Attachment V - PJM Billing Statement Line Items.xls

XLS spreadsheet 54 KB Posted

Attached to
Fermi Labs 2022 A0006 Federal contract opportunity
Solicitation number
SPE60422R0400
Issued by
Defense Logistics Agency Energy

About this file

This document contains details of a solicitation issued by the Defense Logistics Agency Energy for electricity supply to the Fermi National Accelerator Laboratory. The solicitation requests offers for a 36-month supply of an estimated 782,595,102 kWh of electricity and ancillary services to be delivered through the PJM regional grid to locations in Illinois, utilizing a fixed-price requirements contract priced at locational marginal rates. Responses are due by the closing date provided in block 8 of the SF1449 form. The contract award will be made to an approved retail electric provider in the applicable states. Ineligible offerors include those on sanctions lists maintained by OFAC, BIS, FAPIIS and EPLS. The procurement is subject to WTO GPA and free trade agreements.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PJM Bill Line Items

PJM Billing Statement Line Items
ID #Weekly BLICHARGESID #Weekly BLICREDITS
1000Amount Due for Interest on Past Due Charges
11001Network Integration Transmission Service21001Network Integration Transmission Service
11011Network Integration Transmission Service (ATSI Low Voltage)21011Network Integration Transmission Service (ATSI Low Voltage)
11031Underground Transmission Service21031Underground Transmission Service
11041Network Integration Transmission Service Offset21041Network Integration Transmission Service Offset
21061Non-Zone Network Integration Transmission Service
1108Transmission Enhancement2108Transmission Enhancement
1109MTEP Project Cost Recovery2109MTEP Project Cost Recovery
1110Direct Assignment Facilities2110Direct Assignment Facilities
1115Transmission Enhancement Settlement (EL05-121-009)
1120Other Supporting Facilities2120Other Supporting Facilities
1130Firm Point-to-Point Transmission Service2130Firm Point-to-Point Transmission Service
2132Internal Firm Point-to-Point Transmission Service
1133Firm Point-to-Point Transmission Service Resale2133Firm Point-to-Point Transmission Service Resale
1135Neptune Voluntary Released Transmission Service (Firm)2135Neptune Voluntary Released Transmission Service (Firm)
1138Linden Voluntary Released Transmission Service (Firm)2138Linden Voluntary Released Transmission Service (Firm)
1140Non-Firm Point-to-Point Transmission Service2140Non-Firm Point-to-Point Transmission Service
2142Internal Non-Firm Point-to-Point Transmission Service
1143Non-Firm Point-to-Point Transmission Service Resale2143Non-Firm Point-to-Point Transmission Service Resale
1145Neptune Voluntary Released Transmission Service (Non-Firm)2145Neptune Voluntary Released Transmission Service (Non-Firm)
1146Neptune Default Released Transmission Service (Non-Firm)2146Neptune Default Released Transmission Service (Non-Firm)
1147Neptune Unscheduled Usage Billing Allocation
1155Linden Voluntary Released Transmission Service (Non-Firm)2155Linden Voluntary Released Transmission Service (Non-Firm)
1156Linden Default Released Transmission Service (Non-Firm)2156Linden Default Released Transmission Service (Non-Firm)
1157Linden Unscheduled Usage Billing Allocation
12001Day-ahead Spot Market Energy
12051Balancing Spot Market Energy
12101Day-ahead Transmission Congestion22101Transmission Congestion
22111Day-ahead Transmission Congestion
12151Balancing Transmission Congestion22151Balancing Transmission Congestion
12161Pseudo-Tie Balancing Congestion Refund
2217Planning Period Excess Congestion
1218Planning Period Congestion Uplift2218Planning Period Congestion Uplift
12201Day-ahead Transmission Losses22201Transmission Losses
12251Balancing Transmission Losses
12301Inadvertent Interchange
1240Day-ahead Economic Load Response2240Day-ahead Economic Load Response
1241Real-time Economic Load Response2241Real-time Economic Load Response
1242Day-Ahead Load Response Charge Allocation
1243Real-Time Load Response Charge Allocation
1245Emergency Load Response2245Emergency Load Response
1250Meter Error Correction
12601Emergency Energy22601Emergency Energy
1301PJM Scheduling, System Control and Dispatch Service - Control Area Administration
1302PJM Scheduling, System Control and Dispatch Service - FTR Administration
1303PJM Scheduling, System Control and Dispatch Service - Market Support
1304PJM Scheduling, System Control and Dispatch Service - Regulation Market Administration
1305PJM Scheduling, System Control and Dispatch Service - Capacity Resource/Obligation Mgmt.
1306PJM Scheduling, System Control and Dispatch Service - Advanced Second Control Center
1307PJM Scheduling, System Control and Dispatch Service - Market Support Offset
1308PJM Scheduling, System Control and Dispatch Service Refund - Control Area Administration
1309PJM Scheduling, System Control and Dispatch Service Refund - FTR Administration
1310PJM Scheduling, System Control and Dispatch Service Refund - Market Support
1311PJM Scheduling, System Control and Dispatch Service Refund - Regulation Market Administration
1312PJM Scheduling, System Control and Dispatch Service Refund - Capacity Resource/Obligation Mgmt.
1313PJM Settlement, Inc.
1314Market Monitoring Unit (MMU) Funding
1315FERC Annual Charge Recovery
1316Organization of PJM States, Inc. (OPSI) Funding
1317North American Electric Reliability Corporation (NERC)
1318Reliability First Corporation (RFC)
1319Consumer Advocates of PJM States, Inc. (CAPS)
1320Transmission Owner Scheduling, System Control and Dispatch Service2320Transmission Owner Scheduling, System Control and Dispatch Service
1330Reactive Supply and Voltage Control from Generation and Other Sources Service2330Reactive Supply and Voltage Control from Generation and Other Sources Service
1340Regulation and Frequency Response Service2340Regulation and Frequency Response Service
1350Energy Imbalance Service2350Energy Imbalance Service
1360Synchronized Reserve2360Synchronized Reserve
1362Non-Synchronized Reserve2362Non-Synchronized Reserve
1365Day-ahead Scheduling Reserve2365Day-ahead Scheduling Reserve
1370Day-ahead Operating Reserve2370Day-ahead Operating Reserve
1371Day-ahead Operating Reserve for Load Response2371Day-ahead Operating Reserve for Load Response
1375Balancing Operating Reserve2375Balancing Operating Reserve
1376Balancing Operating Reserve for Load Response2376Balancing Operating Reserve for Load Response
1377Synchronous Condensing2377Synchronous Condensing
1378Reactive Services2378Reactive Services
1380Black Start Service2380Black Start Service
1390Fuel Cost Policy Penalty2390Fuel Cost Policy Penalty
1400Load Reconciliation for Spot Market Energy
1410Load Reconciliation for Transmission Congestion
2415Balancing Transmission Congestion Load Reconciliation
1420Load Reconciliation for Transmission Losses2420Load Reconciliation for Transmission Losses
1430Load Reconciliation for Inadvertent Interchange
1440Load Reconciliation for PJM Scheduling, System Control and Dispatch Service
1441Load Reconciliation for PJM Scheduling, System Control and Dispatch Service Refund
1442Load Reconciliation for Schedule 9-6 - Advanced Second Control Center
1444Load Reconciliation for Market Monitoring Unit (MMU) Funding
1445Load Reconciliation for FERC Annual Charge Recovery
1446Load Reconciliation for Organization of PJM States, Inc. (OPSI) Funding
1447Load Reconciliation for North American Electric Reliability Corporation (NERC)
1448Load Reconciliation for Reliability First Corporation (RFC)
1449Load Reconciliation for Consumer Advocates of PJM States, Inc. (CAPS) Funding
1450Load Reconciliation for Transmission Owner Scheduling, System Control and Dispatch Service
1460Load Reconciliation for Regulation and Frequency Response Service
1470Load Reconciliation for Synchronized Reserve
1472Load Reconciliation for Non-Synchronized Reserve
1475Load Reconciliation for Day-ahead Scheduling Reserve
1478Load Reconciliation for Balancing Operating Reserve
1480Load Reconciliation for Synchronous Condensing
1490Load Reconciliation for Reactive Services
15001Financial Transmission Rights Auction25001Financial Transmission Rights Auction
25101Auction Revenue Rights
16001RPM Auction26001RPM Auction
26051RPM Seasonal Capacity Performance Auction
16101Locational Reliability
16111CP Transitional Locational Reliability
26201Interruptible Load for Reliability
26251LSE PRD
26301Capacity Transfer Rights
26401Incremental Capacity Transfer Rights
16501Auction Specific MW Capacity Transaction26501Auction Specific MW Capacity Transaction
1660Load Management Compliance Penalty2660Load Management Compliance Penalty
16611Capacity Resource Deficiency26611Capacity Resource Deficiency
1662Generation Resource Rating Test Failure2662Generation Resource Rating Test Failure
16631Qualifying Transmission Upgrade Compliance Penalty26631Qualifying Transmission Upgrade Compliance Penalty
1664Peak Season Maintenance Compliance Penalty2664Peak Season Maintenance Compliance Penalty
1665Peak-Hour Period Availability2665Peak-Hour Period Availability
1666Load Management Test Failure2666Load Management Test Failure
1667Non-Performance2667Bonus Performance
16691PRD Commitment Compliance Penalty26691PRD Commitment Compliance Penalty
16701FRR LSE Reliability26701FRR LSE Reliability
1680FRR LSE Demand Resource and ILR Compliance Penalty2680FRR LSE Demand Resource and ILR Compliance Penalty
1681FRR LSE Capacity Resource Deficiency2681FRR LSE Capacity Resource Deficiency
1682FRR LSE Generation Resource Rating Test Failure2682FRR LSE Generation Resource Rating Test Failure
1683FRR LSE Qualifying Transmission Upgrade Compliance Penalty2683FRR LSE Qualifying Transmission Upgrade Compliance Penalty
1684FRR LSE Peak Season Maintenance Compliance Penalty2684FRR LSE Peak Season Maintenance Compliance Penalty
1685FRR LSE Peak-Hour Period Availability2685FRR LSE Peak-Hour Period Availability
1686FRR LSE Load Management Test Failure2686FRR LSE Load Management Test Failure
1687FRR LSE Schedule 9-52687FRR LSE Schedule 9-5
1688FRR LSE Schedule 9-62688FRR LSE Schedule 9-6
1710PJM/MISO Seams Elimination Cost Assignment2710PJM/MISO Seams Elimination Cost Assignment
1712Intra-PJM Seams Elimination Cost Assignment2712Intra-PJM Seams Elimination Cost Assignment
1720RTO Start-up Cost Recovery2720RTO Start-up Cost Recovery
1730Expansion Cost Recovery2730Expansion Cost Recovery
1900Unscheduled Transmission Service
1910Ramapo Phase Angle Regulators2910Ramapo Phase Angle Regulators
1911Michigan - Ontario Interface Phase Angle Regulators
29121CT Lost Opportunity Cost Allocation
1920Station Power
1930Generation Deactivation2930Generation Deactivation
1932Generation Deactivation Refund2932Generation Deactivation Refund
1950Virginia Retail Administrative Fee2950Virginia Retail Administrative Fee
1952Deferred Tax Adjustment2952Deferred Tax Adjustment
1955Deferral Recovery2955Deferral Recovery
1957Schedule 11A PJM Net2957Schedule 11A PJM Net
1980Miscellaneous Bilateral2980Miscellaneous Bilateral
1995PJM Annual Membership Fee
2996Annual PJM Cell Tower
2997Annual PJM Building Rent
1999PJM Customer Payment Default

File details come from the government source that posted it. Updated .