SF30 SPE60422R0400 A0004.pdf

PDF 13 KB Posted

Attached to
Fermi Labs 2022 A0006 Federal contract opportunity
Solicitation number
SPE60422R0400
Issued by
Defense Logistics Agency Energy

About this file

This document provides details of a solicitation issued by the Defense Logistics Agency Energy for electricity supply services. The solicitation SPE60422R0400 seeks offers for the supply of an estimated 782,595,102 kWh of electricity and ancillary services to the Fermi National Accelerator Laboratory located in Illinois over a 36-month period from January 2023 through January 2026. The contract will utilize a fixed-price requirements type contract based on locational marginal pricing. Offers are due by the date provided in block 8 of the SF-1449. Responsible sources may submit proposals, and the award will be made to an offeror approved as a retail electric provider in Illinois. Carbon pollution-free electricity may be required to comply with recent executive orders.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE604 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60422R0400

X

2021 OCT 19

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

INSTALLATION ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

2022 JAN 18

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 3 PAGES

SPE60422R0400 - 0004

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

1. B19.46 BLOCK PURCHASES (ELECTRICITY) (DLA ENERGY) (OCT 2021), NOTE 2: is hereby added:

NOTE 2: Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, was issued on December 8, 2021. To facilitate compliance with the EO, any time prior to any block purchase, the Government may require the contractor to supply the Government’s electricity requirement for the block purchase as Carbon Pollution-Free Electricity (CFE).

In accordance with the EO, Section 603, Definitions; Carbon Pollution-Free Electricity means electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.

The Government may require the contractor identify the source of the electricity, the accompanying renewable energy certificates (RECs), certification (Green-e or equivalent) or, that the CFE provided be regionally sourced. The parties will stipulate the environmental credits that must be included.

Reminder, this is still a retail open access electricity requirement. Qualified offerors must be retail suppliers approved by the Illinois Commerce Commission.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES

SPE60422R0400 - 0004

SECTION J - LIST OF ATTACHMENTS

List of Attachments

Description File Name

ATTACH_SPE60422R040

0_Fermi_2022_A0004 SPE60422R0400 Fermi

2022 A0004.pdf

File details come from the government source that posted it. Updated .