gpp4986 Typewritten Text 9N206
CONTINUED ON NEXT PAGE
"Material Certifications shall be required for each component of the end item at time of inspection."
Indefinite Delivery Purchase Order (IDPO) for a base term of three years plus an option term of one year (four year contract in total).
TIMKEN'S REQUEST FOR A MINUS 10% QUANTITY VARIANCE TO ACCOUNT FOR SCRAP DURING MANUFACTURING HAS BEEN
APPROVED.
NSN 3110-00-949-9052
FOR INFORMATION PURPOSES ONLY:
The Guaranteed Minimum of 18 each is applicable to the base period only.
There is no guarantee that the Government will place any orders after the guaranteed minimum of base year of the contract/order.
The following quantities are applicable to both the base and option periods:
Minimum Delivery Order Quantity: 18 each Maximum Delivery Order Quantity: 36 each
**Maximum Contract Value: $150,000.00**
BASE PERIOD (YEARS 1-3)
YEAR 1: $_465.80__________
YEAR 2: $_477.45__________
YEAR 3: $_491.77__________
OPTION PERIOD (YEAR 4)
YEAR 4: $___________
The required delivery is 357 days after receipt of order.
Supplies Inspection CAGE: 9N206 Packaging Inspection CAGE: 1CT67
DCMA ADMINISTRATION OFFICE FOR CONTRACT ADMINISTRATION AND SUPPLIES INSPECTION ADMINISTRATION: S3605A
DCMA DAYTON
AREA C, BUILDING 30
1725 VAN PATTON DRIVE
WRIGHT-PATTERSON AFB, OH 45433-5302
DCMA ADMINISTRATION OFFICE FOR PACKAGING INSPECTION ADMINISTRATION: S3915A
DCMA PHILADELPHIA, PA
700 ROBBINS AVENUE, BLDG. 4-A
P.O. BOX 11427
PHILADELPHIA, PA 19111-0427
"Ship to" addresses will be identified on each individual delivery order.
PAGE 2 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE4A6-14-D-5034
All deliveries will be within the continental United States.
52.211-9G22 DLA AVIATION PALLETIZATION FOR MIL-STD-2073 IN ACCORDANCE WITH MD00100452 REVISION B (JUL 2008)
(a) Palletization.
(1) When the total number of containers going to the same destination is 250 pounds or greater (excluding pallet) or a volume of 20 cubic feet or greater, then palletization IAW MIL-STD-147 is required.
(2) When the total number of containers going to the same destination is less than 250 pounds (excluding pallet) and is less than 20 cubic feet, then palletization is not required IAW MIL-STD-147.
(3) Except as otherwise provided in this clause, shipping containers shall be palletized IAW the guidance cited in MIL-STD-147. Special palletization instructions may be further specified under other preparation for delivery instructions in this order/contract. In the case of any inconsistency between such special palletization instructions in the requirements cited in this clause, the special palletization instructions shall take precedence.
(4) Pallets required for use, shall comply with ANSI/MH1, Part No. MH1/9-02SW4048. This part number shall be used for Level A packaging when the total weight is less than 1500 lbs. evenly distributed. This part number shall be used for Level B packaging when the total weight is greater than 1500 lbs., but less than 3000 lbs. evenly distributed.
***NOTE***Use of nonstandard commercial pallets is forbidden unless cited in the contract/purchase order.
(i) The following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Non-Manufactured Wood Packaging Material (NMWPM) entering a European country or destined for a Container Consolidation Point (CCP) or an aerial or water port of embarkation: All wooden pallets and wood containers produced entirely or in part of non-manufactured softwood species shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) coniferous material and certified accordingly by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations both dated May 30, 2001. All wooden pallets and containers produced entirely of non-manufactured hardwood species shall be identified by a permanent marking of "NC," 1.25 inches or greater in height, accompanied by the CAGE code of the contracted manufacturer and the month and year of the contract. On pallets, the marking shall be applied to the stringer or block on opposite sides and ends of the pallet and be contrasting and clearly visible. On containers, the marking shall be applied on a side other than the top or bottom, contrasting and clearly visible.
(ii) Oak and chestnut wood shall be bark free and square edged so that none of the natural rounded surface tissues remain, or be bark free and have a moisture content no greater than 20%. The contractor is responsible for performing an inspection of each shipment to assure compliance with this requirement.
(5) Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums (see paragraph 5(i) thru (iv), shall be palletized IAW Load Type VI of MIL-STD-147. Pallets used shall be as cited above. "Hazardous Material" for the purpose of this clause, means any material considered hazardous under the Department of Transportation Hazardous Material Regulations, 49 CFR 171-79, IATA, IACO, IMDG,unless otherwise specified.
***NOTE*** Shrink wrap is not authorized for use with Hazardous Materials.
PAGE 3 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(i) 55 gallon drums for domestic delivery shall be palletized 3 per pallet IAW with load type 3a bonding method G (stretch wrap) or 4 per pallet IAW load type VI of MIL-STD-147 (placing an inverted wood cap under and over the load secured by metal strapping).
(ii) 55 gallon drums for export delivery shall be palletized 4 per pallet IAW load type VI of MIL-STD-147 (placing an inverted wood cap under and over the load secured by metal strapping).
(iii) Cylinders for domestic delivery shall be palletized vertically IAW load type IX of MIL-STD-147 or horizontally using metal strapping IAW MIL-STD-147 bonding method D (figure 36) and notched wood spacers (storage aid #25, figure 50) to assure the stability of the load.
(iv) Cylinders for export delivery shall be Palletized (vertically) IAW load type IX of MIL-STD-147.
(6) The use of stretch-wrap, shrink film or nonmetallic strapping for bonding is not authorized for "Export Shipments".
(7) Stretch-wrap, when utilized, shall be accomplished mechanically with a (machine or hand held tool that based on the weight of items being palletized, maintains sufficient tension to assure secure bonding of the items to the pallet during transportation).
(8) Unless otherwise specified in the contract or Purchase Order, all polyethylene/plastic containers for domestic delivery with or without fiberboard over pack shall be palletized IAW load type 3a bonding method G (stretch wrap) or IAW Load "Type VI of MIL-STD-147 to ensure stacking support during transportation and storage. All polyethylene/plastic containers for export delivery with or without fiberboard over pack shall be palletized IAW Load Type VI of MIL-STD-147.
(b) Loading: Five-gallon tight head pails shall be loaded on pallets IAW Load Type III or IIIA of MIL-STD-147, except that a triple layer or course may be used for a total not to exceed 42 pails.
(c) Unitization: Supplies that do not lend themselves to the use of MIL-STD-147 palletization due to size, weight, configuration, etc. shall be unitized by securely blocking, bracing, or anchoring the load on a skid base or commercial type pallet in a manner that assures safe delivery.
52.246-9G36 CONFIGURATION CONTROL DSCR (JUN 2003)
NOTICE TO CONTRACTORS: The requirements of this clause are identified to MIL-STD-973. DSCR will continue to reference MIL-STD-973 in solicitations and contracts until implementation of DLA configuration control requirements. The full text of MIL-STD-973 is available at:
http://www.dscr.dla.mil/userweb/dscrbat/qaps.htm
(a) When configuration management control is cited in the
PAGE 4 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Procurement Item Description, the furnished item(s) shall conform to the approved configuration requirements/revision specified unless a variation is processed and approved as provided for at (b) below.
(b) Variations shall be identified and approval obtained in accordance with MIL-STD-973 dated 17 APR 92, with Interim Notice 3 dated 12 JAN 95 as follows:
(1) Process an Engineering Change Proposal for any changes to the approved configuration in accordance with Paragraph 5.4.2 and Subparagraphs thereto and APPENDIX D, except that Subparagraphs 5.4.2.3.1, 5.4.2.3.5.1, and 5.4.2.3.5.2 do not apply.
(2) Process requests for deviation from the approved configuration in accordance with Paragraph 5.4.3 and Subparagraphs thereto and APPENDIX E.
(3) Process requests for waiver from the approved configuration in accordance with Paragraph 5.4.4 and Subparagraphs thereto and APPENDIX E.
(4) Process requests for parts substitution from the approved configuration in accordance with Paragraph 5.4.5 and Subparagraphs thereto.
(5) Process Specification Change Notices in accordance with Paragraph 5.4.6 and Subparagraphs thereto and APPENDIX F.
(6) Process Notices of Revision (NORS) in accordance with Paragraph 5.4.7 and APPENDIX G.
(7) Process configuration control (short form procedure) inaccordance with Paragraph5.4.8 and Subparagraphs thereto and
APPENDIX D.
PAGE 5 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION B
SUPPLIES/SERVICES: 3110-009499052
ITEM DESCRIPTION:
CUP, TAPERED ROLLER BEARING
"SOURCE CONTROL DATA"
SIKORSKY AIRCRAFT CORPORATION
CAGE: 78286
DWG: SB3261 REV D
P/N:SB3261B-1
THIS IS A SOURCE CONTROLLED ITEM WHICH MUST BE
MANUFACTURED AND TESTED IN ACCORDANCE WITH THE
CITED LIMITED RIGHTS DATA.THE GOVERNMENT CAN-
NOT PROVIDE THE DATA. ONLY THOSE VENDORS WHO
HAVE ACCESS TO THE DATA OR CAN PROVIDE TRACE-
ABILITY TO THEAPPROVED SOURCES SHOULD QUOTE.
SAR PACKAGE IS REQUIRED IF YOUR COMPANY IS
CONSIDERING SOURCE APPROVAL.
APPROVED SOURCE:
THETIMKEN CORPORATION
CAGE: 60038
IDENTIFY TO:
CONFIGURATION CONTROL ITEM IAW CITED DRAWING AND/OR PART NUMBER.
SEE CLAUSE52.246-9G36 (SECTION I).
DOCUMENTATION REQUIREMENTS OF CLAUSE 52.211-9042 (SECTION L) APPLY FOR
NEW OFFERORS NOT CITED HEREIN.
ITEMIDENTIFICATION IAW MIL-STD-130N, DTD 17-DEC-2007.
MIL-STD-130N DATED 16 NOV 2012.
IDENTIFICATION MARKING OF U.S. MILITARYPROPERTY
BEARING RESTRICTION:
AN AWARD FROM THIS SOLICITATION CAN ONLY BE MADE FOR A BEARING
MANUFACTURED IN THE UNITED STATES,ITS OUTLYING AREAS, OR CANADA AND FOR
EACH BALL OR ROLLER BEARING, THE COST OF THE BEARING COMPONENTS (BEARING
ELEMENT, RETAINER,INNER RACE, OR OUTER RACE) MINED, PRODUCED OR
MANUFACTURED IN THE UNITED STATES, ITS OUTLYING AREAS, OR CANADA MUST
EXCEED 50% OFTHE TOTAL COST OF THE BEARING COMPONENTS OF THAT BALL OR
ROLLER BEARING. SEE DFARS CLAUSE 252.225-7016, RESTRICTION ON
ACQUISITIONOF BALL AND ROLLER BEARINGS (DEC 2010).
A CONTRACTOR'S DECLARATION ON THE DOMESTIC/FOREIGN NATURE OF MATERIAL
BEING OFFERED ISREQUIRED. PLEASE VISIT THE FOREIGN BEARING WEBSITE AT
http://www.aviation.dla.mil/UserWeb/ForeignBearingWaiver/index.htm TO
OBTAINA COPY OF THE CONTRACTOR'S DECLARATION FORM. PLEASE PRINT,
COMPLETE, SIGN AND HAVE READY FOR SUBMISSION UPON REQUEST FROM THE
BUYER. FAILURE TO PROVIDE THIS INFORMATION MAY RESULT IN YOUR QUOTE NOT
BEING CONSIDERD FOR AWARD.
IN THE EVENT NO OFFERED BEARINGS MEETTHIS SOURCING REQUIREMENT, THIS
SOLICITATION MAY BE CANCELLED AND A WAIVER MAY BE REQUESTED BY THE
PAGE 6 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SUPPLY/SERVICE: 3110-009499052 CONT'D
PROCUREMENT ACTIVITY. UPONRECEIPT OF AN APPROVED WAIVER FROM THE
DOMESTIC SOURCING RESTRICTION, THE REQUIREMENT MAY BE RE-SOLICITED. SEE
DFARS 225.7009-4,WAIVER, RESTRICTION ON BALL AND ROLLER BEARINGS (DEC
2010).
SAMPLE:
1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAWANSI/ASQ
Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE
APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO
DEFECTS IS REQUIRED
2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE
FOR REJECTION OF THE ENTIRE CONTRACTQUANTITY.
52.246-11 Higher Level Contract Quality Requirement (Manufacturers)
A QUALITY MANAGEMENT PROGRAM MEETING THEREQUIREMENTS OF ISO 9001:2008;
A PROGRAM COMPARABLE TO ISO 9001:2008 OR THE FOLLOWING TAILORED VERSION
OF ISO 9001:2008 ISREQUIRED
DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008
4 Quality management system
4.1 General requirements,[excluding reference to 1.2 and excluding NOTE 3 c)]
4.2 Documentation requirements
4.2.1 General
4.2.2 Quality manual, [excluding reference to 1.2]
4.2.3 Control of documents
4.2.4 Control of records
5.1 Management commitment
5.2 Customer focus
5.3 Qualitypolicy
6.2.2 Competence, training and awareness
7.1 Planning of product realization, [excluding NOTE 2]
7.2.1 Determination ofrequirements related to the product
7.2.3 Customer communication
7.3.7 Control of design and development changes
7.4.3Verification of purchased product
7.5.1 Control of production and service provision
7.5.3 Identification and traceability
7.5.4Customer property
7.5.5 Preservation of product
7.6 Control of monitoring and measuring equipment
8.2.1 Customersatisfaction
8.2.4 Monitoring and measurement of product
8.3 Control of nonconforming product
8.5.2 Corrective action
8.5.3Preventive action
PAGE 7 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
THE TIMKEN CORPORATION 60038 P/N SB3261B-1
IAW BASIC DRAWING NR 1X4F3 AMSCBDOC
REVISION NR DTD03/07/2007
PART PIECE NUMBER:
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 3110-00-949-9052 ** EA $ ** $ **
CUP, TAPERED
ROLLER BEARING
PRICING TERMS: Firm Fixed Price
BASE PERIOD
SUPPLIES/SERVICES: 3110-009499052
Delivery CLIN Price (in days) .
0001 $ ** TO BE CITED ON EACH DELIVERY ORDER **
OPTION 01
SUPPLIES/SERVICES: 3110-009499052
Delivery CLIN Price (in days) .
0001 $ ** TO BE CITED ON EACH DELIVERY ORDER **
QTY VARIANCE: PLUS 0% MINUS 10%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: DESTINATION DELIVERY DATE: ** TO BE CITED ON EACH DELIVERY ORDER **
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP = 001: PRES MTHD = ZZ: CLNG/DRY = X: PRESV MAT = XX:
WRAP MAT = XX: CUSH/DUNN MAT = XX: CUSH/DUNN THKNESS = X:
UNIT CONT = XX: OPI = M:
INTRMDTE CONT = XX: INTRMDTE CONT QTY = XXX:
PACK CODE = U:
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE: 51 -
PALLETIZATION SHALL BE INACCORDANCE WITH MD00100452 REV B
DATED 08183
PAGE 8 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Markings Paragraph
For all shipments of packaged materiel to thegovernment, which includes either Depot (DLA-Direct) or DVD (Customer-Direct) shipments, both DoD linear ... If there areinconsistencies between the schedule and MIL-STD-129P, the schedule takes precedence.
* All containers shall be tested to meetASTM D4169, Standard Practice for Performance Testing of Shipping Containers and Systems.
* All Section D Packaging Clauses takeprecedence over ASTM D3951.
* In addition to requirements in MIL-STD-129P, all Labeling and Marking shall have a Method ofPreservation of Commercial Pack applied to the MIL-STD-129 identification labels on all shipping containers, including the unit andintermediate levels. The Method of Preservation
(M) of Commercial Pack (CP) shall be applied to all labels and marking as “MCP.”
* For all shipments of packaged materiel to the Government, which includes either Depot(DLA-Direct) or DVD (Customer-Direct)shipments, both DoD linear and two-dimensional (2D) bar code markings are required in accordance with MIL-STD-129. See DLAD52.211-9010 for exceptions to the Military Shipment Label (MSL) requirement. When the MSL is required, the Transportation ControlNumber (TCN) is not an exception and must always be present. TCN construction is detailed in DoD 4500.9-R (Appendix L).
* TheUnit of Issue (U/I) and Quantity per Unit Pack (QUP) as specified in the contract take precedence over ASTM D3951.
* Loose-fillcushioning and dunnage materials are prohibited in all shipments to DOD customers.
* Unitization in accordance with MIL-STD-147,Palletized Unit Loads, is required for all shipments to the DOD activities.
PRESERVATION, PACKAGING, PACKING, ANDMARKING
REQUIREMENTS SHALL BE IN ACCORDANCE WITH
MIL-DTL-197L.
1. METHOD OF PRESERVATION SHALL BE DETERMINED BY
BEARING TYPE ANDSIZE (REFER TO TABLE I).
2. PARAGRAPH 3.10.2, SELECTION OF UNIT
PRESERVATION, APPLIES. PROTECTIVE LUBRICANT OR
PRESERVATIVE COMPOUND SHALL BE DETERMINED
DEPENDANT UPON BEARING TYPE AND CLOSURE IN
ACCORDANCE WITH PARAGRAPH 3.3.4 AND TABLE II.
FOR PRESERVATIONPROCESS CONTROLS, DEPENDANT
UPON BEARING TYPE, CLOSURE, AND LUBRICANT,
PARAGRAPHS 3.4 THROUGH 3.9 APPLY.
3. PACKAGING PRECAUTIONARYMARKING REQUIREMENTS
OF PARAGRAPH 3.12.4 APPLY.
PAGE 9 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
4. CONTRACTOR'S PACKAGING FACILITY SHALL ADHERE
TO THE QUALITY ASSURANCEVERIFICATION
REQUIREMENTS AS CONTAINED WITHIN SECTION 4 OF
MIL-DTL-197L.
...END OF SPECIAL PACKAGING INSTRUCTIONS...
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 1000014885 0001 N/A N/A N/A N/A
PAGE 10 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION D - PACKAGING AND MARKING
252.211-7006 RADIO FREQUENCY IDENTIFICATION (SEP 2011) DFARS
(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that—
(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:
(A) Subclass of Class I – Packaged operational rations.
(B) Class II – Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.
(C) Class IIIP – Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.
(D) Class IV – Construction and barrier materials.
(E) Class VI – Personal demand items (non-military sales items).
(F) Subclass of Class VIII – Medical materials (excluding pharmaceuticals, biologicals, and reagents – suppliers should limit the mixing of excluded and non-excluded materials).
(G) Class IX – Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and
(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/rfid/ or to—
(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to—
(B) The following location(s) deemed necessary by the requiring activity:
Contract Line, Subline, or Exhibit Line Item Number
Location Name
City
State
DoDAAC
(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:
(i) Shipments of bulk commodities.
(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast Payment Procedures.
(c) The Contractor shall—
(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more RFID tags and conforms to the requirements in paragraph (d) of this clause;
(2) Use passive tags that are readable; and
(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-129 (Section 4.9.2) tag placement specifications.
(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC™ Tag Data Standards in effect at the time of contract award. The EPC™ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.
(1) If the Contractor is an EPCglobal™ subscriber and possesses a unique EPC™ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC™ Tag Data Standards document to encode tags.
(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located at http://www.acq.osd.mil/log/rfid/tag_data.htm. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.
(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1).
(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph
(d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
PAGE 11 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE4A6-14-D-5034
http://www.acq.osd.mil/log/rfid/ http://www.epcglobalinc.org/standards/ http://www.acq.osd.mil/log/rfid/tag_data.htm http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/%20https:/wawf.eb.mil/
(End of clause)
52.211-9010 SHIPPING LABEL REQUIREMENTS – MILITARY-STANDARD (MIL-STD) 129P (MAR 2012) DLAD
52.211-9010 SHIPPING LABEL REQUIREMENTS – MILITARY STANDARD (MIL-STD) 129P (NOV 2011), ALT I (AUG 2005)
DLAD
52.211-9033 PACKAGING AND MARKING REQUIREMENTS (APR 2008) DLAD
52.211-9095 PALLETIZATION OF SHIPMENTS (SEP 2012) DLAD
52.246-9062 REPACKAGING TO CORRECT PACKAGING DEFICIENCIES (SEP 2008) DLAD
52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007) DLAD
SECTION E - INSPECTION AND ACCEPTANCE
52.246-02 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999) FAR
The Contractor shall comply with the higher-level quality standard selected below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]
Title Number Date Tailoring
[] AS 9100 OR EQV.
[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.] (End of clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS
52.246-9003 MEASURING AND TEST EQUIPMENT (NOV 2011) DLAD
52.246-9008 INSPECTION AND ACCEPTANCE AT ORIGIN (NOV 2011) DLAD
(a) Inspection and Acceptance are at Origin.
(b) The point of acceptance will be the point of last inspection before shipment unless otherwise indicated by the offeror.
(c) The Offeror shall indicate below the location where supplies will be inspected:
Supplies:
Plant:
THE TIMKEN COMPANY
Commercial and Government Entity (CAGE) Code: 9N206 Street: 1957 E HIGH AVE City/State/Zip: NEW PHILADELPHIA, OH 44663 Applicable to contract line-item(s) (CLIN(s):
ALL
(d) The Offeror shall indicate below the location where packaging will be inspected:
Packaging:
[ ] Same as for supplies, or, Plant:
ACTION PAK
Cage Code: 1CT67
PAGE 12 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Street: 5200 UNRUH AVE STE B City/St/Zip: PHILADELPHIA, PA 19135 Applicable to clin(s): ALL
52.246-9019 MATERIAL AND INSPECTION REPORT (APR 2008) DLAD
SECTION F - DELIVERIES OR PERFORMANCE
52.211-16 VARIATION IN QUANTITY (APR 1984) FAR
(b) The permissible variation shall be limited to:
0 Percent increase 10 Percent decrease This increase or decrease shall apply to ALL CLINS .
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.211-9020 TIME OF DELIVERY - ACCELERATED (JUN 2008) DLAD
52.211-9054 TIME OF DELIVERY – NEGOTIATED IQCs AND SIMPLIFIED ACQUISITIONS FOR IDPOs (NOV 2011) DLAD
(b) Delivery is required in accordance with the schedule set forth below.
WITHIN THE NUMBER OF DAYS STATED BELOW AFTER DATE OF DELIVERY ORDER
NSN(S) QUANTITY (PER
CALENDAR MONTH)
GOVERNMENT
REQUIRED
OFFEROR’S
PROPOSED
3110-009499052 Up to 36 each 357 Each additional each (or less) ADD:
Up to each Each additional each (or less) ADD:
Up to each Each additional each (or less) ADD:
Up to each Each additional each (or less) ADD:
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-34 F.O.B. DESTINATION (NOV 1991) FAR
52.247-48 F.O.B. DESTINATION - EVIDENCE OF SHIPMENT (FEB 1999) FAR
52.247-9016 F.O.B. DESTINATION CONTRACTOR TRANSSHIPMENT (NOV 2011) DLAD
52.247-9031 MANUFACTURER'S LOADING PRACTICES (NOV 2011) DLAD
52.247-9035 SHIPPING INSTRUCTIONS (DOMESTIC) (NOV 2011) DLAD
Mail instructions (not applicable to Army Post Office (APO) or Fleet Post Office (FPO) addresses):
(a) Route domestic shipments within mail limitations as follows based on the transportation priority (TP) reflected in the "mark for" data with each contract line item number (CLIN). Commercial small parcel carrier (e.g., United Parcel Service (UPS) or Federal Express) is an acceptable mode of shipment to domestic addresses.
PAGE 13 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(1) Ship all NMCS, 777, and 999, regardless of TP or distance, by commercial small parcel carrier.
(2) Ship TP 1 and 2 (IPD 01-08) by priority mail or most economical comparable mode.
(3) Ship TP 3 (IPD 09-15) and all stock locations (not TP coded) by surface parcel post (Fourth Class) or most economical comparable mode.
(4) The cost of parcel post insurance will not be paid by the Government.
(b) Freight instructions (domestic).
(1) Ship all NMCS, 777, and 999, regardless of TP or distance by commercial small parcel carrier.
(2) For TP 1 and 2 (IPD 01-08) weighing under 250 pounds, use air freight and specify air on the invoice. Exceptions: if destination is within 600 miles of origin, use regular surface transportation.
(3) For all other freight shipments, contact the cognizant transportation officer for delivery and carrier routing instructions.
(4) Advance telephonic notice of delivery must be given by the carrier to the consignee's transportation officer (transport control/prelodge desk) at least 24 hours prior to delivery of freight shipments (other than small parcels). Bills of lading must be annotated to reflect this requirement. Addresses for direct shipments within the contiguous United States (CONUS) and Canada are shown "in the clear" with each individual CLIN on schedule continuation sheet(s) in each order. Addresses for stock shipments are shown with each individual CLIN on schedule continuation sheet(s) in each order.
(End of Clause)
52.247-9038 SHIPPING INSTRUCTION FOR DLA DIRECT ACQUISITIONS (NOV 2011) DLAD
52.247-9034 POINT OF CONTACT FOR TRANSPORTATION INSTRUCTIONS (JUN 2013) DLAD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
52.246-9039 REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES (NOV 2011) DLAD
(a) The Contractor shall remove or obliterate from a rejected end item and its packing and packaging, any marking, symbol, or other representation that the end item or any part of it has been produced or manufactured for the United States Government. Removal or obliteration shall be accomplished prior to any donation, sale, or disposal in commercial channels. The Contractor, in making disposition in commercial channels of rejected supplies, is responsible for compliance with requirements of the Federal Trade Commission Act (15 United States Code (U.S.C.) 45 et seq.) and the Federal Food, Drug and Cosmetic Act (21 U.S.C. 301 et seq.), as well as other Federal or State laws and regulations promulgated pursuant thereto.
(b) Unless otherwise authorized by the Contracting Officer, the Contractor is responsible for removal or obliteration of government identifications within 72 hours of rejection of nonconforming supplies including supplies manufactured for the Government but not offered or supplies transferred from the Government's account to the cold storage Contractor's account at origin or destination. (For product rejected at destination and returned to the Contractor's plant, the 72 hour period starts with the time of Contractor receipt of returned product). After removal or obliteration is accomplished and prior to disposition, the Contractor must notify the Government inspector.
(End of Clause)
SECTION I - CONTRACT CLAUSES
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JAN 2009) DFARS
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2013) FAR
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (MAY 2013) DFARS
52.209-01 QUALIFICATION REQUIREMENTS (FEB 1995) FAR
(a) Definition. “Qualification requirement,” as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
PAGE 14 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
http://assist.daps.dla.mil/quicksearch/
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror’s Name: __________________________________
Manufacturer’s Name: _____________________________
Source’s Name: __________________________________
Item Name: ______________________________________
Service Identification: ______________________________
Test Number: ____________________________________
(to the extent known)
(d) Even though a product or service su bject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government’s best interests.
(e) If an offeror, manufacturer, source, product or service has met the qualification requireme nt but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract.
Unless determined to be in the Government’s interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
(End of clause)
52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (AUG 2013) FAR
52.209-9013 COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED MANUFACTURERS LIST (QML) (NOV 2011)
DLAD
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008) FAR
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS
(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.
(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:
(Offeror insert information for each SPI process) SPI Process:
PAGE 15 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Facility:
Military or Federal Specification or Standard:
Affected Contract Line Item Number, Subline Item Number, Component, or Element:
52.211-9002 PRIORITY RATING (NOV 2011) DLAD
52.211-9004 PRIORITY RATING FOR VARIOUS LONG-TERM CONTRACTS (NOV 2011) DLAD
52.211-9061 TIME OF DELIVERY (OVERLAPPING ORDERS) INDEFINITE DELIVERY CONTRACT (IDC) (NOV 2011) DLAD
The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NUMBER QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT
0001 36 357
(Any balance shall be delivered at the rate of every days thereafter.)
In the event of overlapping orders, the contractor is not required to deliver any more than in any day period.
OFFEROR’S PROPSED DELIVERY SCHEDULE
ITEM NUMBER QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT
(Any balance shall be delivered at the rate of every days thereafter) In the event of overlapping orders, the contractor is not required to deliver any more than in any day period.
(End of Clause)
52.213-9012 INDEFINITE DELIVERY PURCHASE ORDER (IDPO) - BILATERAL (SEP 2012) DLAD
(a) The contractor agrees that it will accept additional orders under the same terms and conditions specified in the order. This agreement becomes binding upon delivery of the initial order, which is the minimum quantity for this IDPO. The initial delivery order represents the minimum quantity for this IDPO, and the Government is under no obligation to place additional orders under this contract. The Government may place additional orders for a period of FOUR year(s) from the date of the basic order. All additional orders will reference the initial order. The aggregate value of all orders shall not exceed the simplified acquisition threshold. Therefore, the maximum value under the IDPO is $150,000, or $6,500,000 for acquisitions conducted under Federal Acquisition Regulation (FAR) Subpart 13.5.
(b) Evaluation of Quotes. If quotes include variable pricing based upon conditions such as quantity ranges, transportation zones, and/or option years, quotes will be evaluated by establishing an average unit price. The average unit price will be established for awards under $150,000, by adding all unit prices together, then dividing the sum by the number of unit prices. For acquisitions conducted under FAR Subpart 13.5 that exceed $150,000, quotes will be evaluated in accordance with
52.215-08 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR
52.216-19 ORDER LIMITATIONS (OCT 1995) FAR
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 18 EACH, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
PAGE 16 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of 36 EACH ;
(2) Any order for a combination of items in excess of 36 EACH ; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d ) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 15 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-22 INDEFINITE QUANTITY (OCT 1995) FAR
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period ; provided, that the Contractor shall not be required to make any deliveries under this contract after EXPIRATION DATE (End of clause)
252.216-7006 ORDERING (MAY 2011) DFARS
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from DATE OF AWARD through EXPIRATION DATE [insert dates].
52.216-9023 ADDITIONAL ORDERING LIMITATION (APR 2008) DLAD
52.216-9024 ADJUSTMENT TO ORDERING PERIOD (APR 2008) DLAD
(a) The ordering period established in FAR Clause 52.216-18 is based upon the assumption that an award will be made by 12/31/13 .
The ordering period specified in 52.216-18 will be extended by the number of calendar days after the date that the contract is, in fact, awarded.
52.217-09 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) FAR
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 [insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed FOUR YEARS (months) (years).
(End of clause)
52.222-03 CONVICT LABOR (JUN 2003) FAR
52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (MAR 2012) FAR
52.222-20 WALSH-HEALEY PUBLIC CONTRACTS ACT (OCT 2010) FAR
PAGE 17 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999) FAR
52.222-26 EQUAL OPPORTUNITY (MAR 2007) FAR
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010) FAR
52.222-50 COMBATTING TRAFFICKING IN PERSONS (FEB 2009) FAR
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) FAR
252.225-7001 BUY AMERICAN ACT AND BALANCE OF PAYMENTS PROGRAM (JUN 2012) DFARS
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (JUN 2012) DFARS
252.225-7016 RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JUN 2011) DFARS
52.232-01 PAYMENTS (APR 1984) FAR
52.232-08 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002) FAR
52.232-11 EXTRAS (APR 1984) FAR
52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986) FAR
52.232-25 PROMPT PAYMENT (OCT 2008) FAR
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) DFARS
52.232-9010 ACCELERATED PAYMENTS TO SMALL BUSINESS (JUN 2012) DLAD
52.233-01 DISPUTES (JUL 2002) FAR
52.233-03 PROTEST AFTER AWARD (AUG 1996) FAR
52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) FAR
52.243-01 CHANGES - FIXED PRICE (AUG 1987) FAR
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) DFARS
52.244-06 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2010) FAR
52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) FAR
(b) Contractor’s obligations.
(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for ONE YEAR FROM THE LAST DELIVERY UNDER THE CONTRACT [Contracting Officer shall state s pecific period of time after delivery , or the specified event whose occurrence will terminate the warranty period; e.g., the number of miles or hours of use, or combinations of any applicable events or periods of time]—
(c) Remedies available to the G overnment.
(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b)(1) of this clause within ONE YEAR FROM THE LAST DELIVERY UNDER THE CONTRACT [Contracting Officer shall insert specific period of time;
e.g., “45 days of the last deliver y under this contract,” or “45 days after discovery of the defect”].
52.246-9043 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NON-MANUFACTURERS) (NOV 2011) DLAD
52.246-9066 DOCUMENTATION OF TRACEABILITY (JAN 2009) DLAD
PAGE 18 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
252.247-7023 TRANSPORATION OF SUPPLIES BY SEA (MAY 2002) DFARS
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (MAY 2002), ALT III (MAY 2000) DFARS
52.248-01 VALUE ENGINEERING (OCT 2010) FAR
(3) The source of the savings (the instant contract, or concurrent and future contracts), as follows:
CONTRACTOR'S SHARE OF NET ACQUISITION SAVINGS (Figures in percent) Contract Type : ______________ __________________ Incentive (Voluntary) : ___________________ _________ Program Requirement (Mandatory) : _____ ___________ Instant Contract Rate Concurrent and Future Contract Rate : ________ __ _____ Instant Contract Rate : ________________ __________ _ Concurrent and Future Contract Rate : _ ______________
(m) Data. The Contractor may restrict the Government’s right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:
These data, furnished under the Value Engineering clause of contract ________ ________ , shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause .
52.249-01 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR 1984) FAR
52.249-08 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984) FAR
52.252-02 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) FAR
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.dla.mil/Acquisition and http://farsite.hill.af.mil/ .
(End of Clause)
52.252-06 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) FAR
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any DoD FAR Supplement (DFARS) (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of Clause)
52.253-01 COMPUTER GENERATED FORMS (JAN 1991) FAR
PAGE 19 OF 19 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
http://www.dla.mil/Acquisition http://farsite.hill.af.mil/
| Word Bookmarks |
| D |
| P1802_100620 |
| E |
| F |
| H |
| I |
| wp1115080 |
| wp1115081 |
| 2013-10-18T09:42:00-0400 | |
| JUMP.BRANDON.M.1402174834 |
File details come from the government source that posted it. Updated .