LSJ_FAR_13.106-1b.pdf

PDF 341 KB Posted

Attached to
SOLE SOURCE KUWAIT Federal contract opportunity
Solicitation number
SP7000-19-Q-1001
Issued by
Defense Logistics Agency

About this file

LSJ

View the file

Other files for this federal contract opportunity

Other files attached to SOLE SOURCE KUWAIT, newest first.
File Type Posted
Attachment_1-CLIN_Structure.xlsx XLSX spreadsheet
PWS.pdf PDF
SP7000-19-Q-1001_Combo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

HEADQUARTERS

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR, VIRGINIA 22060-6221

Date

Justification for Other than Full and Open Competition IAW FAR 13.106-1(b)

1. Nature and/or description of the action being approved:

2. A description of the supplies or services required to meet the agency’s needs (including the estimated value):

3. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires only one source in accordance with FAR 13.106-1(b) Example: urgency, exclusive licensing agreements, brand name, industrial mobilization, or any other reasonable justification

4. A description of the market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted:

5. Any other facts supporting the use of other than full and open competition, such as:

Explanation of why technical data packages, specifications, engineering descriptions, statements of work, or purchase descriptions suitable for full and open competition have not been developed or are not available

TECHNICAL PERSONNEL: I certify that any supporting data that is the responsibility of technical or requirements personnel and which form a basis for the justification are complete and accurate.

Technical Personnel

8. A statement of the actions the agency has taken to avoid this other than full and open competition action and additional other than full and open actions in the future:

Contracting Officer

7. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition (Include the results of the request for information or the sources sought notification in accordance with DFARS PGI 206.302-1 or include the waiver from the HCA or designee):

6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies:

CONTRACTING APPROVAL: The justification, as presented above, is accurate and complete to the best of my knowledge and belief. Additionally, I have determined that the anticipated cost to the Government will be fair and reasonable.

Text1: 10/24/2018
Text2: DLA Data Management Services has a need to issue a sole source contract action to continue lease support for multi-functional devices (MFD) without using competitive procedures for 230 MFDs in Kuwait. An award (SP7000-19-P-0005) for a new lease has been issued with PoP start date of 12/1/2018. Before delivery can take place, the end users are requiring to do their own tests for network security. There is currently a sole source contract (SP7000-18-P-0113) in place until 10/31/2018. The projected sole source contract will cover continued lease support starting 11/12018 through 11/30/2018 with two options for 12/1/2018-12/31/2018 and 1/1/2019-1/31/2019.
Text3: Continued MFD lease support for 1 month and two, one-month options, to include full service maintenance, all consumable supplies (excluding paper), networking functionality, security accreditation along with technical and network installation support.

POP: November 1, 2018 - November 30, 2018 Option 1: December 1, 2018 - December 31, 2018 Option 2: January 1, 2019 - January 31, 2019 Estimated value is $171,120.00

Text5: Although other vendors are available to supply MFDs with consumables and services; there is a short time period to allow installation. There is no other vendor that would be able to deliver new devices in time for a 11/1/2018 start date. The devices are in place and need to be extended on a sole source contract. Since the devices in place are under a lease, no other vendor can service the lease of another vendor without violating the lease terms. The only way to ensure uninterrupted support is to issue a contract to the current vendor.
Text6: Market research indicates that there is an adequate competition pool for requirements of this type. The contract will only be in place for a maximum of 3 months to allow new devices to be delivered that are replacing the existing MFDs under contract SP7000-19-P-0005.
Text7: Attempting to do a short-term contract via competitive procedures would result in unacceptable delays to achieve contract award and delivery/installation of new equipment. The unacceptable delays would entail removal of the 230 devices currently in place, re-competing the short term rental, and delivery of the short term rental, during which the customers would be without devices. A contract with up to 3 months (with options) will provide adequate time for the delivery and installation of new devices.
2018-10-26T10:21:45-0400
HIKES.MIRANDA.MARIE.1264253906
2018-10-25T08:34:47-0400
LANGE.PAUL.CHARLES.1284317714
Text10: Synopsis shall be published on FBO
Text11: TBD, A solicitation shall be posted
Text12: There have been several attempts to establish a contract in place at this location. Both awards (SP7000-17-P-0042 and SP7000-18-P-0040 resulted in terminations)The current contract that is in place (SP7000-19-P-0005), requires network security testing by the end user, the contract was signed 10/2/2018, as long as testing is completed by the end of November 2018, the contractor has 60 days to install devices per the PWS; which is why there is two, one-month options on the contract, to allow time for testing and delivery.

File details come from the government source that posted it.