This is a Special Provisions document for the City of Oakland's OaklandConnect Last-Mile Broadband Project (Project No. 1007889). The document outlines special conditions and requirements applicable to the fiber network construction and implementation project. The contractor is responsible for providing all labor, equipment, materials, permitting support, traffic control, testing, and documentation necessary for the complete installation of OaklandConnect fiber infrastructure serving Community Anchor Institutions (CAIs) and affordable multi-dwelling unit (MDU) sites, with connections to designated Point-of-Presence (PoP) locations and leased fiber connection vaults. The project requires adherence to City standards and project design documents, with specific provisions governing contractor performance, coordination, and compliance obligations throughout the installation process.

The special provisions establish binding requirements and standards for contractor performance, including specifications for quality assurance, safety protocols, and project management procedures. The document delineates contractor responsibilities for obtaining necessary permits, coordinating with City departments and utility providers, managing traffic control measures, and completing all testing and documentation to City specifications. Additional provisions address insurance requirements, bonding obligations, and compliance with applicable federal, state, and local regulations. The contract terms include provisions for inspections, change orders, and dispute resolution procedures to ensure project completion meets City standards and funding requirements for this broadband infrastructure expansion initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OaklandConnect Middle and Last Mile Network Project Special Provisions for Project No. 1007889 1 Bid Documents: October 7, 2026

City Project Number: 1007889

CITY OF OAKLAND

STANDARD SPECIFICATIONS

FOR

PUBLIC WORKS CONSTRUCTION

AKA

“SPECIAL PROVISIONS”

The work to be performed under the contract includes the work described in the Notice to Bidders, all items listed in the Bid Schedule, and work shown on the plans or included in the project specifications. The work shall be performed in accordance with:

1. The “Standard Specifications for the Public Works Construction, 2015 Edition” adopted by City Council Ordinance No. 13455 C.M.S. on October 3, 2017 (aka Greenbook and hereinafter referred to as the “Standard Specifications”); and

2. These Special Provisions that modify said Standard Specifications; and

3. The “City of Oakland Standard Details for Public Works Construction 2002 Edition” (hereinafter referred to as the “Standard Details”); and

4. The latest State of California, Department of Transportation, “Standard Specifications and Standard

Plans”, shall apply for certain applicable State Standard drawings that are specified herein.

5. The latest “City of Oakland Fiber Optic Standards and OTDR Testing Requirements”

6. The latest “Middle Mile Broadband Initiative Pull Box Connection Requirements”

The section numbers used herein (e.g., “1-2 DEFINITIONS”) correspond to the section numbers of the Standard Specifications that are modified by the Special Provisions.

Copies of said Standard Specifications (GREEN BOOK) may be purchased through http://www.bnibooks.com.

A digital version of the Standard Details is available online at https://www.oaklandca.gov/resources/standard-details-for-public-works-construction http://www.bnibooks.com/ https://www.oaklandca.gov/resources/standard-details-for-public-works-construction

Project Special Provisions for Project No. 1007889 2 Bid Documents: October 7, 2026

Contents

PART 1 - GENERAL PROVISIONS 13

SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND

SYMBOLS 13

1-2 DEFINITIONS. 13

1-3 ABBREVIATIONS. 14

SECTION 2 - SCOPE AND CONTROL OF WORK 14

2-1 AWARD AND EXECUTION OF THE CONTRACT. 14

2-1.1 City Ordinance. 14 2-1.2 Approximate Estimate. 14 2-1.3 Examination of Plans, Specifications, and Site of Work. 14 2-1.4 Proposal Form. 14 2-1.5 Bid Security. 15 2-1.6 Submission and Opening of Bids 15 2-1.7. Rejection of Proposals. 15 2-1.8 Complaints. 15 2-1.8.1 Protests. 15 2-1.8.2 Release From Bid. 15 2-1.9 Award of Contract 16 2-1.10 Contract Execution. 16 2-1.11 Return of Guaranty of the Successful Bidder. 16

2-3 SUBCONTRACTS. 16

2-3.2 Self Performance. 16 2-3.4 Miscellaneous. 16

2-4 CONTRACT BONDS. 16

2-5 PLANS AND SPECIFICATIONS. 17

2-5.1 General. 17 2-5.3 Submittals. 17 2-5.3.1 General. 17

2-5.3.7 Submittal Schedule. 18

2-5.3.6 Buy America Requirements 18

2-6 WORK TO BE DONE. 19

2-8 RIGHT-OF-WAY. 19

2-9 SURVEYING. 19

2-9 SURVEYING. 19

2-9.1 Permanent Survey Markers. 19

2-10 AUTHORITY OF BOARD AND ENGINEER. 19

2-13 RE-INSPECTION AT THE END OF THE WARRANTY PERIOD. 20

2-14 GPS COORDINATES AND VERTICAL DATUM. 20

SECTION 3 - CHANGES IN WORK 20

Project Special Provisions for Project No. 1007889 3 Bid Documents: October 7, 2026

3-1 CHANGES REQUESTED BY THE CONTRACTOR. 20

3-1.1 General. 20

3-2 CHANGES INITIATED BY THE AGENCY. 21

3-2.1 General. 21

3-2.2.4 Materials Cost Escalation Clause. 21

3-2.2.4.1 General. 21

3-2.2.4.2 Asphalt Concrete Products. 22

3-2.2.4.3 Portland Cement and Structural Steel Products 22

3-2.4 Agreed Prices. 23

3-3 EXTRA WORK. 23

3-3.2 Payment. 23 3-3.2.2 Basis for Establishing Costs. 23

3-3.2.3 Markup. 24

3-5 DISPUTED WORK. 25

3-6 PROCEDURE FOR PROTEST BY THE CONTRACTOR. 25

3-7 CLAIMS PROCEDURES. 25

3-8 CLAIM APPEALS. 26

SECTION 4 - CONTROL OF MATERIALS 26

4-1 MATERIALS AND WORKMANSHIP. 26

4-1.1 General. 26 4-1.1.1 Material Furnished by the Agency 26

4-1.1.2 Required Recycled-Content Material Report. 27

4-1.1.3 Required Construction and Demolition Waste Reduction and Recycling 27

4-1.3 Inspection Requirements. 27 4-1.3.4 Reinspection and Retesting. 27

4-1.5 Certificate of Compliance. 27 4-1.6 Trade Names or Equals. 28

SECTION 5 - UTILITIES 28

5-1 LOCATION. 28

5-2 PROTECTION. 29

5-5 DELAYS. 29

5-6 COOPERATION. 29

5-6.1 Utility Work 29

5-7 UTILITY EXCAVATION BACKFILL. 29

SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 30

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. 30

6-1.1 Construction Schedule. 30 6-1.2 Commencement of the Work 30

Project Special Provisions for Project No. 1007889 4 Bid Documents: October 7, 2026

Contractor shall not pave within a 2-block radius of the following schools during school days. 31 Refer to http://www.ousd.org/Domain/3540 for the Oakland Unified School District School Calendar. 31

6-1.3 Mandatory Pre-Construction Meeting. 31 6-3.1 General. 31 6-3.3 Hazardous Material and Waste Encountered during Operations 31

6-6 DELAYS AND EXTENSIONS OF TIME. 32

6-6.1 General. 32 6-6.3 Payment for Delays to Contractor. 32 6-7.2 Working Day. 32 6-7.2 Working Day. 32 6-7.4 Contract Working Days. 33

6-8 COMPLETION, ACCEPTANCE, AND WARRANTY. 33

6-9 LIQUIDATED DAMAGES. 33

SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 34

7-1 CONTRACTOR’S EQUIPMENT AND FACILITIES. 34

7-1.1 General. 34 7-1.4 Powered Industrial Trucks, Forklifts, Heavy Equipment and Other Vehicles. 34

7-2 LABOR. 34

7-2.2 Prevailing Wages. 34

7-2.2.1 Electronic Payroll Submission. 34

7-2.2.2 Electrical Workers Safety Requirement 35

7-2.2.3 Federal Wage Rates. 35

7-3 INSURANCE 35

7-3.1 City of Oakland Insurance Requirements. 35 7-3.2 General Liability Insurance. 36 7-3.3 Workers’ Compensation Insurance. 36 7-3.4 Auto Liability Insurance. 36 7-3.5 Responsibility for Damage. 36

7-5 PERMITS AND LICENSES. 36

7-6 THE CONTRACTOR'S REPRESENTATIVE. 36

7-7 COOPERATION AND COLLATERAL. 36

7-8 WORK SITE MAINTENANCE. 37

7-8.1 General. 37 7-8.2 Air Pollution Control. 37

7-8.4.1 General. 37

7-8.6 Water Pollution Control. 37 7-8.6.1 General. 37

7-8.6.2 Best Management Practices (BMPs 38

Project Special Provisions for Project No. 1007889 5 Bid Documents: October 7, 2026

7-8.6.3 Storm Water Pollution Prevention Plan (SWPPP). 38

7-8.6.4 Dewatering. 38

7-8.6.5 Reference Publications. 39

7-8.6.6 Material Storage 39

7-8.6.7 Pavement Saw Cutting Operations. 39

7-8.6.8 Pavement Operations. 39

7-8.6.9 Concrete Operations. 40

7-8.6.10 Grading and Excavation Operations. 40

7-8.6.11 Spill Prevention and Control. 40

7-8.6.12 Vehicle/Equipment Cleaning. 41

7-8.6.13 Contractor Training And Awareness. 41

7-8.6.14 Good Housekeeping Practices 41

7-8.6.15 Payment 41

7-8.6.16 Enforcement. 41

7-8.7 Removal of Graffiti. 42 7-8.8 Contractor's Identification. 42

7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS. 42

7-10 SAFETY. 43

7-10.2 Storage of Equipment and Materials in Public Streets. 43 7-10.4 Safety. 43

7-10.4.1-2 Safety Orders. 43

7-10.4.4 Special Hazardous Substances and Processes. 44

7-10.4.5 Confined Spaces. 44

7-10.4.6 Compliance with Laws. 44

7-11 PATENT FEES OR ROYALTIES. 46

7-12 ADVERTISING. 46

7-12.1 Contract Information Signs. 46 7-12.2 Door Hanger Notifications. 46

7-13 LAWS TO BE OBSERVED. 47

7-15 Violations and Fines. 47

SECTION 9 - MEASUREMENT AND PAYMENT 47

9-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK. 47

9-1.1 General. 47

9-3 PAYMENT. 47

9-3.2 Partial and Final Payment. 47

9-3.2.1 Subcontractor Release of Retention 48

Project Special Provisions for Project No. 1007889 6 Bid Documents: October 7, 2026

DELETE FOR FEDERAL PROJECTS 48

9-3.2.2 Subcontractor/Subconsultant/Supplier Payment Certification. 48

9-3.2.3 Submittal of Certified Payrolls. 48

9-3.2.4 Required Job Site Waste Reduction and Recycling Summary Report Form 48

9-3.2.5 Prompt Payment Transmittal Form. 48

9-3.3 Delivered Materials. 48

9-3.4 MOBILIZATION. 49

9-4 AS-BUILT DRAWINGS. 49

SECTION 200 -- ROCK MATERIALS 50

200-2 UNTREATED BASE MATERIALS. 50

200-2.2 Crushed Aggregate Base. 50 200-2.4 Crushed Miscellaneous Base. 50

200-2.4.2 Grading. 50

200-2.4.3 Quality Requirements. 50

200-2.5 Processed Miscellaneous Base. 50 200-2.5.3 Quality Requirements. 50

200-2.6 Select Subbase. 50 200-2.6.3 Quality Requirements. 50

201-1 PORTLAND CEMENT CONCRETE. 50

201-1.1.4 Concrete Specified by Compressive Strength. 50

201-1.4 Mixing 51 201-1.4.3 Transit Mixers. 51

201-2 STEEL REINFORCEMENT FOR CONCRETE. 51

201-2.2.3 Welded Wire Reinforcement. 51

REPLACE SECTION 201-6 WITH THE FOLLOWING: 51

SECTION 203 – BITUMINOUS MATERIALS 53

203-5 Emulsion-Aggregate Slurry. 54 203-5.2 Materials. 54 203-5.5 Field Observation and Testing. 56

203-10.2 LATEX MODIFIED ASPHALT CONCRETE. 56

203-10.2.1 Paving Asphalt. 56

203-10.2.4 Composition and Grading. 56

203-11.10 Equipment for Asphalt Rubber Seal Coat 57

SECTION 211 - MATERIAL TESTS 58

211-1.1 Laboratory Maximum Density. 58 211-1.2 Field Density 58

Project Special Provisions for Project No. 1007889 7 Bid Documents: October 7, 2026

211-7 IMPORT FILL MATERIAL. 58

211-7.1 Definitions. 58 211-7.2 General. 58

Table 211-7.2(A). Sampling Frequency for Import Material Characterization1 58 Table 211-7.2(B). Required Analyses by Source Area Land Use History – 59 Soil and Aggregate (Not Recycled) 59 211-7.3 Screening Levels for Import Material. 60

SECTION 213-ENGINEERING GEOSYNTHETICS 60

213-1 GENERAL. 60

SECTION 214-TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT

MARKERS 60

214-5 THERMOPLASTIC MATERIAL FOR TRAFFIC STRIPING AND MARKINGS. 60

214-5.1 General. 60

SECTION 215 – NOT USED 60

SECTION 216 – PRECAST REINFORCED CONCRETE BOX 61

SECTION 217 – BEDDING AND BACKFILL MATERIALS 61

217-2 TRENCH BACKFILL. 61

217-2.1 General. 61

217-2.3 Imported Backfill. 61

306-1.3.7 Imported Backfill 61

217-5 Special Backfill. 61

SECTION 300-EARTHWORK 62

300-1 CLEARING AND GRUBBING. 62

300-1.3 Removal and Disposal of Materials. 62 300-1.3.3 Removal of Traffic Striping and Pavement Markings. 62

301-1 SUBGRADE PREPARATION. 62

301-1.6 Adjustment of Manhole Frame and Cover Sets to Grade. 62

301-2 UNTREATED BASE. 62

SECTION 302 - ROADWAY SURFACING 63

302-5.4 Tack Coat. 63 302-5.10 Asphalt Concrete Curbs. 63

302-5.10.1 Description. 63

302-5.10.2 Materials 63

302-5.10.3 Construction 63

302-5.10.4 Measurement and Payment. 63

302-7 PAVEMENT FABRIC. 63

302-7.2 Placement. 63

302-7.2.2 Tack Coat. 63

302-7.2.2.1 General 63

Project Special Provisions for Project No. 1007889 8 Bid Documents: October 7, 2026

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS,

ACCESS RAMPS, AND DRIVEWAYS. 64

303-5.1 Requirements. 64 303-5.1.1 General. 64

303-5.1.1.1 Curb Ramp Requirement for Contractor-Damaged Curb Return Areas. 64

303-5.1.1.2 Detectable Warnings 65

303-5.1.1.3 Replacement of Damaged Utility Boxes for Curb Ramp Work. 65

303-5.1.1.4 Extra Wide Ramps to Accommodate City Utility Boxes within Curb Ramp Areas 65

303-5.1.1.5 Ancillary Work for Concrete Sidewalk, Driveway, and Curb and Gutter Construction.

303-5.4 Joints. 67 303-5.4.2 Expansion Joints. 67

303-5.5 Finishing. 67 303-5.5.2 Curb. 67

303-5.5.3 Walk. 68

303-5.5.4 Gutter. 68

303-5.9 Measurement and Payment. 69

SECTION 307 - STREET LIGHTING AND TRAFFIC SIGNALS 72

307-1 GENERAL. 72

307-1.1 Equipment List and Drawings. 73

307-2 Maintenance of Existing and Temporary Systems. 73 307-2.2 Scheduling of Work. 74

307-7 EXCAVATION AND BACKFILL. 74

307-7.1. General. 74 307-7.2 Trenches. 74 307-7.2a Pavement Restoration. 75 307-7.3 Payment 75

307-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS 75

307-8.2a Cast-In-Drilled-Hole Concrete Pile Foundations. 76

307-8.5 Measurement. 76 307-8.6 Payment. 76

307-10 STANDARDS, PEDESTALS AND MAST ARMS. 76

307-10.1 General. 76 307-10.3 Measurement. 76 307-10.4 Payment. 76

307-11 PULL BOXES. 76

307-11.1 General. 76 307-11.3 Payment. 77

Project Special Provisions for Project No. 1007889 9 Bid Documents: October 7, 2026

307-12 CONDUIT. 77

307-12.1 General. 77 307-12.6 Payment. 78

307-13 WIRES, CONDUCTORS AND CABLES. 78

307-13.1 General. 78 307-13.2 Splices. 79 307-13.4 Bonding and Grounding. 79 307-13.5 Restoration of Existing Wires and Cables. 79

307-14 SERVICES 79

307-14.1 General. 79 307-14.2 Services on Utility-Owned Poles. 79 307-14.6 Service Pedestal. 79 307-14.7 Measurement. 79 307-14.8 Payment. 80 307-15.1 General. 80

307-16 STREET LIGHTING CONSTRUCTION. 80

307-16.2 Pull Box Covers 80 307-16.4 Wiring/Conductors. 80 307-16.7 Service. 80 307-16.8 Luminaires. 80

307-16.8.1 General 80

307-17 TRAFFIC SIGNAL CONSTRUCTION. 80

307-17.1 General. 80

307-17.2.5 Measurement. 80

307-17.2.6 Payment. 80

307-17.3 Pull Box Covers. 81 307-17.5 Wiring, Conductors and Cable 81

307-17.5.1 General. 81

307-17.5.5 Fiber Optic Cable. 81

307-17.5.5.1 General 81

307-17.5.5.2 Installation. 81

307-17.5.5.2a Installation in Conduit Occupied by Existing SIC 82

307-17.5.5.2b Installation in Conduit Occupied by Existing Traffic Signal Cables and Other Cables

307-17.5.5.3 Splicing and Termination of Fiber Optic Cable. 82

307-17.5.5.5 Splice And Cable Logging/Cable Identification 83

307-17.5.5.7 Hub Switch. 84

Project Special Provisions for Project No. 1007889 10 Bid Documents: October 7, 2026

307-17.5.5.7a Fiber Termination Panel 84

ADD NEW SUBSECTION 370-17.5.5.7b TO READ 84

307-17.5.5.8 Payments. 84

307-17.6.2 Signal Head Mountings. 85

307-17.6.5 Measurement. 85

307-17.6.6 Payment. 85

307-17.7.3 Inductive Loop Detectors. 85

307-17.7.4 Magnetometer Detectors. 86

307-17.7.5 Video Detection Camera 86

307-17.8.4 Payment. 86

307-19 PAINTING AND GALVANIZING. 86

307-20 SALVAGE. 87

307-21 Global Positioning System (GPS) Time Source 87

307-21.1 General. 87 307-21.2 Payment. 87

307-22 Internally Illuminated Street Name Sign (IISNS) 87 307-22.1 General. 87 307-22.2 Payment. 87

307-23 Pan-Tilt-Zoom (PTZ) Closed Circuit Television (CCTV) Camera System 87 307-23.2 Payment. 87

SECTION 310 – PAINTING 88

310-5 PAINTING VARIOUS SURFACES. 88

310-5.6 Painting for Traffic Striping, Pavement Markings, and Curb Markings. 88 310-5.6.1 General. 88

310-6 Pavement Traffic Striping Replacement. 88 310-6.1 General. 88

310-6.1.1 As-Built Striping and Marking Plans. 89

310-6.2 Preformed Traffic Striping. 89 310-6.2.1 General. 89

310-6.2.2 Classification 89

310-6.2.3 Requirements. 89

310-6.2.4 Beads. 89

310-6.2.5 Skid Resistance. 90

310-6.2.6 Thickness. 90

310-6.2.7 Performance Requirements & Material Replacement Obligations. 90

Project Special Provisions for Project No. 1007889 11 Bid Documents: October 7, 2026

310-6.3 Thermoplastic Traffic Striping and Reflective Pavement Markers. 90 310-6.3.1 General. 90

310-6.3.2 Thermoplastic Material. 90

310-6.3.3 Application. Thermoplastic Traffic Striping application shall conform to Section 84.204 of State Department of Transportation’s Standard Specifications and the following provisions: 90

310-6.3.4 Reflective Pavement Markers. 90

310-6.4 Measurement and Payment. 91 310-7 Crosswalks, Limit Lines, and Pavement Markings. 91

310-7.1 General. 91 310-7.2 Measurement and Payment. 91

SECTION 313 – PAVEMENT BASE REPAIR 91

313-1 General. 91

SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT

MARKERS 92

314-5 PAVEMENT MARKERS. 92

PART 4 -- ROCK PRODUCTS 92

SECTION 400 – ALTERNATE ROCK PRODUCTS, ASPHALT CONCRETE, PORTLAND

CEMENT CONCRETEAND UNTREATED BASE MATERIAL 92

400-4 ASPHALT CONCRETE. 92

400-4.1 General. 92

SECTION 600 – ACCESS 93

CHANGE SUBSECTION 600-3 TO READ: 93

SECTION 601 – WORK AREA TRAFFIC CONTROL 93

ADD NEW SUBSECTION 601-1.1 TO READ: 93

601-1.1 Restricted Hours of Operation and Streets. 93

ADD NEW SUBSECTION 601-1.2 TO READ: 94

601-1.2 Existing Traffic Signals, Street Signs, Regulatory Signs. 94

601-1.3 Vehicular Traffic. 94

601-1.1.4 Changeable Message Sign (CMS). A 94 601-1.5 Street Closures, Detours, Barricades. 94

601-2.1 UNIFORM SAFETY STANDARDS. 95

SECTION 700 – MATERIALS 96

700-1 GENERAL. 96

700-3 COMMON COMPONENTS. 96

700-3.1 City furnished material list 96 700-3.5 Conduit. 96

700-3.5.1 General. 96

700-3.7 Pull Boxes 97 700-5.3.1 General. 97

Project Special Provisions for Project No. 1007889 12 Bid Documents: October 7, 2026

700-5.3.4 Fiber Optic Cable 97

700-5.3.4.1 General 97

700-5.3.4.2 SMFO Trunk Cable 97

700-5.3.4.3 12 SMFO Branch Cable 98

700-5.3.4.4 Fiber Optic Jumper Cable 98

700-5.3.4.5 Fiber Optic Pigtails 98

700-5.3.4.6 Underground Fiber Splice Closures 98

700-5.3.4.7 Fiber Termination Panel. 98

700-5.3.4.9 Fiber Switch. 99

ATTACHMENTS 100

Attachment 2 103 Attachment 3 104 Attachment 4 105 Attachment 5 106 Attachment 6: 107 Attachment 7: 108 Attachment 9A: 111 Attachment 10 112 Attachment 11 113 Attachment 12 114 Attachment 12 115

211-7 IMPORT FILL MATERIAL. 115

211-7.1 Definitions. 115 211-7.2 General. 115

Table 211-7.2(A). Sampling Frequency for Import Material Characterization1 115 Table 211-7.2(B). Required Analyses by Source Area Land Use History – 116 Soil and Aggregate (Not Recycled) 116 211-7.3 Screening Levels for Import Material. 117

EXAMPLE 118

Attachment 13 – Monthly Asset Form (1 of 2) 118 Attachment 13 – Monthly Asset Form (2 of 2) 119 Attachment 14 120 Attachment 15 121

Project Special Provisions for Project No. 1007889 13 Bid Documents: October 7, 2026

PART 1 - GENERAL PROVISIONS

Part 1 of the Special Provisions shall conform to Part 1 of the Standard Specifications except as modified herein.

SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND

SYMBOLS

1-2 DEFINITIONS.

CHANGE THE DEFINITIONS OF THE FOLLOWING WORDS OF SUBSECTION 1-2:

Addendum: A change or changes made in one or more of the contract documents after bids are invited and before bids are received.

Agency: The City of Oakland, California, a municipal corporation.

Board: The Council of the City of Oakland.

Contract: The written agreement covering performance of the work including, but not limited to, the executed formal contract, Notice to Bidders, proposal, bonds, plans, specifications, addenda and any executed change orders.

Engineer: The City Engineer of the City of Oakland, acting either directly or through authorized agents, such agents acting within the scope of the particular duties entrusted to them.

ADD THE FOLLOWING NEW DEFINITIONS TO SUBSECTION 1-2:

Acceptance: The Engineer’s formal written acceptance of an entire contract that has been completed in all respects in accordance with the plans and specifications and any modifications thereof previously approved.

Architect: Same as "Engineer."

Building Sewer: The 4-inch, 5-inch, 6-inch, or 8-inch sewer pipe, also known as "lateral", within both the public right-of way and the private property connecting the building or house to, and including, the connection at the public sewer in the right-of-way or easement. Includes both the "house sewer" and the "house connection sewer."

Building Sewer Connection: (House Connection) The connection at the public sewer in the public right-of-way or easement, to the 4-inch, 5-inch, 6-inch, or 8-inch building sewer.

City: Same as "Agency."

City Clerk: The City Clerk of the City of Oakland.

Council: Same as "Board."

City Administrator: City Administrator of the City of Oakland.

City Treasury: City Treasury of the City of Oakland.

Contract Services: The Contract Services Division of the Department of Public Works. This division is responsible for advertising, bidding and executing the contracting process.

Contract Compliance: The Contracts and Compliance Division of the City Administrator's Office.

Contract Compliance Officer: A subordinate of the Contracts and Compliance Division who is responsible for enforcement of the labor, subcontractor, and supplier provisions of the contract.

Electrolier Standard: The shaft or pole used to support the luminaire arm, luminaire, etc.

Inspector: Same as "Engineer."

Hearing Officer: The Engineer or his/her designee. The Hearing Officer shall be at least one administrative level above the Inspector or Resident Engineer assigned to the project.

Laboratory: The official materials testing laboratory of the City of Oakland or other laboratories authorized by the Engineer to provide quality assurance. The records and reports of tests may be examined if they are available at the job site.

Landscape Architect: Same as "Engineer."

Local Public Agency: The City of Oakland.

Lower Lateral: (House Connection Sewer) That portion of the building sewer existing from the building sewer connection to the Two-Way cleanout.

Owner: The City of Oakland.

Payment Bond: Material and Labor Bond.

Project Special Provisions for Project No. 1007889 14 Bid Documents: October 7, 2026

Performance Bond: Faithful Performance Bond.

Public Body: The City of Oakland.

Specifications: The term used herein refers to both the Standard Specifications and Special Provisions.

Two-way Cleanout: (Also known House Connection Cleanout or 2-Way Cleanout.) A 4-inch or 6-inch two-way fitting, no hub, cast iron cleanout installed on the building sewer within the public right-of-way.

Upper Lateral: (House Sewer) That portion of the building sewer existing from the Two-Way Cleanout to the building connection.

1-3 ABBREVIATIONS.

ADD THE FOLLOWING NEW ABBREVIATIONS TO SUBSECTION 1-3:

ABAG: Association of Bay Area Governments ADA: Americans with Disability Act CAL-OSHA: California Occupational Safety and Health Administration CALTRANS: California Department of Transportation EBMUD: East Bay Municipal Utility District HR: Hour OMC: Oakland Municipal Code OPW: Oakland Public Works Department of the City of Oakland ISA: International Society of Arboriculture PAV: Pressure Aging Vessel RTFO: Rolling Thin Film Oven PG: Performance Graded SFRWQCB: San Francisco Regional Water Quality Control Board

SECTION 2 - SCOPE AND CONTROL OF WORK

CHANGE SUBSECTION 2-1 TO READ:

2-1 AWARD AND EXECUTION OF THE CONTRACT.

2-1.1 City Ordinance. The bidder shall conform to provisions of Ordinance No. 7937 CMS of the City of Oakland, as amended, that may be applicable to its bid or to the contract awarded it.

2-1.2 Approximate Estimate. Unless otherwise specified in the Special Provisions or bid documents as being lump sum items, any quantities given in the specifications, proposal and contract forms are approximate only, being given as a basis for comparing bids. The City of Oakland, does not, expressly or by implication, agree that the actual work amount will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work, as may be deemed necessary or advisable by the Engineer.

2-1.3 Examination of Plans, Specifications, and Site of Work. The bidder shall examine carefully the contemplated work site and the proposal, plans, specifications and contract forms. It will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of these specifications and the contract. It is mutually agreed that submission of a proposal shall be considered prima facie evidence that the bidder has made such examination.

2-1.4 Proposal Form. All proposals must be made upon forms contained in the proposal section of the bound project documents.

Bids are required for the entire work. The bid amount, for comparison purposes, will be the total of all items. The total of unit basis items will be determined by extension of the item price bid on the basis of the estimated quantity set forth for the item.

The bidder shall set forth for each item of work, in clearly legible figures, an item price and a total price for the item in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the item price bid on the basis of the estimated quantity.

In case of a discrepancy between the item price and the total set forth for the item, the item price shall prevail. However, if the amount set forth as an item price is ambiguous, unintelligible, or uncertain for any cause, or if omitted, or in the case of unit basis items, is the same amount as the entry on the "Total" column, then the amount set forth in the "Total" column for the items shall prevail in accordance with the following:

1) As to lump sum items, the amount set forth in the "Total" column shall be the item price.

Project Special Provisions for Project No. 1007889 15 Bid Documents: October 7, 2026

2) As to unit basis items, the amount set forth in the "Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the item price. All bids shall be clearly and distinctly written. The bidder, who shall fill in all blanks in the proposal forms as therein required, shall sign the proposal.

3) As to add or subtract alternate bids, any discrepancy between the proposal form and changes made by the bidder, the amount shown will be for the alternate as shown on the proposal form.

2-1.5 Bid Security. Each bidder shall submit with the bid security either cash, certified check or cashier's check of or on some responsible United States Bank, in favor of and payable at sight to the City of Oakland, in an amount not less than ten percent (10%) of the base bid amount. The Contractor must use only the City of Oakland bid security form included with the project documents; bid security forms originating from other institutions will not be accepted. Any contractors not complying with this requirement may be determined to be non-responsive/non-responsible bidders.

To be valid, the original copy must be delivered to the City Clerk's Office within 24 hours of the time and date of the bid opening. If the bidder to which the contract is awarded shall, for 20 calendar days after receipt of such contract, fail or neglect to enter into the contract and file the required bonds, the bid security shall be forfeited as liquidated damages. The City Administrator shall draw the money due on such bid security and pay the same or any cash deposited into the City Treasury, and under no circumstances shall it be returned to the defaulting bidder. In lieu of the foregoing, any bid may be accompanied by a surety bond on a forfeiture form supplied by the City of Oakland in said amount furnished by a corporate surety authorized to do a surety business in the State of California, guaranteeing to the City that said bidder will enter into the contract and file the required bonds within said period.

The bidder’s failure to enter into the contract after award will result in damages to the City. Such damages are, and will continue to be, impracticable and extremely difficult to determine.

All bid securities and bid bonds will be returned to the unsuccessful bidders after contract award to the successful bidder. The bid security and bid bond of the successful bidder shall be returned after execution of the contract and deposit of the necessary bonds.

If all the bids are rejected, all bids and bid bonds will be returned to the bidders.

2-1.6 Submission and Opening of Bids. All bids shall be sealed, identified as bids on the envelope, and submitted to the City Clerk at the place and time specified in the public Notice to Bidders. The City Administrator or his/her designated representative will open the bids, in public, at the time and place designated in the Notice to Bidders. Bids received after the specified time shall not be accepted and shall be returned to the bidder unopened.

2-1.7. Rejection of Proposals. Proposals may be rejected if they contain erasures, interlineations, or irregularities of any kind. The Council reserves the right to reject any and all bids. The Council may reject the bid of any party who has been delinquent or unfaithful in any former contract with the City and shall reject all bids other than the lowest responsible regular bid.

More than one proposal from an individual, firm, partnership, corporation or combination thereof under the same or different name will not be considered.

Reasonable grounds for believing that any individual, firm, partnership, corporation or combination thereof has a financial interest in more than one proposal for the work contemplated may cause the rejection of all proposals in which such individual, firm, partnership, corporation or combination thereof is interested. If there is reason for believing that collusion exists among bidders, any or all proposals may be rejected. Proposals in which the prices obviously are unbalanced may be rejected. If all bids are rejected, the Agency may again invite sealed proposals as in the first instance.

2-1.8 Complaints. Any bidder or other interested party desiring to enter a complaint against any part or provision of these specifications or the requirements in bidding must file the same in writing in the Office of the City Clerk not later than five working days preceding the date set for submission of the bids.

2-1.8.1 Protests. Any bidder or other interested party desiring to protest against any party bid must file a written statement with the Office of the City Clerk not later than five (5) working days after the bid opening date.

2-1.8.2 Release From Bid. A bidder shall not be relieved of the bid unless by consent of the City, nor shall any change be made in the bid because of a mistake. A bidder may be relieved of its bid if: a mistake is made;

he or she gave the Contracts and Compliance Unit and the City Clerk notice within five working days after the bid opening of the mistake, specifying in the notice in detail how the mistake occurred; the mistake made the bid materially different than he or she intended it to be; and, the mistake was made in filling out the bid and not due to error in judgment or to carelessness in inspecting the work site, or in reading the plans and specifications.

Project Special Provisions for Project No. 1007889 16 Bid Documents: October 7, 2026

2-1.9 Award of Contract. The contract award, if made, will be by the Council and will be to the lowest responsible bidder whose proposal complies with all the requirements of the Specifications and Ordinance No.

7937 CMS as amended. If the contract award is made within 90 days from opening of the bids, the Contractor will be required to hold the bid price. If the contract award is made more than 90 days, the contractor has the option to notify the City in writing to withdraw their bid within 5 working days from the contract award date. Otherwise, the contractor must hold the bid price. All bids will be compared on the basis of the Engineer's estimate of quantities of work to be done and/or lump sum bid items. The Council reserves the right to waive any informality or minor irregularity in the bids.

2-1.10 Contract Execution. The contract shall be signed by the successful bidder and returned together with the contract bonds, appropriate insurance documents and a copy of Form DE6 (Quarterly Wage Report) for the prime and subcontractors listed in the bid proposal, within 14 days after the receipt of such contract. If the bidder fails or refuses to enter into the contract to do the work, or fails to provide the contract bonds, appropriate insurance documents and the prime and subcontractor’s Form DE6 (Quarterly Wage Report) as required, then the certified check or bid bond accompanying this bid and the amount herein mentioned shall be forfeited, and/or a fine of $1,000 per day, shall be collected by the City of Oakland and paid into the City Treasury.

2-1.11 Return of Guaranty of the Successful Bidder. The check or bid bond accompanying the accepted bid will be held by the City Clerk until the contract has been entered into, and the bonds accompanying the same are approved and filed, whereupon the certified check or bid bond will be returned to the successful bidder.

2-3 SUBCONTRACTS.

2-3.2 Self Performance.

REPLACE SUB-SECTION 2.3.2 WITH THE FOLLOWING:

The Contractor shall perform, with its own organization, Contract work amounting to at least 30 percent of the Contract Price except that any designated "Specialty Items" may be performed by subcontract and the amount of any such "Specialty Items" so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. "Specialty Items" will be identified by the Agency in the Bid or in the Special Provisions. Where an entire item is subcontracted, the value of work subcontracted will be based on the Contract Unit Price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contract Unit Price. This will be determined from information submitted by the Contractor, and subject to approval by the Engineer.

ADD NEW SUBSECTION 2-3.4:

2-3.4 Miscellaneous. The Contractor may utilize the service of specialty Subcontractors on those parts of the work that, under normal contracting practices, is performed by specialty Subcontractors.

The Contractor shall not award any work to any Subcontractor without prior written approval of the City.

Approval will not be given until the Contractor submits to the City a written statement concerning the proposed award to the Subcontractor, which statement shall contain such information as the City may require.

The Contractor shall be as fully responsible to the City for the acts and omissions of persons directly employed by him.

The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind Subcontractors to the Contractor by the terms of the General Provisions and other contract documents insofar as applicable to the work of Subcontractors and to give the Contractor the same power as regards terminating any subcontract that the City may exercise over the Contractor under any provisions of the contract documents.

Nothing contained in this contract shall create any contractual relation between any Subcontractor and the City.

2-4 CONTRACT BONDS.

REPLACE THE SECOND AND THIRD SENTENCES OF THE FIRST PARAGRAPH WITH THE FOLLOWING:

All surety bonds, including bid, performance and payment bonds, must be furnished by a corporate surety admitted in the State of California or Lloyds of London, except as follows:

• If the contract award is $5,000,000 or less, the surety bond may be furnished by a United States

Project Special Provisions for Project No. 1007889 17 Bid Documents: October 7, 2026 non-admitted corporate surety which appears on the Treasury List subject to the bonding limits which the Treasury List imposes on such surety; or,

• If the contract award is $1,000,000 or less, the surety bond may be furnished by a United States non-admitted corporate surety which has an A.M. Best rating of A+; or,

• If the contract award is $500,000 or less, the surety bond may be furnished by a United States non-admitted corporate surety that has an A.M. Best rating of A-.

ADD THE FOLLOWING AFTER THE SECOND SENTENCE OF THE THIRD PARAGRAPH:

The percentage of the Payment Bond shall be as listed in the Notice to Bidders. The Payment Bond shall guarantee payment of all claims for labor and material unfurnished, for amounts due under the Unemployment Insurance Act with respect to such work or labor, or any amounts required to be deducted, withheld and paid over to the Franchise Tax Board from the wages of employees pursuant to Section 18806 of Revenue and Taxation Code with respect to such work and labor as required by the California Civil Code Section 3247, et.

seq.

REPLACE THE FOURTH PARAGRAPH WITH THE FOLLOWING:

The percentage of the Performance Bond shall be as listed in the Notice to Bidders. The Performance Bond shall guarantee faithful performance of all work, within the time prescribed, in a manner satisfactory to the Agency, and that all materials and workmanship will be free from original or developed defects. The Performance Bond must remain in effect until the end of all warranty periods set forth in the Contract.

2-5 PLANS AND SPECIFICATIONS.

2-5.1 General.

ADD THE FOLLOWING TO THE END OF SUBSECTION 2-5.1:

All work shall be performed in compliance with all applicable (most recent editions) federal, state and local codes, code amendments, and ordinances such as, but not limited to, the following:

• California Manual of Uniform Traffic Control Devices (MUTCD),

• Uniform Building Code, State Building Code,

• Uniform Plumbing Code,

• Uniform Mechanical Code,

• Uniform Fire Code,

• Uniform Electrical Code,

• "Work Area Traffic Control Handbook."

Unless otherwise noted in the contract documents, the Uniform Building Code shall apply to the construction, alteration or repair of all City facilities including bridges, pedestrian walkways, and pumping stations.

2-5.3 Submittals.

2-5.3.1 General.

ADD NEW PARAGRAPHS AT END OF SUBSECTION 2-5.3.1.1 TO READ:

2-5.3.1.1 Electronic Submittals. The Contractor shall provide submittals in electronic format when possible and as directed by the City. The Contractor shall establish electronic submittal transfer application or sharable portals as necessary to transmit electronic submittal files too large to be submitted via email.

ADD NEW PARAGRAPHS AT END OF SUBSECTION 2-5.3.3 TO READ:

Attachment 1, the project submittal list, at the end of the Special Provisions details project submittal requirements. This list is intended to be comprehensive, but no claim for completeness is implied, and submittal of each and every item on the lists shall not relieve the Contractor of supplying all information needed, or of complying with any of the other requirements of the specifications. Revised lists may be issued, and items may be added to the list supplied.

The Contractor shall use Attachment 2, the submittal transmittal form at the end of the Special Provisions, to certify that the proposed submittal meets the requirements of the project Special Provisions and the Standard Specifications. This form indicates what party (i.e. Contractor = CONTR; Subcontractor = SUB) shall sign the transmittal form.

The Contractor is responsible for providing all required submittals. The City may request additional itemized lists of materials, equipment and fixtures furnished and installed by the Contractor. These requests

Project Special Provisions for Project No. 1007889 18 Bid Documents: October 7, 2026 for itemized lists shall be made in writing specifying the items and details required. The Contractor shall provide these itemized lists within ten working days of the receipt of the written request. The Contractor’s failure to provide said lists will delay payment to the Contractor until such lists are received The Contractor shall provide submittals showing the locking or theft-deterrent mechanisms to be installed on all City streetscape furniture such as trash receptacles, benches, tree grates, bollards, newspaper racks, etc. Such mechanisms shall be as recommended by the product manufacturer. Such theft-deterrent devices shall not pose a tripping hazard to pedestrians. The Contractor shall not order these items until the Engineer has approved the locking procedure detailed in the submittal.

ADD NEW SUBSECTION 2-5.3.7 TO READ:

2-5.3.7 Submittal Schedule. The Contractor shall, within fifteen (15) calendar days after receipt from the City of the Notice to Proceed on this Contract, or another period of time as determined by the City, prepare and submit to the City, for Review and Concurrence, a comprehensive submittal schedule. This schedule shall identify all submittal items required by the Contract, or as otherwise requested by the City.

The submittal schedule shall include the date by which the item will be submitted to the City, whether the submittal is for approval or for record, the date by which approval is required, and the date by which the material or equipment must be on site in order not to delay the progress of the Work.

In preparing the submittal schedule, the Contractor shall consider the nature and complexity of each submittal item and shall allow adequate time for review, revision or correction, resubmittal, and approval sufficiently in advance of the construction requirements in order not to delay the progress of the Work. The submittal schedule shall allow adequate time for review of each submittal item prior to submittal to the City.

Review and Concurrence of the submittal schedule is a precondition to the City making the first progress payment under the payment provisions of this contract.

ADD NEW SUBSECTION 2-5.3.6 TO READ:

2-5.3.6 Buy America Requirements A Certificate of Compliance shall be furnished prior to the use of any materials for which these specifications or the special provisions require that a certificate be furnished. Steel and iron materials must be produced in the U.S. except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)].

2. If the total combined cost of the materials does not exceed the greater of 0.1 percent of the total bid or $2,500, materials produced outside the U.S. may be used.

Production includes:

1. Processing steel and iron materials, including smelting or other processes that alter the physical form or shape (such as rolling, extruding, machining, bending, grinding, and drilling) or chemical composition.

2. Coating application, including epoxy coating, galvanizing, and painting, that protects or enhances the value of steel and iron materials.

In addition, when so authorized in these specifications or in the special provisions, the Engineer may permit the use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance. The certificate shall be signed by the manufacturer of the material or the manufacturer of assembled materials and shall state that the materials involved comply in all respects with the requirements of the specifications. A Certificate of Compliance shall be furnished with each lot of material delivered to the work and the lot so certified shall be clearly identified in the certificate.

Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material in the work which conforms to the requirements of the plans and specifications, and any material not conforming to the requirements will be subject to rejection whether in place or not.

The City reserves the right to refuse to permit the use of material on the basis of a Certificate of Compliance.

The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer.

Project Special Provisions for Project No. 1007889 19 Bid Documents: October 7, 2026

2-6 WORK TO BE DONE.

ADD NEW PARAGRAPH TO THE END OF SUBSECTION 2-6 TO READ:

Any work done beyond lines and grades established by the Engineer pursuant to the plans or any extra work done without written authority of the Engineer, shall be considered as unauthorized work and no compensation will be allowed, therefore. The Engineer shall have the authority to have such work removed and the area restored, and to deduct the cost thereof from money due the Contractor.

REPLACE SUBSECTION 2-8 WITH THE FOLLOWING:

2-8 RIGHT-OF-WAY. The Contractor shall perform work within the public right-of-way or easements shown on the plans. The right to enter onto private property outside the public right-of-way or easement shall be obtained in writing from the property owner by the Contractor at the Contractor's expense. Mobilization and staging areas outside the City right-of-way shall be obtained at the Contractor's expense.

The Contractor shall be solely responsible for damages to persons or property occurring during or as a result of the Contractor's entry onto private property outside the right-of-way or easement area.

The Contractor shall defend and hold the City harmless from any and all claims, causes of action, demands or judgments resulting from the Contractor's entry onto private property outside the right-of-way or easement area.

2-9 SURVEYING.

DELETE SUBSECTION 2-9 AND REFER TO DIVISION 1 OF THE SPECIFICATIONS FOR SURVEYING

REQUIREMENTS.

2-9 SURVEYING.

2-9.1 Permanent Survey Markers.

REPLACE THE LAST SENTENCE OF THE FIRST PARAGRAPH OF SUBSECTION 2-9.1 WITH THE

FOLLOWING:

The Contractor’s California-Licensed surveyor shall reference the location and file a corner record with the County Surveyor of Alameda for all known project monuments and provide official copies of the County’s corner records to the City Surveyor prior to doing any construction work. The Contractor shall note that it can take Alameda County Records Office up to four weeks to accept and file corner records. The unit price paid for each bid item Pre and Post Construction Monument Verification shall include full compensation for all labor, materials, surveying, incidentals, and filing costs as required by law.

If it is necessary to remove or replace a City monument in conjunction with the work associated with this contract, the Contractor shall provide two week’s notification to the office of the City Surveyor and, under the direction and supervision of the City Surveyor, the monument will either be temporarily removed and later replaced, or it will be relocated to another location. The unit price for each bid item Reset Monument shall include full compensation for all labor, materials, surveying, incidentals, and filing costs as required by law for resetting (raising its frame and cover to meet new grades)/relocating a monument. Markers that otherwise are lost or disturbed by its operations shall be replaced at the Contractor's expense by a City survey crew or by a person licensed to practice land surveying in California as determined by the Engineer.

ADD FOLLOWING SUBSECTION 2-9.5

2-9.5 PAYMENT FOR SEWER MANHOLE SURVEY

This bid item will be measured for payment by the number of each manhole surveyed by a licensed land surveyor and will be paid for at the unit price bid thereof. The Contractor shall survey all sewer structures within the project limits. Contractor’s survey data shall include sewer structure number, coordinate, depths, rim, inverts, internal pipelines and structure crossing elevations, and flowline information; contractor shall submit the survey data to the Engineer in a 2018 or higher AutoCAD file. All surveyed information shall be recorded on As-Built drawings as part of this bid item and no additional cost shall be made. This bid item includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals required for performing survey and all costs incurred from the requirements of SECTION 2.9.

2-10 AUTHORITY OF BOARD AND ENGINEER.

ADD THE FOLLOWING THREE PARAGRAPHS TO SUBSECTION 2-10:

No member of or Delegate of Congress, or Resident Commissioner shall be admitted to any share or part of this contract or to any benefit that may arise there from, but this provision shall not be construed to extend

Project Special Provisions for Project No. 1007889 20 Bid Documents: October 7, 2026 to this contract if made with a corporation for its general benefit.

No official of the City who is authorized in such capacity and on behalf of the City to negotiate, make, accept or approve, or to take part in negotiating, making, accepting or approving any architectural, engineering, inspection, construction or material supply contract or any subcontract in connection with the construction of the project, shall become directly or indirectly interested personally in this Contract or in any part hereof. No officer, employee, architect, attorney, engineer or inspector of or for the City who is authorized in such capacity and on behalf of the City to exercise any legislative, executive, supervisory, or other similar functions in connection with the construction of the project, shall become directly or indirectly interested personally in this contract or in any part thereof, any material supply contract, subcontract, insurance contract or any other contract pertaining to the project.

Prior federal approval may be required on changes in the work and final acceptance.

ADD NEW SUBSECTION 2-13 TO READ:

2-13 RE-INSPECTION AT THE END OF THE WARRANTY PERIOD. The Contractor shall include in the bid the cost for re-inspection of completed work just prior to the expiration period of the warranty. The Contractor and Engineer shall meet together on the project site to re-inspect all of the work just prior to the expiration of the warranty period. If any warranty items are discovered, then corrective work shall be completed within 60 calendar days.

ADD NEW SUBSECTION 2-14 TO READ:

2-14 GPS COORDINATES AND VERTICAL DATUM. GPS coordinates shall be based on one of these two systems:

1. NAD_1983_StatePlane_California_III_FIPS_0403_Feet [NAD83] or in

2. WGS 84

The vertical datum shall be NAVD88.

SECTION 3 - CHANGES IN WORK

3-1 CHANGES REQUESTED BY THE CONTRACTOR.

REPLACE SUBSECTION 3-1.1 WITH THE FOLLOWING:

3-1.1 General. The General Contractor shall submit to the Engineer, in writing, requests for changes in products, materials, equipment, and construction methods required by the contract documents. These requests for changes will be received and considered by the Engineer when the Contractor has demonstrated and/or indicated in writing that:

• the request does not require extensive revision to the contract documents;

• that the proposed changes are in keeping with the general intent of the contract documents; and

• the request is timely, fully documented and properly submitted.

In addition, the requests for changes will only be considered if they do not impair, in any manner, essential project functions or characteristics, including but not limited to service life, economy of operation, ease of maintenance, desired appearance, or design and safety standards. These requests for changes shall be submitted only during the substitution period stipulated in the contract documents, or within 15 calendar days of the Notice to Proceed date if no substitution period is stipulated. All requests received more than 15 calendar days after the Notice to Proceed date or after the stipulated substitution period will be rejected.

It is not the intent of these Specifications to exclude the use of any meritorious product of equal value, however the burden of proof of equality lies with the Contractor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .