Amendment 0001 is issued to: 1) provide responses to industry questions, 2) to incorporate a revised attachment 5-addendum to 5212-1, and 3) to incorporate a revised attachment 6, tailored FAR 52.212-2 Evaluation -- Commercial Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPE601-19-R-0310_0007.pdf | ||
| SPE601-19-R-0310_0006.pdf | ||
| SPE60119R03100005.pdf | ||
| SPE60119R03100004.pdf | ||
| SPE60119R03100003.pdf | ||
| SPE60119R03100002.pdf | ||
| SPE601-19-R-0310_RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
4. REQUISITION/PURCHASE REQ. NO.
See Block 14
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE601 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60119R0310
X
2019 JAN 25
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY AEROSPACE ENRGY-DLAE-M
BLDG 1621
1014 BILLY MITCHELL BLVD
SAN ANTONIO TX 78226
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
X
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 12 PAGES
SPE60119R0310 - 0001
CONTINUED ON NEXT PAGE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 12 PAGES
CONTINUED ON NEXT PAGE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 12 PAGES
CONTINUED ON NEXT PAGE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 12 PAGES
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 12 PAGES
Attachments
List of Attachments
File Name Description
ATTACH_Attach_3_Tailore d_FAR_52_212_2_Evaluati on_of_Commercial_Items
ATTACH 6 52
ATTACH_Attach_2_addend um_to_52_212_1
ATTACH ADDE
ATTACH_Attach_1_answer _to_industry_questions
Industry qu
SPE601-19-R-0310
Answers to Industry Questions:
1) Since a filter will be in line per the military specification is individual trailer particulate testing required? Also, to confirm – Argon testing is waived?
Answer: Yes, each trailer must be tested IAW with the specification requirements for particulate. Per the SOO the Argon testing is NOT required.
2) Can you provide a more detailed demand schedule? Such as typical daily demand other than over 3 trailers per day? Also, can you provide a test schedule or anticipated demand usage?
Answer: Demand schedules vary based on testing requirements. 3 trucks per 24 hour period is an estimated minimum. Per the SOO, after contract award, LM designated POC will actively communicate with supplier to identify anticipated periods of increased usage well in advance.
3) Is there typically detention at the site?
Answer: Detention is very rare at site. Only happens under forced closure exercises which are very rare.
4) Given the risk aversion expressed by Lockheed Martin personnel in placing the entire site volume requirements with one supplier, would the DLA consider revising the solicitation to divide the entire requirements into smaller volume awards?
Answer: The requirement remains unchanged, and one (1) contract award will be made IAW with the terms and conditions of the solicitation.
5) If DLA determines that the answer to question one is no, alternatively, would DLA consider a shorter term period of performance award, 4/1/19-9/30/19, or until year end FY2019, in order to give DLA Energy and Lockheed Martin additional time to determine how best to reduce logistical and supply risk and then re-solicit based on a revised statement of objectives which could provide for a primary supplier as well as a contingency supplier as discussed in the site visit meeting?
Answer: The requirement remains as solicited, and will be a five (5) year contract award.
ADDENDUM TO 52.212-1 -- INSTRUCTIONS TO OFFERORS -- COMMERCIAL ITEMS
(DEVIATION 2018-O0018)
The proposed instructions in this section are designed to assist offerors in preparing a complete response that reflects a full understanding of the approach proposed to accomplish all work required herein. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors.
The Offeror must be registered and current in the System for Award Management website (https://www.sam.gov/portal/public/SAM/); no exceptions.
Failure to meet a requirement or adhere to an instruction may result in an offer being ineligible for award.
Submission of Offers:
a) Interested parties capable of providing the specified product and services must submit a written offer via email directly to the Contract Specialist, Roman Bernal (Roman.Bernal@dla.mil), and the Contracting Officer, Stephanie Faulkner (Stephanie.Faulkner@dla.mil), not later than the solicitation due date and following the instructions within this solicitation. The offeror is responsible for confirming the successful and timely receipt of its offer.
b) The Standard Form 1449 must be completed, as well as the MANUFACTURING AND FILLING POINTS and TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (AEROSPACE ENERGY) contract text and all certifications and representations contained in the Aerospace Contract Text, Section K in attachment 3, of the solicitation.
c) Document Content File Format – The minimum font size for the proposal pages is 12 point.
Proposals shall be submitted on 8 ½ x 11 paper, except for fold-outs used for charts, tables or diagrams, which may not exceed 11 x17. Required documents must be submitted via electronic email with a request receipt, and should be clearly marked as to solicitation identification and the Offeror’s name, address, CAGE Code, and DUNS number.
d) Do not send as an executable or .exe file. Email size shall not exceed five (5) megabytes.
Documents may be compressed (zipped) using WinZip 8.1 or later version. Any corrupted file or media containing a virus could result in the offer not being considered for award.
e) To ensure software compatibility use a word processing and spreadsheet program compatible with Microsoft ® Word 2007 ® and Microsoft ® Excel 2007 ®. PDF is Adobe ® Portable Document Format.
f) Offerors shall assume that the Government has no prior knowledge of their experience and will base its evaluation on the information presented in the offeror’s proposal. Only the minimum amount of information required to provide for proper evaluation is requested. The proposals shall be clear, concise, and include sufficient detail to provide for adequate evaluation and substantiation of the validity of stated claims. Submitted documents must contain adequate information to enable the evaluation team to fully ascertain the Offeror’s capability to perform https://www.sam.gov/portal/public/SAM/ mailto:Roman.Bernal@dla.mil contract requirements, must meet the requirements of the RFP, and must address the evaluation factors for award. The offeror’s proposal must convey to the Government that the offeror is capable; possesses sufficient technical expertise and experience; possesses sufficient resources;
and is able to plan, organize, and use those resources in a coordinated and timely fashion such that technical requirements will be achieved. The proposal shall not simply rephrase or restate the Government’s requirements. The Government will not make other than reasonable efforts to ascertain the meaning of a proposal submission, given that Offeror must follow these instructions for how to arrange and submit a proposal. Inadequate, incomplete or disorganized proposals may be found to be technically unacceptable, and evaluation of that proposal stopped, simply because the evaluators could not reasonably ascertain whether the proposal meets the technical evaluation factors of this solicitation.
g) All information contained in the proposal that an Offeror feels is proprietary should be labeled
“Source Selection Information—See FAR 2.101 and 3.104.”
h) Exceptions (price or technical) taken to the terms and conditions of the solicitation and/or any of its formal attachments shall be identified. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain the impact, if any, on the performance, price, and specific requirements of the solicitation. Failure to agree to the terms and conditions of the solicitation may result in the offeror being removed from consideration for award.
i) As the Government intends to award without discussions, Offerors are advised of the possibility that their proposals may be found unacceptable if exceptions are taken to the solicitation requirements. Clarification of Government requirements should be requested by the Offeror by submitting questions and/or recommended changes not later than 10 calendar days after issuance of the solicitation. All exceptions to the solicitation requirements (including the SOO) and supporting rationale shall be identified as such and consolidated into an overview section of subject volume. An overview section is only required if the Offeror takes exception to any requirement in the solicitation. The overview section will not be included in the page count.
Exception(s) to solicitation requirements may require the Government to amend the solicitation to reflect requirement change(s). If the Offeror takes no exception to the stated requirements, a statement to this effect shall be included in the respective volume.
j) Parties interested in attending the site visit scheduled for 10:00 AM CST on 7 Feb 2019 must submit requests by email addressed to the Contract Specialist and Contracting Officer by 10:00 AM CST on 31 Jan 2019.
k) Any questions relating to this solicitation and its attachments shall be submitted in writing by email addressed to the Contract Specialist and Contracting Officer by 10:00 AM CST on 11 Feb 2019. Any questions received after this date may or may not be answered due to the constraints of the solicitation.
l) Offeror’s proposals are due by 10:00 AM CST on 25 Feb 2019. The response shall consist of a cover letter and three (3) separate volumes: Volume I - Technical Capability, Volume II - Past Performance, and Volume III – Pricing.
Cover Letter shall include the following:
- Small Business Status/Categories as appropriate
- Company point of contact with email and phone number
- Cage Code & DUNS number
- A statement that your company understands the requirements specified in the Statement of Objectives (SOO) and will meet the performance standards and requirements therein.
- A statement that your company does or does not take exception, in accordance with para h above, to any of the requirements of the SOO or terms/conditions of the resulting contract.
m) Offeror shall acknowledge awareness of all amendments to the solicitation by signing and dating
Page 1 of each Standard Form 30, Amendment of Solicitation/Modification of Contract, and including it in Volume III, Pricing, of the proposal.
Volume I -Technical Capability
Each offeror must submit one (1) original and one (1) redacted copy. The redacted copy must have the following removed; company names, logos, the word “incumbent” or similar words meaning the same, and proper names of persons. Technical Capability will receive an adjectival rating of Technically Acceptable/Unacceptable as defined in the attached addendum to 52.212-2-- Evaluation -- Commercial Items (Oct 2014).
The complete technical proposal, exclusive of any résumés, drawings, or blueprints, shall not exceed 12 pages, 1 side and single spaced. The proposal will be evaluated strictly on technical merit and should describe and justify the offeror's technical approach to the requirements of the work to be performed and/or delivery of product under the contract. The technical proposal should be specific and provide concise, straight-forward descriptions of the offeror's capability to perform the requirements of the contract. Proposals that are unrealistic in terms of the description of the offeror’s technical capability may be considered indicative of a lack of understanding of the solicitation’s requirements.
The offeror shall provide a technical proposal addressing the requirements below. The proposal shall include a general description of how the offeror will ensure a reliable supply of on-specification product and/or associated service to meet the Government’s requirements. The description must include and address at a minimum:
(A) Daily Production capability of proposed fill plant(s).
(B) If the Offeror will be making deliveries to customers, type, number and size of containers (i.e. trailers) that will be used for delivery of product to each customer location that the Offeror proposes on. The Offeror shall demonstrate it can meet the logistics required to fulfill the product deliveries.
(C) The in-process quality control procedures that will ensure the production and delivery of on-specification product.
(D) Offeror’s proposed quality sampling plan that will be implemented to assure individual shipments made under this solicitation meet the product quality requirements stated in the applicable specification or product describe.
(1) Description of Contractor-furnished equipment, such as telemetry, at a location other than the Contractor’s facility (e.g., on Government property) Describe all Contractor provided equipment to include a description of size, certifications, instrumentation (including alarms), design parameters, etc.
(2) Include a timeline for the purchase, installation, testing and commissioning of the equipment.
(E) If the offeror is not the manufacturer of the product to be delivered under the contract or is proposing to provide product from a fill point or production facility other than one owned and operated by the offeror, the offeror shall provide a written supply commitment letter from the owner of the fill plant or production facility from where the product will be obtained in performance of any resultant contract. This information may be used in the Contracting Officer’s responsibility determination as required by FAR Part 9.
The written supply commitment letter must clearly indicate—
(A) The owner of the fill plant or production facility is willing to provide the products and/or services required to be delivered/performed under any resultant contract for the duration of the delivery period shown in the Schedule; and
(B) Confirmation of the quantity and specification of the products to be delivered;
(F) Contractor shall specify how they will meet MIL-PRF-27401G -7 Aug 2013 and in particular describe in detail how the contractor will meet paragraph 4.4.3 Particulate content.
Volume II – Past Performance
Past Performance information is required in response to all solicitations. Past performance information will be used to evaluate past performance as the second non-cost factor in addition to Technical Capability. Even though the assessment of Past Performance is separate and distinct from the Determination of Responsibility required by FAR Part 9, Contractor Qualifications, past performance information obtained during the evaluation process may be used to support the Determination of Responsibility for the successful Offeror.
The offeror shall submit information regarding its past performance on the form entitled Contractor Performance Data Report, as attached to the solicitation. All contracts and subcontracts (completed or in progress) for the last five years awarded by DLA Energy as well as other (completed or in progress) Government agencies or the private sector that are related to the proposed contract shall be included on the form. Failure to submit a complete list may reflect adversely on the offeror. The number of relevant past performance efforts submitted in accordance with the attachment shall not exceed five years. . The Government reserves the right to make telephone contact with offerors, proposed subcontractors and references in order to confirm and/or clarify the past performance information submitted. The Government has the option to consider information from these sources, and any others that may be available, that it deems necessary in order to make an accurate assessment of the offeror’s past performance. In addition, the offeror shall provide additional information on any significant problems encountered and corrective actions taken under contract(s).
The Offeror shall submit a Past Performance Volume containing the following:
(A) Client Authorization Letters for each identified effort for a private sector customers authorizing release to the Government of requested information on the Offeror’s performance.
(B) Contractor Performance Data Sheet – see Attachment 7. The Offeror shall provide documentation outlining the Offeror’s past performance with contracts, as prime, subcontractor, teaming partner, and /or joint venture partner, which is the same or similar in nature, size, and complexity to the services being procured under this solicitation. The submittal shall include rationale supporting the Offeror’s assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
(C) Past Performance Questionnaire – see Attachment 8. For the contracts identified on each Relevant Contracts Reference Sheet, the Offeror shall forward a copy of the past performance questionnaire to the points of contact responsible for monitoring performance under such contracts. The points of contact shall return the questionnaires via email directly to the Contract Specialist (Roman Bernal, Roman, Bernal@dla.mil) and Contracting Officer (Stephanie Faulkner, Stephanie.Faulkner@dla.mil) not later than the solicitation due date. Any questionnaires not returned by the solicitation due date directly to the Government points of contact for this solicitation will not be reviewed and evaluated. The information contained in the questionnaires will be used to evaluate the Offeror’s past performance.
VOLUME III- Price
In the Schedule, Section B, Supplies or Services and Prices/Costs, offered prices shall be completed for each Contract Line Item Number (CLIN).;
Unit prices shall be formulated, as specified below:
(A) Product with no Monthly Facility Fee (MFF). The offeror shall include all fixed, variable and incremental costs to produce and prepare product for Government inspection and acceptance. Include all transportation and shipping costs to deliver the product to the specified customer location if the product CLIN is designated as f.o.b. destination. For this solicitation, the applicable CLINs are ALL PRODUCT
CLINS 0001, 0002, 0003, 0004, AND 0005
(B) Contractor provided equipment CLIN(s). Where the Statement of Objectives(SOO) requires specific contractor-provided equipment for which a separate CLIN has been established for reimbursement under the resultant contract, the Offeror shall include all all costs associated with providing such equipment, to include but not limited to delivery, installation, calibration, maintenance and repair throughout the contract term, and removal at the expiration of the contract. For this solicitation, the applicable CLINS INTALLATION AND REMOVAL OF
EQUIPMENT 0010 AND 0011 AND EQUIPMENT, TANK
OVERPROCTECTIN PRESSTURE PROTECTION CLIN 0008 USAUGE
CLIN 0012
(C) Expedited/Emergency Delivery CLIN(s). Where the Schedule has a CLIN for Expedited and/or Emergency delivery, as defined in the SOO, the offeror shall include all costs associated with such delivery on a per shipment basis. This encompasses any and all additional labor and transportation costs anticipated to be incurred over and above normal delivery costs. Any product ordered with an Expedited and/or Emergency delivery shall be paid at the unit price of the applicable product CLIN. For this solicitation, the applicable CLIN(s) EMERGENCY DELIVERY CLIN 0009 mailto:Roman, mailto:Bernal@dla.mil
(D) Hot Fill CLIN(s). The offeror shall propose a per Hot Fill Unit Price. Examples of costs that should be included in the offeror’s per Hot Fill Unit Price but not limited to these, are additional support personnel required to accomplish the Hot Fill or additional time required at the delivery location in support of the Hot Fill. The per Hot Fill Unit Price shall not include the cost of the product consumed during the Hot Fill since the Contractor will be paid for the amount of product consumed under the applicable product CLIN. For this solicitation, the applicable CLINs HOT FILL CLIN 0007
(E) Additional CLIN(s) not described above to be priced by the Offeror. For this solicitation, the applicable CLINs are: DETENTION COST CLIN 0006
Pricing will be evaluated for reasonableness, balance and completeness. Other than Certified Cost and Pricing Data may be requested. Pricing shall be included in the proposal and submitted on the CLIN Schedule.
Period of Acceptance of Proposals: The Offeror agrees to hold the prices in its offer firm for 90 days from the date specified in receipt of proposals.
ANY PROPOSALS RECEIVED AFTER DESIGNATED CLOSING DATE AND
TIME MAY NOT BE CONSIDERED FOR AWARD.
(End of Addendum)
Tailored FAR 52.212-2 Evaluation -- Commercial Items (Oct 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The following factors shall be used to evaluate offers:
(i) Factor I, Technical Capability
(ii) Factor II, Past Performance
(iii) Factor III, Price
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)
Addendum to FAR 52.212-2 Evaluation -- Commercial Items (Oct 2014)
BASIS FOR CONTRACT AWARD
This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures.
Evaluation will be in accordance with Federal Acquisition Regulation (FAR) 15.101-2, as supplemented by the Defense FAR Supplement (DFARS), and the Defense Logistics Agency Directive (DLAD). Technical or past performance tradeoffs will not be made and no additional credit will be given for exceeding minimum acceptability. Contract award will be made to the Offeror deemed responsible in accordance with FAR 9.104-1 and whose proposals conform to the solicitation requirements. While the Government will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process.
a) Offeror proposals are evaluated in accordance with the evaluation criteria. The Government intends to award one firm fixed priced requirements type contract. All Offerors must be technically acceptable and have an acceptable past performance rating to be eligible for award consideration.
b) Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the specific evaluation criteria contained in the solicitation. Non-price factors to be evaluated shall be technical capability and past performance. In accordance with FAR 15.101-2(b)(3), proposals will be evaluated for acceptability but not ranked using the non-price factors.
c) Award will be made to the responsible, technically acceptable Offeror with the lowest total evaluated price for all clins in the solicitation, , including options, if contained in the solicitation. Only one contract will be awarded for all the CLINs specified in the Schedule. Where the Government is soliciting for a group of CLINs, such as on a regional basis, as well as for individual customer locations on a f.o.b. destination basis, more than one contract award may be made as price evaluation and award will be made on a customer location by customer location basis.
d) An Offeror whose proposal is evaluated as acceptable from both a technical capability perspective as well as for past performance will be considered technically acceptable.
Bernal, Roman R CIV DLA ENERGY (US) To comply with legal comments above, changed the language to try to make more clear one award.
Boehm, Suzanne Brangan CIV DLA ENERGY (USA) To me, this is unclear whether we are awarding all CLINs to one contractor as a group, by individual locations, etc. May consider clarifying.
e) The Government intends to award without discussions. If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, Offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision.
If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the Final Proposal Revision are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award. The Government reserves the right to conduct discussions.
EVALUATION FACTORS
FACTOR I: TECHNICAL CAPABILITY
Technical capability will be measured against requirements specified in the solicitation. As such, technical capability is considered acceptable when the offeror’s proposal is in compliance with the requirements of the solicitation. Criteria used to judge acceptability are as follows:
(A) Daily Production capability of proposed fill plant(s).
(B) offeror’s ability to meet the logistics required to fulfill the product deliveries.
(C) offeror’s in-process quality control procedures that will ensure the production and delivery of on-specification product.
(D) Offeror’s proposed quality sampling plan that will be implemented to assure individual shipments made under this solicitation meet the product quality requirements stated in the applicable specification or product described.
(E) proposed supply commitment if the offeror is not the manufacturer of the product to be delivered under the contract or is proposing to provide product from a fill point or production facility other than one owned and operated by the offeror.
(G) Offeror’s ability and plan to meet specifications of MIL-PRF-27401G -7 Aug 2013 and in particular how the contractor will meet paragraph 4.4.3 Particulate content.
Technical Factor Rating Table 1
Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
FACTOR II: PAST PERFORMANCE
The Government evaluation team will conduct an in-depth review and evaluation of all performance data obtained to determine the Offeror’s probability of meeting the minimum past performance solicitation requirements. The team will confirm past performance data identified by the Offerors in their proposals and obtain additional past performance data, as necessary, if available, from other sources.
Past Performance shall generally include verification of performance with the Offeror’s past and current customers, to include Federal, State, and local Governments as well as private entities. The form entitled Contractor Performance Data Sheet may be used to provide relevant and recent performance history pursuant to this solicitation. The Past Performance evaluation is an assessment of the Offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment will be based on the Offeror’s record of relevant and recent past performance information that pertains to the products and/or services outlined in the solicitation requirement. Past Performance shall be evaluated in accordance with FAR 15.305 and DFARS 215.305; however, the comparative assessment in FAR 15.305(a)(2)(i) does not apply. Therefore, past performance will be rated on an “acceptable” or “unacceptable” basis using the ratings in Past Performance Table below. However, offerors without a record of relevant past performance or for whom information is not available may not be evaluated favorably or unfavorably on past performance. Additionally, past performance data may be obtained through the Past Performance Information Retrieval System, similar systems or other Government departments and agencies, questionnaires tailored to the circumstances of this acquisition, Defense Contract Management Agency channels, interviews with program managers and contracting officers, and other sources known to the Government (including commercial sources). Offerors may be given the opportunity to address any negative performance information resulting from the past performance assessment inquiries.
Past Performance Rating Table 2
Adjectival Rating Description Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
Unacceptable Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.
NOTE: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror will not be evaluated favorably or unfavorably on past performance IAW FAR 15.305(a)(2)(iv). Therefore, the Offeror will be determined to have unknown (or “neutral”) past performance. In context of acceptability/unacceptability, a neutral rating shall be considered “acceptable”.
Past performance shall be initially evaluated to determine whether the Offeror’s present/past performance is recent, and relevant to the effort to be acquired. Secondly, the past performance evaluation shall determine how well the Offeror performed on the prior contracts.
“Recency” is expressed as a time period during which past performance references are considered relevant, and is critical to establishing relevancy of past performance information. For purposes of this acquisition, “recent” is defined as contracts performed within the last five (5) years. The Government will not consider performance on an Offeror’s submission that concluded more than five years prior to the due date of this solicitation.
In establishing what is “relevant” for this acquisition, Offeror’s past performance shall involve performance history that was similar in scope and magnitude of effort and complexity of this acquisition. For this acquisition, the Government will utilize the following thresholds to determine relevancy:
RELEVANCE THRESHOLDS
DESCRIPTION
RELEVANT Contractor’s performance includes:
--Meeting specifications for production and delivery similar in magnitude (approximately 40,000 tons per year) of LN2 IAW MIL-PRF-27401G per year --Providing multiple deliveries of LN2 (or similar) AND --Demonstrated In-process Quality Control Procedures
FACTOR III: PRICE
The Government will evaluate the Offeror’s Price proposal as stated in this section of the solicitation:
(1) F.O.B. Destination product CLINs. For price evaluation purposes, the evaluated price of each CLIN for product 0001, 0002, 0003, 0004 AND 0005 (will be calculated by multiplying the estimated quantity by the proposed unit price of the product(s), which should include all costs associated with the offeror’s delivery of product to the location specified in the Schedule. F.o.b. destination CLINs are normally individual DLA Energy customer locations, unless otherwise specified.
(2) Non-product CLINs/subCLINs. For price evaluation purposes, the following non-product CLINS/subCLINs will be evaluated for award: CLIN 0006, 0007, 0008, 0009, 0010, 0011, 0012.
Each non-product CLIN/subCLIN’s evaluated price will be calculated by multiplying the estimated quantity by the offered unit price. Since only one award will be made, Offerors who do not propose on all non-product CLINs/subCLINs stated in the Schedule may not be considered for evaluation and award.
(3) Lowest Total Evaluated Price for F.O.B. Destination Requirements. Schedule B includes both f.o.b. destination product CLINs as well as non-product CLINs that are to be evaluated in accordance with the solicitation, the evaluated prices for all the non-product CLINs will be added to the evaluated price(s) of the applicable f.o.b. destination product CLINs to determine the lowest total evaluated price.
(4) I209.09 EXTENSION PROVISION (DLA ENERGY JAN 2012) is included and allows the Government to extend the period of performance for up to six (6) months on a unilateral basis. The method for evaluating the extension period and its associated quantities is to multiply an additional six months of requirements by the offered unit price and then to add that total evaluated price to the existing evaluated price for each line item.
The objective of price analysis is to ensure that the final agreed-to price is fair and reasonable in accordance with FAR 15.402. The level of detail of the analysis required is determined by the complexity and circumstances of the acquisition. Other than Certified Cost and Pricing Data may be requested if determined necessary by the Contracting Officer.
Completeness: The Government will evaluate the Offeror’s proposed pricing for completeness. A proposal is complete when all pricing data required under FAR 52.212-1 of the Request for Proposal and requested in the solicitation is provided in the format prescribed.
Balance: Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of price analysis techniques.
Reasonableness: The Government will evaluate the Offeror’s proposed pricing for reasonableness. The Total Evaluated Price (TEP) will include the total of all CLINS proposed, as well as, the extended pricing of the I209.09 EXTENSION PROVISION (DLA ENERGY JAN 2012). Price analysis will be used to evaluate the reasonableness of each Offeror’s TEP to satisfy the requirement mandated by FAR 15.305(a)(1). A price is reasonable if, in its nature and amount does not exceed that which would be incurred by a prudent person in the conduct of competitive business. An assessment of price reasonableness will be performed on the TEP using techniques and procedures described under FAR 15.404-1(b), Price analysis. The burden of proof for price credibility rests solely with the Offeror. Price proposals will not be rated or scored.
(End of Addendum)
| ATTACH 5 ADDENDUM 52.212-1 v3.pdf |
| VOLUME III- Price |
| ATTACH 6 52.212-2 Evaluation and Addendum v3.pdf |
| a) Offeror proposals are evaluated in accordance with the evaluation criteria. The Government intends to award one firm fixed priced requirements type contract. All Offerors must be technically acceptable and have an acceptable past performance rating... |
| (4) I209.09 EXTENSION PROVISION (DLA ENERGY JAN 2012) is included and allows the Government to extend the period of performance for up to six (6) months on a unilateral basis. The method for evaluating the extension period and its associated quantitie... |
File details come from the government source that posted it.