SPE603-18-R-0511_Lakhurst_NJ_Dec_21_2017.pdf
PDF 1 MB Posted
- Attached to
- GOCO Fuel Managment Services Federal contract opportunity
- Solicitation number
- SPE603-18-R-0511
- Issued by
- Defense Logistics Agency Energy
About this file
SPE603-18-R-0511 Request for Proposal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0009.pdf | ||
| Amendment_0008.pdf | ||
| ATTACHMENT_II_-_OSP_Lakehurst_Amd_0002.pdf | ||
| Revised_Attachment_I_-_Lakehurst_PWS.pdf | ||
| ATTACHMENT_III_-_WD.pdf | ||
| SPE603-18-R-0511_Lakehurst_QA_Final.pdf | ||
| Lakehurst_Map_with_Highlights.jpg | JPG image | |
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| SPE60318R0511_A0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| ATTACHMENT_II_-_OSP_Lakehurst_Amnd_0001.pdf | ||
| ATTACHMENT_III_-_WD.pdf | ||
| ATTACHMENT_V_-_Consent.pdf | ||
| ATTACHMENT_II_-_OSP_Lakehurst.pdf | ||
| ATTACHMENT_I_-_Lakehurst_PWS.pdf | ||
| ATTACHMENT_IV_-_PPQ.pdf | ||
| ATTACHMENT_II_-_OSP_Lakehurst.pdf | ||
| ATTACHMENT_IV_-_PPQ.pdf | ||
| ATTACHMENT_III_-_WD.pdf | ||
| ATTACHMENT_I_-_Lakehurst_PWS.pdf | ||
| SPE603-18-R-0511_Lakhurst,_NJ_DRAFT.pdf | ||
| AF_Consolidated_PWS_DRAFT.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
66059231 136
SPE603-18-R-0511
Joy Mack 703-767-0682
SPE603 100
See Schedule
12/21/2017
01/19/2018
3:00PM
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
USA
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SPE603-18-R-0511
NAS Lakehurst, NJ Fuel Management Services
A. A pre-proposal conference was held December 4, 2017 at Joint Base McGuire – Lakehurst (Lakehurst), NJ.
B. The NAICS Code is 493190 and the threshold for small business is $27.5 million in annual receipts. The point of contact for Small Business Affairs is Mr. Garrell Armstrong, telephone (703) 767-8530.
C. DLA ENERGY–FESAB is the designated office for receipt of offers. All offerors shall clearly mark envelopes/packages sent in response to this solicitation with the words, “Offer under Solicitation SPE603-18-R-0511.” Mailed offers should be mailed to the following address:
US Post Office/US Post Office Express Mail offer only: Hand Carried/Courier Delivery Service only:
ATTN: DLA Energy-FESAB, Joy Mack Room 2933 ATTN: DLA Energy-FESAB, Room 2933 Defense Logistics Agency Energy Ms. Joy Mack / Telephone: 703-767-0682 8725 John J. Kingman Road, Suite 2933 Defense Logistics Agency Energy Fort Belvoir, VA 22060-6222 8725 John J. Kingman Road, Suite 2933
Fort Belvoir, VA 22060-6222
For Verification of Receipt: Contact Joy Mack joy.mack@dla.mil or (703) 767-0682
D. Your offer must be received in DLA Energy-FESAB on January 19, 2018 by 3:00 p.m. local Ft Belvoir, VA time. Facsimile proposals are not authorized. Do not return the entire solicitation package. Simply complete and return one original, one copy, one PDF electronic copy and one MS Excel electronic copy of the Attachment II Offeror Submission Package data and one original, one copy and one PDF electronic copy of the Technical Proposal submissions as described in 52.212-1 Instructions to Offers—Commercial Items with Addendum (JAN 2017) Your prices must be inserted in Clause B-0001 B30 in the Offeror Submission Package.
E. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to: bidcustodian@dla.mil. All e-mail proposals MUST be followed-up with the hard copy (consisting of two volumes as outlined below) NO LATER THAN FIVE (5) business days after solicitation closing. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals. Offeror’s proposals shall be prepared in two separate volumes and provided in the quantities shown below:
Volume Title No. of Copies Page Limit I Technical Proposal 1 original, 1 copy & 1 PDF electronic copy 60 II Business Management Proposal 1 original & 1 PDF electronic copy of Attachment II –
OFFEROR SUBMISSION PACKAGE and additional instructions listed in ADDENDUM TO FAR 52.212-1
None
F. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.
G. The resulting type of contract will be Firm Fixed Price. IAW FAR 52.212-1, the Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
H. Any contract awarded to a contractor who, at the time of award, was suspended, debarred, or ineligible for receipt of a Government contract is voidable at the option of the Government.
I. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.
mailto:joy.mack@dla.mil mailto:bidcustodian@dla.mil
TABLE OF CONTENTS
SECTION B – SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED (AARD) (DLA ENERGY FEB 2009)
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
THE PERFORMANCE WORK STATEMENT IS HEREBY INCORPORATED BY REFERENCE AS IF FULLY SET FORTH HEREIN.
SEE ATTACHMENT I
SECTION E - INSPECTION AND ACCEPTANCE ................................................................... ERROR! BOOKMARK NOT DEFINED.
E-0001 E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)
SECTION F - DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG 1989)
F-0001 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014)
F-0002 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997)
SECTION G - CONTRACT ADMINISTRATION DATA
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC 1999)
G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)
G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-0002 H11 GUARD SERVICE (DLA ENERGY MAR 1982)
H-0003 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY JAN 2012) H-0004 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS (DLA ENERGY JAN
2012)
SECTION I - CONTRACT CLAUSES
52.203-3 GRATUITIES (APR 1984)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010) 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (APR 2014)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) ... 20
52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (JAN 2017)
REGULATIONS APPLICABLE TO ITS PERFORMANCE UNDER THIS CONTRACT
ADDENDUM 1 TO 52.212-4 (52.243-1 CHANGES-FIXED- PRICE (AUG 1987) /SHOULD REFLECT DELETION OF (C) AND
REPLACEMENT
52.243-1 CHANGES – FIXED-PRICE W/ALTERNATE II (AUG 1987/APR 1984)
ADDENDUM 2 TO 52.212-4 (52.243-1 CHANGES-FIXED- PRICE (AUG 1987)
ALTERNATE I (APR 1984)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS --
COMMERCIAL ITEMS (JAN 2017)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
52.219-27 NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUISNESS SET-ASIDE (NOV 2011)
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY 2011)
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION
CONTRACTS (SEP 2013)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011), ALT I (MAY 2011)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)
52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232-9 LIMITATION OF WITHHOLDING OF PAYMENTS (APR 1984)
52.232-11 EXTRAS (APR 1984)
52.232-17 INTEREST (MAY 2014)
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (JUL 2013) 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
52.233-1 DISPUTES (MAY 2014), ALT I (DEC 1991)
ALTERNATE I (DEC 1991)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
52.237-3 CONTINUITY OF SERVICES (JAN 1991)
52.242-13 BANKRUPTCY (JUL 1995)
52.245-1 GOVERNMENT PROPERTY (JAN 2017)
52.245-9 USE AND CHARGES (APR 2012)
52.246-25 LIMITATION OF LIABILITY—SERVICES (FEB 1997)
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011)
252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016)
252.204-7011 ALTERNATIVE LINE ITEM STRUCTURE (SEP 2011)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) ... 59
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991) 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A
COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT 2015)
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)
52.233-9000 AGENCY PROTESTS (NOV 2011)
52.233-9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV 2011) 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY (APR 2012)
252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (APR 2012)
252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)
252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILILIARY OPERATIONS (OCT 2010)
52.249-9000 ADMINSTRATIVE COSTS OF REPROCUREMENT AFTER DEFAULT ADMINISTRATIVE COSTS OF
REPORCUREMENT AFTER DEFAULT (MAY 1988)
I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009)
I-0001 I1.01-9 DEFINITIONS (CONT’D) (AARD/TESTING) (DLA ENERGY JUN 2009)
I-0002 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA ENERGY FEB
1996) I-0003 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT -- PAYROLL TAX ADJUSTMENT
(DLA ENERGY JAN 2012)
I-0004 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)
I-0005 I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY JAN 2012)
I-0006 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY JAN 2012)
I-0007 I121 CUSTODY OF PETROLEUM PRODUCT (DLA ENERGY APR 1968)
I-0008 I122 USE OF FACILITIES (DLA ENERGY APR 2009)
I-0009 I123 TITLE TO FACILITIES (DLA ENERGY JUL 1991)
I-0010 I130 RISK OF LOSS OR DAMAGE TO GOVERNMENT-OWNED AND/OR CHARTERED AIRCRAFT (DLA
ENERGY APR 1968)
I-0011 I147 DEMURRAGE (DLA ENERGY NOV 1989)
I-0012 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)
I-0013 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009)
SECTION J – LIST OF ATTACHMENTS
ATTACHMENT I PERFORMANCE WORK STATEMENT (PWS)
ATTACHMENT II OFFEROR SUBMISSION PACKAGE
ATTACHMENT III DEPARTMENT OF LABOR WAGE DETERMINATION
ATTACHMENT IV PAST PERFORMANCE QUESTIONAIRE
ATTACHMENT V CONSENT FORM
ATTACHMENT VI QAPS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND STATEMENTS
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (SEPT 2007)
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS (JAN 2017) 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) ALTERNATE I (SEPT 2015)
ALTERNATE I (SEP 2015)
52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS
RELATING TO IRAN—REPRESENTATION AND CERTIFICATIONS (OCT 2015)
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011) 252.209-7998 REPRESENTATION REGARDING CONVICTION OF A FELONY CRIMINAL VIOLATION UNDER ANY
FEDERAL OR STATE LAW (DEVIATION 2012-O0007) (MAR 2012)
252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-O0004) (JAN 2012)
K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
K-0003 K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION (DLA ENERGY MAY 2014)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (JAN 2017)
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
52.216-1 TYPE OF CONTRACT (APR 1984)
52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999)
52.233-2 SERVICE OF PROTEST (SEP 2006)
52.237-1 SITE VISIT (APR 1984)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
252.209-7002 DISCLOSURE OF OWNERSHIP OR CONTROL BY A FOREIGN GOVERNMENT (JUN 2010)
52.233-9000 AGENCY PROTESTS (NOV 2011)
52.233-9001 DISPUTES - AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV 2011)
L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)
L-0002 L2.01-1 PROPOSAL PREPARATION INSTRUCTIONS AND PAST PERFORMANCE AND SOCIOECONOMIC PLAN
SUBMISSIONS (DLA ENERGY FEB 2015)
L-0003 L2.06 EVIDENCE OF RESPONSIBILITY (AARD) (DLA ENERGY NOV 1989)
L-0004 L2.31 PROPOSAL FORMAT AND CONTENT (DLA ENERGY JAN 2012)
L-0005 L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)
L-0006 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)
L-0007 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY FEB 2009)
SECTION M - EVALUATION FACTORS FOR AWARD
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
M-0001 M43.01 EVALUATION OF OPTIONS (DLA ENERGY MAR 2009)
M-0002 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)
SECTION B – SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED (AARD) (DLA ENERGY FEB 2009)
The services to be furnished during the period specified herein and the unit prices are as follows: The contract shall be for a period of four
(4) years with one five (5) year renewal options.
BASE PERIOD –August 1, 2018 through July 31, 2022 OPTION PERIOD 1 – August 1, 2022 through July 31, 2027
DESCRIPTION OF SERVICES
Base Period: August 1, 2018 through July 31, 2022 Years 1-4:
CLIN 0001 Alongside Aircraft Refueling (V20000042) The offered price per month is $ _______________________
(Pro-rated for partial months)
NOTE: All G&A and profit for these line items must be included in CLIN 0001.
Option Period: August 1, 2022 through February 28, 2027 Years 5-9:
CLIN 0002 Alongside Aircraft Refueling (V20000042) The offered price per month is $ _______________________
(Pro-rated for partial months)
NOTE: All G&A and profit for these line items must be included in CLIN 0002.
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
THE PERFORMANCE WORK STATEMENT IS HEREBY INCORPORATED BY REFERENCE AS IF FULLY SET FORTH
HEREIN. SEE ATTACHMENT I.
52.246-4 -- Inspection of Services -- Fixed-Price
(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may --
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may --
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
SECTION E - INSPECTION AND ACCEPTANCE
E-0010 E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)
The facilities to be provided hereunder shall be ready for inspection and acceptance by __________________________.
The Contractor shall notify the Contracting Officer of the date such tanks and facilities are available for inspection and acceptance, and the Contracting Officer, or his designated representative, shall promptly thereafter inspect such tanks and facilities. No payment will be made for services performed or facilities provided prior to ________________________.
SECTION F - DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the
Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the
Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage;
provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
F1.05 GENERAL SHIPPING CONDITIONS (DESC OCT 1997)
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE
AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE)
in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF
CONTRACTOR'S DESIGNATED REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment.
Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.
(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.
(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.
(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.
(g) FOR TANK CARS ONLY.
(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.
(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.
(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.
(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments.
Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.
(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.
(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.
(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.
(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.
(m) Custody of product delivered to tanker or barge, and risk f loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.
(n) The Contractor shall be held accountable for demurrage charges arising from delay(s)in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(o) The following subparagraphs only apply to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.
(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival.
Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours notice for barges and 72 hours notice for tankers will require verbal approval of the Contractor, confirmed in writing..
(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --
(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.
(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.
(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.
(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor.
(2) INCREASES TO BASIC ALLOWED LAYTIME.
(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be loaded do not permit loading, basic allowed laytime shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.
(iii) After laytime commences, when vessels are required to dock at anchorage due to vessel delays such as vessel inspection and inerting, laytime credit will be allowed for transit time from anchors away at anchorage until first line ashore berthing, not to exceed 2 hours.
(iv) If regulations of the owner or operator of the vessel prohibit loading at any time after laytime has commenced, time so lost shall be added to basic allowed laytime.
(v) If, for any reason, the Contractor is delayed in loading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.
(vi) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.
(vii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for loading provided for by paragraph (1) above, or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
(DESC 52.247-9FP1)
F-0001 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014)
THIS PROVISION ONLY APPLIES TO DLA FUNDED LINE ITEMS.
(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.
(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.
(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.
(d) PREPARATION AND TRANSMISSION OF ORDERS AND CALLS
(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.
(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number; contract number; item number; ceiling price; quantity; delivery location; and the required delivery and/ or service date.
(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.
(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.
(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor.
The order number on the written order will take precedence over the interim order number, if different.
(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.
(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.
https://www.dibbs.bsm.dla.mil/ http://www.sam.gov/
(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.
(4) The Contractor’s non-receipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.
F-0002 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997)
The total gallonage received into or shipped from the Contractor's facilities shall be determined as follows:
(a) RECEIPTS OR SHIPMENTS OF CRUDE AND FUELS OTHER THAN RESIDUAL FUELS (by transport truck of 3500 gallons or less) (truck and trailer combination when delivering same product will be considered as one container or conveyance).
Measured on an actual gallonage basis without temperature correction.
(b) RECEIPTS OR SHIPMENTS OF RESIDUAL FUELS (in excess of 3500 gallons of crude or other fuels by tank car or transport truck). On a gallonage basis corrected to 60oF.
(c) RECEIPTS OR SHIPMENTS BY TANKER OR BARGE OR PIPELINE. On a gallonage basis corrected to 60oF.
Quantities shipped or received will be determined on the basis of shore tanks or tender gauges taken by the Contractor and authenticated by the Quality Representative (QR). The ship or carrier's representative may participate in these determinations. During the gauging of shore tanks, the tanker, barge, or carrier's representative may participate in the quantity determinations and, in the case of tanker/barge shipments or receipts, the Contractor may participate in the operations on board the tanker or barge which are required to determine the quantity of product in the tanker or barge cargo tanks.
(d) In the case of receipts, the Contractor shall sign the bill of lading and other related documents for the actual quantity received as determined above. When requested by the QR, the Contractor shall investigate losses or gains in connection with receipts or shipments to determine if the cause is at the Contractor’s facility.
(e) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. In addition, the following specific standards will be the referee method.
(1) API MPMS Chapter 11.1, Volume Correction Factors (API 2540/ASTM D 1250/IP 200/ISO 91-1). Either the printed version or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine will be the referee method.
(i) For crude oils, JP4 and Jet B, use Volume I, Tables 5A and 6A (or Volume VII Tables 53A and 54A).
(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D (or Volume XIV, Tables 53D and 54D).
(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B (or Volume VIII, Tables 53B and 54B).
(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.
(v) Volume XII, Table 52, shall be used to convert cubic meter at 15 degrees Centigrade to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Centigrade to cubic meters at 15 degrees Centigrade by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
(vi) If the original measurement is by weight and quantity is required in U.S. gallons, then--
(A) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit. Convert kilograms to metric tons by dividing by 1,000.
(B) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
(2) API MPMS Chapter 4, Providing Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulations (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent.
(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter.
(f) In addition to gauging of storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories of the purpose of detecting loss of products.
F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DESC DEC 1991)
During the contract period, _______________ through _______________, the Contractor shall provide petroleum storage facilities and services at the following location:
(Street address)
(City/State/Zip)
(DESC 52.242-9FA1)
SECTION G - CONTRACT ADMINISTRATION DATA
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) Definition. “Contracting Officer's representative” means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012)
(a) Definitions. As used in this clause—
(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal
Acquisition Regulation.
(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area Work Flow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(4) “Receiving report” means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using
WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Government-wide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization. “Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF). “Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall— http://www.acq.osd.mil/dpap/dars/dfars/html/current/201_6.htm#201.602-2 http://www.acq.osd.mil/dpap/dars/dfars/html/current/252246.htm https://wawf.eb.mil/
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use
Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Protocol or Payweb
(1) To access PayWeb, the vendor may go to the following site: https://onronline.onr.navy.mil/payweb/
(2) For instructions on PayWeb payment request submission, please contact the office identified below: _______NOT
APPLICABLE___
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s). Invoice 2-in-1 (Services Only)
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer. NOT APPLICABLE
(3) Document routing. The Contractor shall use the information in the Routing Data Table below…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.