ODS_Support_System_Cylinder_Procedures.doc
DOC document 44 KB Posted
- Attached to
- ODS Support Services at Richmond Federal contract opportunity
- Solicitation number
- SP4703-15-R-0001
- Issued by
- Defense Logistics Agency Aviation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ODS_Support_Leak_Monitoring_and_Detecting_Procedures-May_2010.doc | DOC document | |
| ODS_Customer_Turn-in_Flow_Document.pdf | ||
| ODS_Support_Reclamation_Tracking__Accounting_Procedure.docx | DOCX document | |
| ODS_Support_ODS_Turn-in_Procedures.docx | DOCX document | |
| 15-R-0001_Past-Performance-Questionnaire.docx | DOCX document | |
| 15-R-0001_RFP_ODS_Support.docx | DOCX document | |
| RETURN_CHECK-IN_AND_TAGGING_PROCEDURE_Feb_25_2011.doc | DOC document | |
| 15-R-0001_Synopis-Solicitation_ODS_Support.docx | DOCX document | |
| 15-R-0001_RFP_ODS_Support.docx | DOCX document | |
| 15-R-0001_Past-Performance-Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OZONE DEPLETING SUBSTANCES (ODS) RESERVE
SYSTEM CYLINDER PROCEDURES
(PRE-SHIP LEAK, PRESSURE & WEIGHT CHECK)
FEBRUARY 2011
18 FEB 2011
SUBJECT:
Halon 1301 Navy System Cylinder Pressure, Leak and Weight Check
Instructions Prior to Issue
PURPOSE:
To promulgate step-by-step procedures for properly inspecting and performing pre-ship leak, pressure and weight checks on US Navy/Coast Guard Shipboard Fire Suppression System Cylinders (system Cylinders).
1. Due to the potential for Halon 1301 Navy System Cylinders to leak, lose pressure and/or weight during storage, warehouse personnel must inspect each system cylinder being issued to ensure they comply with acceptable pressure and weight limits, as referenced by OPNA V 4790-85, see table below:
Acceptable Cylinder Pressure
| Temperature |
| Minimum |
| Maximum |
| 30 Degrees F |
| 425 psi |
| 1075 psi |
| 40 Degrees F |
| 450 psi |
| 1100 psi |
| 50 Degrees F |
| 500 psi |
| 1150 psi |
| 60 Degrees F |
| 525 psi |
| 1175 psi |
| 70 Degrees F |
| 550 psi |
| 1225 psi |
| 80 Degrees F |
| 575 psi |
| 1250 psi |
| 90 Degrees F |
| 625 psi |
| 1300 psi |
| 100 Degrees F |
| 650 psi |
| 1325 psi |
| 110 Degrees F |
| 700 psi |
| 1375 psi |
| 120 Degrees F |
| 775 psi |
| 1450 psi |
| 130 Degrees F |
| 900 psi |
| 1600 psi |
2. Steps for inspecting Halon 1301 cylinders for leaks, pressure and weight:
a) When issuing any Halon 1301 system cylinder, warehouse personnel will first remove the cylinder valve protection cap. This will expose the pressure gage.
b) Warehouse personnel will next test the surface temperature of the cylinder, using a Raytek® MiniTemp ™ temperature gage or its equivalent. The laser temperature gage will be pointed at the middle portion of the cylinder and trigger depressed. The gage will display the surface temperature of the cylinder.
c) Using the table above cross-reference from the surface temperature to the pressure gage on the cylinder.
d) If the pressure (in psi) is not between the minimum and maximum pressure DO NOT ISSUE the cylinder. Choose another cylinder.
e) If a replacement cylinder is selected, go back to Step 1 and follow the instruction.
f) After the pressure inspection has been completed check the cylinder for leaks using the TIF XP-1A Leak Detector.
g) If the cylinder has any leaks DO NOT ISSUE the cylinder. Choose another cylinder.
h) If a replacement cylinder is selected, go back to Step 1 and follow the sequence beginning at 2.a).
i) After the leak check has been completed check the cylinder for weight.
j) Place the cylinder on a known calibrated scale and record the weight.
k) Locate the Tare Weight which is stamped on the cylinder dome.
l) Subtract the Tare Weight from the scale weight to obtain the net weight of the cylinder. This weight will include both halon and nitrogen. Compare the net weight of the cylinder to the size system cylinder listed below:
m) System cylinder net weight within the above acceptable range will be issued. If the system cylinder net weight is below or above the acceptable range DO NOT ISSUE the cylinder. Choose another cylinder.
| Cylinder Size |
| Acceptable Range |
| 125 lbs. |
| 116 - 139 lbs. |
| 95 lbs. |
| 89 - 106 lbs. |
| 60 lbs. |
| 57 - 67 lbs. |
| 15 lbs. |
| 13.5 - 23 lbs. |
| 10 lbs. |
| 10 - 23 lbs. |
n) If a replacement cylinder is selected, go back to Step 1 and follow the sequence beginning at 2.a ).
o) After the pressure, leak and weight checks are completed and ALL are acceptable, replace the cylinder valve cap and tighten.
p) Issue the cylinder.
3. Upon completion of the issue process, if there are any cylinders identified with discrepancies, (leaks, low pressure or low weight), mark and remove from inventory.
20. Attach a worksheet identifying the discrepancies to each cylinder.
21. Report findings to work leader.
Sample Navy System Cylinder Worksheet Discrepancies
Date: ____________________
Cylinder Number: _________ Size of cylinder: 10 15 60 95 125 (Circle one) Kidde Ansul Pressure Check: ________ (Record Pressure) Pass ______ Fail _______
(Check One)
Temperature: __________ (Record Cylinder Temperature) Leak Check: Pass ______ Fail ______ (Check One) Leak Rate: ________@ Level 3 = ___________ oz. Per year.
If leaking, note location on cylinder using chalk.
Weight Check: Pass _____ Fail _____ (Check One)
Record weight of cylinder without cap: ______________
Record Tara weight: ______________
Subtract Tara weight from cylinder weight: ______________
Attach copy to each rejected cylinder.
Contract Number: _________________________
MHM Date: ________________
NSN: ______________________________________
File details come from the government source that posted it. Updated .