Attachment_2_Bldg_289_&_292.pdf

PDF 2 MB Posted

Attached to
Office Furniture Federal contract opportunity
Solicitation number
SPE605-20-R-0201
Issued by
Defense Logistics Agency Energy

About this file

This performance work statement requires the contractor to design and install new ergonomic cubicle workstations, private offices, and executive suites in two buildings on a Navy base in Bahrain. The contractor must disassemble and remove thirty-eight existing workstations to make way for twenty-seven new cubicle workstations across five floors, eleven private offices, two executive suites, and one standing IT workstation. All workstations and furniture must meet industry ergonomic standards. The contractor is responsible for running necessary cables and completing the project by December 31, 2019 at the Defense Logistics Agency Energy facility in Bahrain, with a meeting required within fifteen days of award to discuss the plan of action. The key point of contact is listed.

Floor Plan and Layout

View the file

Other files for this federal contract opportunity

Other files attached to Office Furniture, newest first.
File Type Posted
SPE605-20-R-0201_Amendment_0003.pdf PDF
Amendment_0002__20-R-0201.pdf PDF
ATTACHMENT_2_Bldg_292_SPE605-20-R-0201.pdf PDF
ATTACHMENT_1_Bldg_289_SPR605-20-R-0201.pdf PDF
Bldg_292.pdf PDF
Amendment_0001_20-R-0201.pdf PDF
PERFORMANCE_WORK_STATEMENT.pdf PDF
SF-1449_SPE605-20-R-0201.pdf PDF
Furniture_Layout.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

--------3730------�

N N l l2-llept-lB U.S.Navy-DLA@ Juffair �1-----

H.M Furniture Layout

Chief of Operations Office

WO'J/18

- IW.f lllwqMx

-::: ... 4!. •••• 10144

M.I)

,f-----2670-----.

f"1

L/F BC185

,.,�\ .. - .:l/·-

12-Stpl-18 U.S.Navy-DlA@ Juffair

Furniture Layout r"'

Im

165*165 w

• 3

Chief of Operations Office

IZ/09/18

I 40 0 A4 DIIMnli:lll-ta•

Iauedfor

""·. Dranv No: •••• 10143

M.b

IZ-Bepl-18

U.S.Navy-DLA @ Juffair ,,..,....1----------;-

Fumiture Layout H.M

DOWN

-0

OPERATIONS 3rd FLOOR

Iaued for A M.D

IW.• -No: lln'n

-�;--;:::-1 .... 10142 0

12-Bept-18

O

U.S.Navy-DLA@ Juffair

0 0

R 2.4 Partn. 165Ht, overhead Cabibets

�R 3.1 Partition 165Ht. a:

with Top clear glass. a

El 12/09/18

�. Furniture Layout -

: 75 0 M

SUPPLIER

OPERATIONS

�for

11111'.f DlonvNo:

Mb Ill'

111,fn

J'-------4000-----------.r

I "' l

I ' i/�

C) r � n r" ._ - 12_...,._,. U.S.Navy-DLA@ Juffair

165*165

C)

165*165

- - - ----,I -- -- 11.:1

INVENTORY

SUPERVISOR &

LOGISTICS

oMGMT

!;;: SPECIALIST

MOFFICE

Furniture Layout c-__ J� 0 M •••• .. 111• 10140

D Q 0

D

LO I.O

Office.2

SUPPLIER OPERATIONS OFFICE

IZ-s.i,t-18

U.S.Navy-DLA@ Juffair

Furniture Layout

-----2620------------,(

Office.3

SUPPLIER

OPERATIONS CHIEF

OFFICE

12/09/18 Issuedfor

-, 40 0 M "':: •• �11,c -•11111 10141

M.D

·-----3000-- --- ,f'----2700----

Office

12-s..,1-1, U.S.Navy-DLA @ luffair

Furniture Layout l Poi•t-165

Reception

DEPUTY & SECRETARY OFFICE

12/09/18 Iaucdfar

'""I", 40 0 M �=•• _,..

-•b- 10138

Ill'

File details come from the government source that posted it. Updated .