CONTINUATION SHEET SP4702-16-R-0025
TABLE OF CONTENTS
SECTION A. . . . . . . . . . Solicitation (SF 1142)/Continuation Page/Table of Contents
SECTION B. . . . . . . . . . Supplies or Services and Prices or Costs
SECTION C. . . . . . . . . . Specifications/SOW/SOO/ORD
SECTION D. . . . . . . . . . Packaging and Marking (Not Applicable)
SECTION E. . . . . . . . . . Inspection and Acceptance
SECTION F. . . . . . . . . . Deliveries or Performance
SECTION G. . . . . . . . . Contract Administration Data (Not Applicable). . . . . . . . . . . . . . . . . . . . n/a
SECTION H. . . . . . . . . Special Contract Requirements
SECTION I. . . . . . . . . . Contract Clauses
SECTION J. . . . . . . . . . List of Documents, Exhibits, and Other Attachments
SECTION K. . . . . . . . . Representations, Certifications, and Other Statements of Offerors. . . 144
SECTION L. . . . . . . . . . Instructions, Conditions and Notices to Offerors
SECTION M. . . . . . . . . Evaluation Factors for Award
Attachment 1 Project Drawings
Attachment 2 Construction Cost Estimate
Attachment 3 DOL Wage Rate Determination
********************** Construction Acquisition ***************
NOTE: SITE VISIT REQUEST IS MANDATORY. CONTRACTOR SHALL SUBMIT
SITE VISIT REQUEST 7 DAYS IN ADVANCE DUE TO SECURITY MEASURES
FROM AUGUST 30, 2016. SITE VISIT SUBMISSION REQUEST WILL NOT BE
ALLOWED AFTER AUGUST 19, 2016.
Requirement Summary:
PR 64005411
FR 200056394
Cost Center: 3000012 Ledger account# 61002540 Firm-Fixed-Price Acquisition Set-Aside 100% Small Business.
Period of Performance: 120 days (After the Notice to Proceed Letter) FOB Inspection at Destination (DoDAAC# SC0707) Acquisition Authority: Federal Acquisition Regulation (FAR) Part 36, “Construction and Architect -- Engineer Contracts” and (FAR) Part 15 “Contracting by Negotiation” procedures and regulations will be utilized.
Delivery Location: Defense Logistics Agency Land and Maritime, Defense Information Systems Agency, Maintenance Room, Building 23.
Unit of Issue: JB (JOB).
DLA Internet Bid Board System (DIBBS) quotations are no acceptable for this solicitation. Offeror’s must complete the entire solicitation including amendments previous posted in http://www.fedbizopps.gov. Proposals must be submitted on hard copy of this Request for Proposal (RFP) and scanned and emailed to ricardo.blancosoto@dla.mil. Construction Cost Estimate and Project Plan must be submitted with your company proposal to be considered complete.
(X) INFORMATION TO BE PROVIDED BY THE GOVERNMENT AND/OR THE VENDOR, AND
CLAUSES/PROVISIONS THAT ARE REQUIRED TO BE PROVIDED IN PARTIAL OR
FULLTEXT. IN ADDITION, DUE TO SYSTEM LIMITATIONS, SOME MANDATORY
CLAUSES/PROVISIONS MAY BE DUPLICATED. IN THE EVENT DUPLICATED
CLAUSES/PROVISIONS HAVE DIFFERENT DATES, THE MOST CURRENT IS APPLICABLE.
(X) FULL AND OPEN COMPETITION ACQUISITION AFTER EXCLUSION OF SOURCES (FAR
6.2)
(X) CONTRACT MUST BE REGISTERED ON; SYSTEM FOR AWARD MANAGEMENT (SAM)
BEFORE PROPOSAL SUBMISSION. CHECK THE FOLLOWING SAM’s WEBSITE LINK
FOR REGISTRATION AND/OR SAM EXPIRATION DATE, WWW.SAM.GOV .
Better drawings resolutions are available upon request to Ricardo Blanco (ricardo.blancosoto@dla.mil).
http://www.sam.gov/ mailto:ricardo.blancosoto@dla.mil
GREEN PROCUREMENT
All products proposed for use in, or requisitioned under this contract must conform to federal Green Procurement regulations as they relate to the Environmental Protection Agency's (EPA) Comprehensive Procurement Guidelines. These products include Energy Star or Federal Energy Management Program designated electronics; United States Department of Agriculture bio-based designated products; Electronic Product Assessment Tool designated electronics; alternative fuels and fuel efficiency; and nonozone depleting substances. Such products must meet contract performance requirements, taking into consideration price, competition, and availability factors.
DLAD 52.237-9003 SITE VISIT COORDINATOR (MANDATORY REQUIREMENT)
(a) Offerors are mandatory to attend an organized site visit by reporting to the DLA Installation
Support –Columbus Engineering Services Branch , Building 308, Defense Supply Center (DSCC), Columbus, Ohio on August 30, 2016 at 1:30 PM eastern time. Please email Ricardo Blanco at ricardo.blancosoto@dla.mil with a list of attendees’ names. Email should be submitted no later than "7 DAYS" prior to the site visit. (b) Prospective offerors are notified that remarks or explanations provided during a site visit shall not qualify the terms of this solicitation. Unless and until this solicitation is amended in writing, terms of the solicitation and specifications remain unchanged.(c) Site visitors requiring interpretation or clarification of technical or contractual requirements included in this solicitation are encouraged to submit their questions and any information obtained during the site visit to the Contracting Officer, by contacting the individual identified on the face of the solicitation.
*CONTRACTORS MUST ATTEND TO THE SITE VISIT IN ORDER TO BID ON THIS
CONSTRUCTION PROJECT.
QUESTIONS & ANSWERS
All questions shall be asked via email. Questions must be asked no later than September 2, 2016 no later than 12:00 p.m. eastern time.
COMPLETE PROPOSAL INSTRUCTIONS
All contractors shall provide SF 1442 (including Section B/vendor fill-in provisions), written qualifications, work experience, and references for projects satisfactorily completed within the last THREE (3) years, demonstrating the contract is qualified and experienced to perform the specific work. The written qualifications statement shall be certified and signed by the principle of the contract firm. In addition, "PROJECT PLAN" must be submitted with our company proposal.
FINAL INSPECTION AND ACCEPTANCE
Upon completion of the entire project a final inspection will be performed by the contractor, the Contracting Officer or their authorized representative and authorized representatives from the Facilities Engineering Division, DS-FCIE (Construction Administration Office, Operations & Maintenance Office and Engineering Office).
The following provisions are applicable to this solicitation:
Warranty of Construction (FAR 52.246-21).
Preconstruction Conference (FAR 52.236-26).
Contract Drawings, Maps, and Specifications (DFARS 252.236-7001).
Site Visit (52.236-27).
Liquidated Damages- Construction (52.211-12).
Site Investigation and Conditions Affecting the Work (FAR 52.236-3).
Cleaning-Up (FAR 52.236-12).
Protection of Existing Vegetation, Structure, Utilities, and Improvement (FAR 52.236-9).
Limitation of Government Liability (FAR 52.216-24).
Contract Definitization (FAR 52.216-25).
Contractor Personnel Security Requirements (FAR 52.204-9000).
Material Cost Reduction Initiative To ensure DLA continues delivering products and services at the most economical costs, DLA Contracting Services Office has initiated a Material Cost Reduction Initiative. To support this initiative, please be advice, the Government is seeking to reduce material pricing by as much as 10% per CLIN on this solicitation. Please consider the Government's objective when supplying your company's offer.
Proposals are required to be received by September 12, 2016 at 1:00 PM Eastern Standard Time to one of the following addresses:
If mailed via USPS regular mail:
Defense Supply Center Columbus DLA Contracting Support Office Columbus ATTN: DCSO-C / Ricardo Blanco / 020-A2N106 P. O. Box 3990 Columbus, OH 43218-3990
If mailed via Private couriers (i.e., UPS or Fedex):
Defense Supply Center Columbus DLA Contracting Support OfficeColumbus ATTN: DCSO-C / Ricardo Blanco / 020-A2N106 3990 E. Broad St.
Columbus, OH 43213-1152
Email:
“Submission of proposal by electronic commerce (e-mail) is allowed. E-mailed proposal shall not be transmitted directly to the contracting officer instead to the buyer (Ricardo Blanco). Submit e-mailed proposals to Ricardo.blancosoto@dla.mil or fax 614-693-1572. E-mailed proposals cannot exceed 12-
15 MB.”
mailto:Ricardo.blancosoto@dla.mil
The acquisition specialist should continue to allow submission of offers by other methods, such as facsimile proposals IAW DLAD provision 52.215-9008 and FAR provision 52.215-5. E-mail proposals that exceed the 12-15 MB limit will be rejected as undeliverable; therefore offerors cannot rely solely on being able to submit offers via e-mail. Contact Ricardo Blanco to receive a verbal confirmation that the proposal was successfully received.
(X) Preferred method is email to Ricardo.blancosoto@dla.mil (Phone# 614-692-5296) or (Fax # 614- 692-1572).
Wide Area Workflow Information:
Information for Wide Area Workflow (WAWF) Invoicing: Use 2 in 1 document Invoice. To ensure timely payment the vendor should enter the required info in WAWF on the day the material ships from their facility. Contractors/vendors not using WAWF will need to register for WAWF in order to gain access to the new MyInvoice functionality.
Wide Area Workflow (WAWF) is a secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.
WAWF is in accordance with the 2001 National Defense Authorization Act (DFARS 252.232- 7003/252.232-7006 Electronic Submission of Payment Requests - January 2004) which requires claims for payment under a Department of Defense Contract to be submitted in electronic form.
As of March 03, 2008, DOD has issued a final rule amending the Defense Federal Acquisition Regulation supplement (DFARS) to require use of the Wide Area Workflow as the only acceptable electronic system for submitting requests for payment (invoices and receiving reports) under DOD contracts.
Government credit card would not be utilized for this purchase request. All payments will be processed and submitted through WAWF "only".
When creating invoice in WAWF Contractor "must" input DoDAAC# SP4702 under Service Acceptor field. Otherwise the payment wouldn’t be process on time.
Below web link for Wide Area Workflow Reference Guidance for Vendors. (Note: this guidance would help the vendor the entire process of registration, submitting, void, and track invoices in
WAWF).
http://www.ncmbc.us/docs/WAWFHelpdesk.pdf
DLA WAWF Assistance (General Questions) 703-767-1915 wawf@dla.mil http://www.ncmbc.us/docs/WAWFHelpdesk.pdf mailto:wawf@dla.mil
Main Point of Contacts:
Kent Klingler Mechanical Engineer DLA Installation Support Columbus Office:614-692-2926 Kent.Klingler@dla.mil
David DiGiulio Facility Engineering - Columbus Ohio Mechanical Engineer Office: 614-692-3335 David.DiGiulio@dla.mil
Acquisition Office Main Point of Contact:
Ricardo Blanco Contract Specialist DLA Contracting Services Office-OH Office: 614-692-5296 Fax: 614-693-1572 Ricardo.blancosoto@dla.mil
Wide Area Workflow Main Point Of Contact:
James R. Cook Engineer Technician DLA Installation Support Columbus Office: 614- 692-5552 Cellphone: 614- 989-6006 James.r.cook@dla.mil
Contracting Officers Representative (COR):
James R. Cook Engineer Technician DLA Installation Support Columbus Office: 614- 692-5552 Cellphone: 614- 989-6006 James.r.cook@dla.mil mailto:Kent.Klingler@dla.mil mailto:David.DiGiulio@dla.mil mailto:David.DiGiulio@dla.mil mailto:James.r.cook@dla.mil mailto:James.r.cook@dla.mil
ANTITERRORISM TRAINING BY CONTRACTOR
(a) In accordance with DOD Instruction 2000.16 and DLA Instruction 6308, Level 1 Antiterrorism (AT Training must be completed on an annual basis by all employees of the contractor performing under this requirement and may be accomplished by one or two means:
1. Under the instruction of a qualified Level 1 AT Awareness Instructor
2. Competition of a DoD-sponsored certified computer or web-based distance learning instruction for Level 1 AT Awareness, which can be found at http://jko.jten.mil/courses/atl1/launch.html for non_CAC holders and https://jkodirect.jten.mil/Altas2/faces/page/login/Login.seams for CAC holders.
(b) Specifically, only those employees whose contract performance requires them to have routine access to federally-controlled facility and/or routine access to a federally-controlled information system must take the training. Also note that the contractor shall coordinate with the Contracting Officer for those employees that require access only intermittently or for a period of less than six months, to determine if the training is required.
(c) Upon initial hire the contractor will contact the onsite DLA Antiterrorism Officer (ATO) to schedule the initial training.
(d) The Certificates are valid for one year; therefore, training shall be completed every year for the duration of the contract.
(e) The contractor shall maintain copies of all training certificates for the duration of the contract and may be required to supply copies of the training certificates to the Contracting Officer no more than biannually for submission to the ATO.
http://jko.jten.mil/courses/atl1/launch.html https://jkodirect.jten.mil/Altas2/faces/page/login/Login.seams
SECTION B – SUPPLIES OR SERVICES AND PRICES OR COST:
PROJECT CSC - 15308 “REPLACE CHILLER COOLER WATER FILTRATION
SYSTEM AT BUILDING 23”.
ITEM NO. CONSTRUCTION QUANTITY UNIT UNIT PRICE COST
AMOUNT
0001 CHILLER COOLER 1.00 JOB $________ $___________
BUILDING 23
*TOTAL PRICE (CLIN 0001) $________________
PERIOD OF PERFORMANCE: ________________ (DAYS)
The contractor shall complete the following columns: Unit Price and Total Cost per CLIN/Building. Additionally, the contractor must complete the Construction Cost Estimate and Project Plan as part of their proposal submission to be considered complete INCLUDING any amendments generated for this solicitation. Incomplete proposal will not be considered technically acceptable.
This contract shall be completed within 120 calendar days from the Notice to Proceed is issued. This performance period is “Negotiable”.
Note: Quantity and unit price (Section B) will be flipped at the award stage for invoicing purposes.
* Bid Bond, Ovehead and Profit cost shall be included under "TOTAL PRICE" (CLIN 0001).
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The text of any referenced FAR, DFARS, or DLAD clause/provision may be obtained electronically at http://farsite.hill.af.mil/ (DLA Procurement Regulations). The complete edition of Federal Acquisition Regulations (FAR) or DoD FAR Supplement (DFARS) may be obtained by purchase from the Superintendent of Documents, Government Printing Office, Washington, DC 20402.
The clauses/provisions incorporated by reference have the same force and effect as if they were in full text; however, those having no bearing on the instant acquisition become self-deleting.
MAGNITUDE OF THIS CONSTRUCTION PROJECT IN TERMS OF ESTIMATED
COST:
( ) This Project is estimated less than $25,000.
( ) This Project is estimated between $25,000 and $100,000.
(X) This Project is estimated between $100,000 and $250,000.
( ) This Project is estimated between $250,000 and $500,000.
( ) This Project is estimated between $500,000 and $1,000,000.
( ) This Project is estimated between $1,000,000 and $5,000,000.
( ) This Project is estimated between $5,000,000 and $10,000,000.
( ) More than $10,000,000.
DESCRIPTION OF WORK:
CSC-15308 “Replace Chiller Cooler Water Filtration System at Building 23”.
This Statement of Work (SOW) performed shall include all labor, equipment, material and services necessary to install 3 centrifugal separator systems and cooling tower piping for the cooling tower basins serving Building 23. Items of work shall include but not limited to removing two centrifugal separators and installing three new centrifugal separator systems, suction and discharge piping, cooling tower piping, spray nozzles, heat trace and all necessary pipe supports needed for a complete system.
NOTE: While the Government currently intends to purchase the requirements sought in this solicitation, it may nevertheless be canceled in the event of spending cutbacks necessitated by passage of the Balanced Budget and Emergency Deficit Control Act of 1985, P.L.99-177.
NOTICE: Any contract awarded to a contractor who, at the time of award was suspended, debarred, ineligible for receipt of contracts with government agencies or in receipt of a notice of proposed debarment from any government agency, is voidable at the option of the Government.
The contractor shall review section C for further details.
(The following is applicable when marked with an "X".)
(X) Wage Rate Decision OH 20150099 (07/08/2016) No. Of Pages# 178 through 184 (attached)
STATEMENT OF WORK
FOR
CHILLER COOLING WATER FILTRATION, BLDG. 23
PROJECT CSC-15308
DEFENSE SUPPLY CENTER COLUMBUS
3990 EAST BROAD STREET
COLUMBUS, OHIO 43218-5000
MAY 2016
STATEMENT OF WORK
TABLE OF CONTENTS
SECTION TABLE OF CONTENTS Page Numbers
Section 01 10 00 General Requirements and Scope of Work
14 thru 16
Section 01 33 00 Submittal Procedures 17 thru 27
Section 01 35 31 Security, Safety, and Fire Provisions 28 thru 44
Section 01 45 00. 10
Quality Control For Minor Construction 45 thru 57
Section 02 41 00 Demolition 58 thru 64
Section 23 05 15 Common Piping for HVAC 65 thru 81
Section 23 07 00 Thermal Insulation for Mechanical Systems
82 thru 96
Section 26 00 00.00 20 Basic Electrical Materials and Methods 97 thru 100
Section 26 05 00.00 40 Common Work Results for Electrical 101 thru 110
GENERAL REQUIREMENTS AND SCOPE OF WORK
03/14
1.1 GENERAL: This Statement of Work (SOW) performed shall include all labor, equipment, material and services necessary to install 3 centrifugal separator systems and cooling tower piping for the cooling tower basins serving Building 23.
Items of work shall include but not limited to removing two centrifugal separators and installing three new centrifugal separator systems, suction and discharge piping, cooling tower piping, spray nozzles, heat trace and all necessary pipe supports needed for a complete system.
a) The Contractor shall furnish all plant, labor, material, supplies, equipment, tools, delivery, disposal and supervision required in performing all operations in conjunction with this project complete, in strict accordance with these specifications and Contract Drawing No. 4-568 subject to the terms and provisions of this contract. This section of the specifications is applicable to all other sections herein.
b) All work, material, design, and fabrication shall comply with applicable provisions of the Codes, Standards, and recommendations as herein described
c) Building 23 is a controlled access facility. Contractor must have completed a visitors access request before being allowed access. Contractors will have to be escorted throughout the facility
1.2 CONTRACT DRAWINGS: The contract drawings indicate the extent and general arrangement of the existing facilities, new work, materials and equipment installations. If any departures from the contract drawings, other than minor adjustments, are deemed necessary by the Contractor, details of such departures and the reasons therefore shall be submitted to the Contracting Officer or their authorized representatives soon as practicable for approval. No such departures shall be made without the written approval of the Contracting Officer.
1.3 MATERIALS AND EQUIPMENT: Unless otherwise specified or indicated on the drawings, all materials used in this project shall be new and shall be in compliance with respective material specifications indicated. Materials shall be the standard products of a manufacturer regularly engaged in the manufacture of the product. Items of material/equipment shall essentially duplicate material/equipment that has been in satisfactory use at least two years prior to bid opening.
1.3.1 Materials and equipment shall be installed in accordance with the approved recommendations and instructions of the manufacturer for obtaining conformance with the contract documents.
1.3.2 Materials delivered to the site shall be inspected for damage, unloaded, and stored with a minimum of handling.
Storage facilities shall be provided by the contractor at the job site for maintaining materials at temperatures and conditions recommended by the manufacturer. Storage accommodations shall afford easy access for inspection and identification of each shipment.
1.3.3 Warranty of Construction: In addition to the warranty clause as specified in FAR 52.246.21 and Alternate I (April 1984), the Contractor shall provide to the Government, upon the completion of the project, the standard warranty of the material/equipment offered by the manufacturer which extends beyond the one year warranty of construction.
1.4 VERIFICATION OF DIMENSIONS: In addition to the “Site Investigation and Conditions Affecting the Work” clause under FAR 52.236.3 (Apr 1984), the Contractor shall familiarize himself thoroughly with all details of the work and working conditions, verify all critical dimensions and other data in the field, and advise the Contracting Officer or their authorized representative of any discrepancy before performing any work.
1.5 CONTRACTOR QUALIFICATIONS: This project requires the use of specialized skills and equipment. Contractors submitting bids for this project shall have a valid license to install plumbing systems within the State of Ohio, and shall have a minimum of 3 years’ experience in the plumbing field.
Contractor’s experience shall include a minimum of two projects of similar size and scope. To be technically acceptable the contractor must provide a project plan to demonstrate that they are capable of completing all work in accordance with the Statement of Work and project drawings. The plan must identify all work that can be accomplished with in-house resources and demonstrate that they are capable of obtaining any project requirements that cannot be self-performed. Offerors must provide information regarding the technical qualifications of the proposed project staff, to include the individuals who will be responsible for Project Management, Quality Control Safety Compliance.
All contractors shall submit the following with their proposal:
• Written qualification statement for the individual who will be functioning as the project
SECTION 01 10 00
manager, demonstrating 3 years of project management experience for projects similar in nature to work described in the statement of work.
• Written qualifications statement for the individual who will be responsible for quality control demonstrating 3 years of quality control experience for projects similar in nature to work described in the statement of work.
• Written qualifications statement for the individual who will be responsible for safety demonstrating 3 years of safety experience for projects similar in nature to work described in the statement of work. This individual must document a minimum of 40 hours of OSHA safety training.
• Written work experience, and references for projects satisfactorily completed within the last three years of similar size and scope.
The written qualifications statement shall be certified and signed by a principle of the offeror. Offerors need only submit a brief resume of each key individual. This will be evaluated to determine if they have the appropriate technical training, certifications, if required, and previous construction experience to meet the technical requirements of a project of this nature.
If any of the submitted individuals will perform more than one of the listed functions, this is acceptable as long as the submitted documentation identifies any and all functions the given individual will be performing.
1.6 COORDINATION AND COOPERATION: The Contractor involved in the performance of this project shall coordinate the work to eliminate delay and shall submit, in a format provided by the Contracting Officer, within five (5) days after date of Notice to Proceed, a schedule of operations to the Contracting Officer or their authorized representative, for approval. All work shall be performed in strict accordance with the schedule of work approved by the Contracting Officer, unless any delay is found excusable within the meaning of the default clause, referenced elsewhere herein. The Contractor’s central point of contact on this project will be the Contracting Officer, who will be assisted by the government project engineer and the government construction inspector. The areas at which the work is to be performed may remain active and operational during the performance of this contract. It is imperative that all work performed under this contract be scheduled and phased to minimize disruption of utility systems, personnel, vehicular traffic and provide accessibility to the buildings at all times.
1.7 DAILY ACTIVITY REPORTS: Shall be submitted by the Contractor to the Contracting Officer, or Government Inspector each day activity or work occurs at the job site. The daily report shall include the date, contract number and title, report number, contractor’s name, weather conditions, work location, description of activity or work performed, safety actions, work hours, personnel, equipment, subcontractors, deliveries, and other pertinent information.
1.8 INTERRUPTIONS OF UTILITIES:
1.8.1 No utility services shall be interrupted or blocked off without approval of the Contracting Officer or their authorized representative.
1.8.2 Scheduling for interruption, shutdown of services shall be submitted in writing to the Contracting Officer or their authorized representative not less than SEVEN (7) days prior to date of all proposed interruptions. The request shall give the following information:
(1) Nature of utility or system (sewer, water, electrical, fire sprinkler system, etc.)
(2) Size of line and location.
(3) Buildings, Services, and Equipment Affected.
(4) Hours and date, estimated length of time of interruption
1.9 RECORD DRAWINGS: The Contractor shall maintain record drawings on file at the project site. As part of the final inspection and acceptance, the Contractor shall furnish the Contracting Officer or their authorized representative three (3) complete sets of Record Drawings. Record Drawings shall be kept up to date during the process of work and shall be made available to the Contracting Officer, or their authorized representative, upon request.
1.10 PROTECTION FROM DAMAGE: In addition to FAR 52.236.9 "Protection of Existing Vegetation, Structures, Utilities, and Improvement" (Apr 84), the contractor shall take all the necessary precautions to protect Government equipment and property at the job site, and shall be responsible for any damage to the equipment and property that may occur as a result of his negligence in connection with the prosecution of the work performed. Damage to Government equipment or property shall be repaired by the Contractor at his expense.
1.11 DUST CONTROL: The amount of dust resulting from any work performed shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
1.12 CLEAN-UP: The contractor shall comply with FAR 52.236-12, "Cleaning-Up" (Apr 84). In addition, upon completion of the work at the end of each work shift, the contractor shall leave the premises in a clean and neat condition satisfactory to the Contracting Officer. Drop cloths or other suitable methods shall be used as required to protect the equipment and the personnel. Contractor shall remove the rubbish and debris from Government property daily, unless otherwise directed.
1.12.1 Remove and transport all debris and rubbish from the project site in a manner that will prevent spillage from streets and adjacent areas. The contractor shall comply with all applicable Federal, State and Local hauling and disposal regulations.
1.13 FINAL INSPECTION AND ACCEPTANCE: Upon completion of the entire project a final inspection will be performed by the contractor, the Contracting Officer or their authorized representative and authorized representatives from the Facilities Engineering Division, DS-FCI (Construction Administration Office, Operations & Maintenance Office and Engineering Office.
-- End of Section --
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTALS
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (GA)
1.4.2 For Information Only
1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
1.5.1 Submittals Required from the Contractor
1.5.1.1 O&M Data
1.6 PREPARATION
1.6.1 Transmittal Form
1.6.2 Identifying Submittals
1.6.3 Format for SD-02 Shop Drawings
1.6.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions
1.6.5 Format of SD-04 Samples
1.6.6 Format of SD-05 Design Data and SD-07 Certificates
1.6.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports
1.6.8 Format of SD-10 Operation and Maintenance Data (O&M)
1.6.9 Format of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
1.6.10 Source Drawings for Shop Drawings
1.6.10.1 Terms and Conditions
1.6.11 Electronic File Format
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's
Instructions
1.7.3 Number of Samples SD-04 Samples
1.7.4 Number of Copies SD-05 Design Data and SD-07 Certificates
1.7.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
1.7.6 Number of Copies of SD-10 Operation and Maintenance Data
1.7.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
1.8 INFORMATION ONLY SUBMITTALS
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting that Variations are Compatible
1.9.4 Review Schedule is Modified
1.10 SUBMITTAL REGISTER AND DATABASE
1.10.1 Use of Submittal Register
1.10.2 Contractor Use of Submittal Register
1.10.3 Action Codes
1.10.3.1 Government Review Action Codes
1.10.3.2 Contractor Action Codes
1.10.4 Copies Delivered to the Government
1.11 SCHEDULING
1.11.1 Constraints
1.12 GOVERNMENT APPROVING AUTHORITY
1.12.1 Review Notations
1.13 DISAPPROVED SUBMITTALS
1.14 APPROVED SUBMITTALS
1.15 APPROVED SAMPLES
1.16 WITHHOLDING OF PAYMENT
1.17 PROGRESS SCHEDULE
1.17.1 Bar Chart
1.18 STATUS REPORT ON MATERIALS ORDERS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 33 00
SUBMITTAL
PROCEDURES
05/11
PART 1 GENERAL
1.1 SUMMARY
The engineering representative may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager and the Designer of Record, if applicable, to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications;
warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
A submittal register showing items of equipment and materials for when submittals are required by the specifications is provided as "Appendix A - Submittal Register".
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work), commencing work on site or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance Surety bonds List of proposed Subcontractors List of proposed products Construction progress schedule Submittal register Schedule of values Health and safety plan Work plan
Contractor Quality Control(CQC) plan Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work .
SD-05 Design Data Design calculations, mix designs, analyses or other data pertaining to a part of work.
Design submittals, design substantiation submittals and extensions of design submittals.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements.
Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor QC approval. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION Submittals are
classified as follows:
1.4.1 Government Approved (GA)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered to be "shop drawings."
1.4.2 For Information Only (FIO)
Submittals not requiring Government approval will be for information only. For Design-build construction all submittals not requiring Designer of Record or Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
1.5.1 Submittals Required from the Contractor
As soon as practicable after award of contract, and before procurement of fabrication, forward to the engineering and the contracting offices submittals required in the technical sections of this specification, including shop drawings, product data and samples.
The engineering representative will review and approve for the Contracting Officer those submittals reserved for Contracting Officer approval to verify submittals comply with the contract requirements.
1.5.1.1 O&M Data
The Facility Engineering Representative will review and approve for the Contracting Officer O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.
1.6 PREPARATION
1.6.1 Transmittal Form
Use the transmittal form ENG Form 4025-R for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. This form may be provided upon request or is available at the USACE Publications website:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_4025-R.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_4025-R.pdf
Properly complete this form by filling out all the heading blank spaces and identifying each item submitted.
Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.2 Identifying Submittals
When submittals are provided by a Subcontractor, the Prime Contractor is to prepare, review and stamp with Contractor's approval all specified submittals prior to submitting for Government approval.
Identify submittals, except sample installations and sample panels, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Date of the drawings and revisions.
d. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other subcontractor associated with the submittal.
e. Section number of the specification section by which submittal is required.
f. Submittal description (SD) number of each component of submittal.
g. When a resubmission, add alphabetic suffix on submittal description, for example, submittal 18 would become 18A, to indicate resubmission.
h. Product identification and location in project.
1.6.3 Format for SD-02 Shop Drawings
Shop drawings are not to be less than 8 1/2 by 11 inches nor more than 30 by 42 inches, except for full size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless other form is required. Drawings are to be suitable for reproduction and be of a quality to produce clear, distinct lines and letters with dark lines on a white background.
Present 8 1/2 by 11 inches sized shop drawings as part of the bound volume for submittals required by section.
Present larger drawings in sets.
Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph IDENTIFYING SUBMITTALS.
Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location adjacent to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.
Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings.
Identify materials and products for work shown. Include the nameplate data, size and capacity on drawings. Also include applicable federal, military, industry and technical society publication references.
Submit drawings PDF format.
1.6.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions
Present product data submittals for each section as a complete, bound volume. Include table of contents, listing page and catalog item numbers for product data.
Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.
Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, submit as specified for SD-07 Certificates.
Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the engineering representative. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
Collect required data submittals for each specific material, product, unit of work, or system into a single submittal and marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of construction effort.
Submit manufacturer's instructions prior to installation.
1.6.5 Format of SD-04 Samples
Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:
a. Sample of Equipment or Device: Full size.
b. Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.
c. Sample of Materials Exceeding 8 1/2 by 11 inches: Cut down to 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.
d. Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches.
Examples of linear devices or materials are conduit and handrails.
e. Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.
f. Color Selection Samples: 2 by 4 inches. Where samples are specified for selection of color, finish, pattern, or texture, submit the full set of available choices for the material or product specified. Sizes and quantities of samples are to represent their respective standard unit.
g. Sample Panel: 4 by 4 feet.
h. Sample Installation: 100 square feet.
Samples Showing Range of Variation: Where variations in color, finish, pattern, or texture are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.
Mark each unit to describe its relation to the range of the variation.
Reusable Samples: Incorporate returned samples into work only if so specified or indicated.
Incorporated samples are to be in undamaged condition at time of use.
Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final clean up of project.
When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
1.6.6 Format of SD-05 Design Data and SD-07 Certificates
Provide design data and certificates on 8 1/2 by 11 inches paper. Provide a bound volume for submittals containing numerous pages.
1.6.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Provide reports on 8 1/2 by 11 inches paper in a complete bound volume.
Indicate by prominent notation, each report in the submittal. Indicate specification number and paragraph number to which it pertains.
1.6.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.
1.6.9 Source Drawings for Shop Drawings
The entire set of Source Drawing files (DWG) will not be provided to the Contractor. Only those requested by the Contractor to prepare shop drawings may be provided. Request the specific Drawing Number only for the preparation of Shop Drawings. These drawings may only be provided after award.
1.6.10.1 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic Source Drawing files are not construction documents. Differences may exist between the Source Drawing files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic Source Drawing files, nor does it make representation to the compatibility of these files with the Contractor hardware or software.