JA_SPE4A616X0186_KO_Stanley_Redacted.pdf

PDF 233 KB Posted

Attached to
MOUNT, VIEWER
Solicitation number
SPE4A616X0186
Issued by

About this file

J A / NSN 5855 - 015697816 / CONTRACT SPE4A616D5852

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AVN Form S53 FOR OFFICIAL USE ONLY 2

AMSC K. This part must be produced from class 1 castings under MIL-STD-2175.

AMSC L. The annual buy value of this part falls below the screening threshold established by DoD.

AMSC M. Manufacture of this part requires use of master or coordinated tooling.

AMSC N. Manufacture of this part requires special test and/or inspection facilities to maintain function or system integrity.

AMSC P. The rights to use the data needed to purchase this part from additional source(s) are not owned by the

Government and cannot be purchased, developed, or otherwise obtained.

AMSC Q. The Government does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.

AMSC R. The Government does not own the data or rights to the data needed to purchase this part from another source. It is not economical to procure the data or rights to the data.

AMSC S. Acquisition of this item is restricted to Government approved source(s) because the item involves military sensitive technology.

AMSC U. The cost to the Government to breakout this part and acquire it competitively has been determined to exceed the projected savings over the life span of the part.

AMSC V. This part has been designated a high reliability part. Probability of failure would be unacceptable. The engineering activity has determined that data to define and control reliability limits cannot be obtained.

AMSC Y. The design of this part is unstable. Engineering, manufacturing, or performance characteristics indicate that the required design objectives have not been achieved.

AMSC Z. This part is a commercial/no-developmental/off-the-shelf item.

Other:___________________________________________________________________________________

6. Efforts to ensure that offers are solicited from as many sources as practicable are:

The acquisition will be synopsized on or about _________________ and any firm requesting a solicitation copy will be provided one.

A synopsis exception cited in FAR 5.202 applies: (Explain) ________________________________________________ Manufacturers of similar products identified in the market survey will be solicited.

Dealers of the manufacturers will be solicited.

Other: (Explain) ___________________________________________________________________________________

7. I hereby determine that the anticipated cost to the Government will be fair and reasonable. (Explain) _________________________

8. A market survey as defined by FAR 10:

was conducted, and firms indicating an interest in the acquisition will be solicited. Market research efforts, include:

was not conducted due to: ___________________________________________________________________________

9. Additional facts supporting other than full and open competition are:

Based upon the technical certification on file, technical data is not available and cannot be developed to permit full and open competition. The data presently available reflects the minimum needs of the Government.

When FAR 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate if the cost to the Government that would be duplicated and how the estimate was derived. ______________________________________

11/18/2015

Sources sought notice published via mass sources sought.

THE ACQUISTION SPECIALIST ANTICIPATES THAT THE

PRICE RECEIVED IN RESPONSE TO THE SOLICIATION W LL BE DETERMINED FA R AND REASONABLE BASED ON THE PREVIOUS PROCUREMENT HISTORY DETERMINED

FAIR AND REASONABLE AND ADEQUATE PRICING COST DATA WILL BE REQUESTED FROM VENDOR.

MARKET RESEARCH WAS DONE, THE INTERNET WAS SEARCHED TO DETERMINE THE COMMERCIALITY OF THIS ITEM. ADDITIONAL MARKET RESEARCH CAN BE FOUND ON THE COMMERCIAL

ITEM DETERMINATION. IN ORDER TO IMPROVE COMPETITION. A SOURCES SOUGHT NOTICE WAS POSTED TO NOTIFY OTHER VENDORS OF THE OPPORTUNITY, NO VENDORS RESPONDED TO THE NOTICE

SPE4A616X0186

AVN Form S53 FOR OFFICIAL USE ONLY 3

Other: ___________________________________________________________________________________________

10. A listing of sources, if any, indicating an interest in writing in the acquisition are: (if none, state none)

CAGE COMPANY NAME

11. The actions, being taken to overcome barriers to competition before any subsequent acquisition are made: (Explain)

APPROVAL

APPROVAL LEVELS OF THE JUSTIFICATION – FAR 6.304

not exceeding $ 0,000……………………………………. Contracting Officer over $ ,000 not exceeding $1 ,500,000………………… Competition Advocate

TECHNICAL/REQUIREMENTS PERSONNEL CERTIFICATION – FAR 6.302-2(c) pporting data that is the responsibility of technical or requirements personnel and which form the basis for this justification have been

DLA COUNSEL AVIATION – DLAD 1.691(e)(ii) DLA Counsel Aviation has reviewed this Form S53 and concluded is creates a legally sufficient justification for restricting competition pursuant to 10 U.S.C.

2304(c)(1) and FAR 6.302-1 in acquisitions for NSNs in the federal supply system.

CONTRACTING OFFICER – FAR 6.303-2(b)(12) I hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief. If not exceeding $ 0,000, this signature serves as the approval.

Name and Title Signature Phone Date

COMPETITION ADVOCATE – FAR 6.304(a)(2) The Competition Advocate for the procuring activity designated pursuant to FAR 6.501 has reviewed and approved this Justification for a proposed contract over $ 0,000 but not exceeding $1 .5 million.

Name and Title Signature Phone Date

If any response received from the sources sought after the deadline, they will be considered for future buys. There was no previous J&A, as this is the first time placing the

NSN on long term contract.. The dollar amounts in he previous acquisitions did not require J&As.

NONE NONE

Synopsis will be posted so other manufacturers that are interested can submit source approval packages for DLA Aviation's consideration IAW alternate offer provision 52.217-9002

Alan R Stanley ALAN.R.1 11/20/2015

Gwendolyn C. Pearson PEARS

OLYN.C 11/20/15

SPE4A616X0186

File details come from the government source that posted it. Updated .