technology and Research Division Shared Spectrum Metrology Group (672.03)
General Statement of Need:
NIST is in the process of outfitting its laboratory facilities to support research efforts related to 5th Generation (5G) cellular technology. As part of this process, NIST seeks to renew its three 5G Qualcomm UE Diagnostic Tool (QXDM) 5G Software Subscription Licenses for another year.
Items and Ancillary Services:
Item 1: QXDM 5G Software Subscription License Quantity: 3 Specifications: 1.1 Operate QXDM, QCAT and QPST
1.2 Access to QXDM Tool download
1.3 Access to QXDM CASE filing for technical support
1.4 Access to QXDM tool updates
[List any additional item(s) or service requirements using the same format.]
Service Requirements / Item Specifications:
[Provide input for each section]
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.] Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: Vu Le Mail Stop 672.03 325 Broadway Boulder, CO 80305
☐ [Alternate Shipping Address] Shipping Criteria:
☒ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to Building Required [Explain Need for Requirement]
☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☒ Delivery of Goods, Installation, and Training shall be competed no later than: 9 JUL 23 ☐ Delivery No Earlier Than: Click or tap to enter a date.
☐ Other: [List other shipping, delivery or special requirements.] [List Other Shipping, Delivery or Special Requirements.] Electronic Media ☐ N/A
[Enter Electronic Media Requirements by Item.]
☒ Software ☒ Electronic Manuals ☒ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☒ Email address for Software Delivery:
azizollah.kord@nist.gov Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details]
NOTE:
When installation is required, TPOC shall be the coordination point.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers] ☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.] ☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).] ☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.] Warranty ☐ N/A
Base Manufacturer Warranty is acceptable
[If you require an Extended Manufacturer Warranty, describe the warranty requirements per item.]
What is included?
☒ Labor ☒ Parts ☐ Travel ☐ Cost and Liability for Returns ☐ Other Installation and testing ☒ Warranty Length: 1-Year Training ☒ N/A
[Training Requirements (Who, When, What, Where)] ☐ On-Site
Is Travel Required: [Choose Answer]
☐ Off-Site Location: [Enter Location(s)] ☐ Number of Trainees: [Enter Number of Trainees] Scope of Training ☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other [Enter Other Scope Requirements] ☐ Training materials to be provided:
[Describe Requirements] ☐ Other Online / Remotely NOTE: When training is required, TPOC shall be coordinator.
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site
[Inspection Requirements Per Item] ☒ Government Acceptance Expected to Not to Exceed 7 Business Days ☐ Government Acceptance Expected to Exceed 7 Business Days [Duration] ☐ Inspection and Acceptance Plan:
[Explanation] ☐ Other:
[Enter Other Requirements] Maintenance ☒ N/A
[Describe Maintenance Requirements Per Item] Service Plan Length: [i.e. 3 - Years]
What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel
☐ Cost and Liability for Returns ☒ Software Updates ☐ Manuals l
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum) Government Furnished Material / Equipment ☒ N/A
[List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Government Equipment which will leave Government Site (TPOC must coordinate with Division Property Custodian)
Description: [Enter Description] Serial Number: [Enter Serial Number]
NIST Property Number: [Enter NIST Property Number] ☐ Other:
[Enter Other Details] Travel ☒ N/A
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
☐ Other:
[Enter Other Requirements] NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .