Amendment_0005.pdf

PDF 140 KB Posted

Attached to
West Coast Transportation/Storage
Solicitation number
SPE600-15R-0507
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0010.pdf PDF
Amendment_0004.pdf PDF
SF30_SPE60015R05070002 1 .pdf PDF
Amendment_0001_.pdf PDF
OSP_SPE600-15-R-0507_West_Coast_Transportation.docx DOCX document
West_Coast_Transportation_Storage_RFP.pdf PDF
SF_1449.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60015R0507

X

2015 JAN 30

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUED ON NEXT PAGE

The purpose of this amendment is to add F3.02 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (BULK/LUBES) (DLA ENERGY JUN 1996), to revise B0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991) and to change the discount terms:

1. F3.02 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (BULK/LUBES) (DLA ENERGY JUN 1996)

(a) Upon arrival of Contractor's transport truck or truck and trailer, the receiving activity shall promptly designate the tanks into which the load is to be discharged. Free time will commence at the time the discharge hose is connected to fill pipe at the delivery point specified and will end when discharge is completed. For items involving multiple drops, time between drops will not be included in free time.

Contractor shall be paid for detention beyond free time for delays caused by the Government. A minimum of one hour free time is required. Rate for detention shall be comparable to regulated tariffs governing the local area of receiving activity.

(1) Free time for unloading transport truck or truck and trailer:

(2) Rate for detention beyond the free time: ____________________________________.

(b) The above will not be considered in the evaluation of offers for award, except that free time of less than one hour or detention rates not comparable to regulated tariffs may render an offer unacceptable/bid nonresponsive.

UNLESS OFFEROR INDICATES OTHERWISE, FREE TIME WILL BE CONSIDERED UNLIMITED.

(c) DETENTION COSTS. Any invoices for detention costs will be forwarded directly to the Contracting Officer.

2. B0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991).

3. The discount terms are hereby changed from NET 30 to NET 15 located in the solicitation package, pg. 1, SF-1449.

4. All other terms and conditions remain unchanged.

CONTINUED ON NEXT PAGE

Section B

SECTION J - LIST OF ATTACHMENTS

List of Attachments

Description File Name ATTACH.B34.01 B34.01 Revised 6 9

2015docx.pdf

1. Please provide Western Container’ proposed prices in accordance with revised table below:

CLIN Description of Service

Service Material Number

Estimated Quantity/Unit

Offered (Proposed)

Price Total Costs

Container Transport – (DFSP Chevron ‐Seattle)

V20000327 200

0002 Load/Offload/Cleaning V20000345 88

Container /Chassis Maintenance Repair

V20000346 7

0004 Container /Chassis Inspection V20000347 20

0005 Container Storage V20000330 3500

Container Transport – (DFSP

0007 Miscellaneous Fee V20000330 3500

2. Please provide an itemized cost breakdown of the offered price for EACH Contract Line Item

Number:

CLIN 0001 Container Transport (V20000327) – (DFSP Chevron -Seattle)

Description of Service(s) Offered Rate

Flat Rate or Percentage(%

CLIN 0002 Load/Offload/Cleaning (V20000345)

Percentage%

CLIN 0003 Container /Chassis Maintenance Repair (V20000346)

CLIN 0004 Container /Chassis Inspection

Rate

CLIN 0005 Storage V20000330

Rate

CLIN 0006 Container Transport V20000327 – (DFSP Chevron -Seattle)

Flat Rate or Percentage%

CLIN 0007 Miscellaneous Fees V20000330

Flat or Percentage%

Option Year 1 ISO Container – June 1, 2016 through May 31, 2017

Service Material

Number Estimated

Quantity/Unit

Offered (Proposed)

Price Total Costs

Container Transport – (DFSP

3. Please provide an itemized cost breakdown of the offered price for EACH Contract Line Item

Rate

Rate

Option Year 2 ISO Container – June 1, 2017 through May 31, 2018

Number Estimated

Quantity/Unit

Offered (Proposed)

Price Total Costs

Container Transport – (DFSP

4. Please provide an itemized cost breakdown of the offered price for EACH Contract Line Item

Rate

Rate

Option Year 3 ISO Container – June 1, 2018 through May 31, 2019

Number Estimated

Quantity/Unit

Offered (Proposed)

Price Total Costs

Container Transport – (DFSP

5. Please provide an itemized cost breakdown of the offered price for EACH Contract Line Item

Rate

Rate

Option Year 4 ISO Container – June 1, 2019 through May 31, 2020

Number Estimated

Quantity/Unit

Offered (Proposed)

Price Total Costs

Container Transport – (DFSP

6. Please provide an itemized cost breakdown of the offered price for EACH Contract Line Item

preview
B34.01 Revised 6 9 2015docx

File details come from the government source that posted it. Updated .