SP4701-24-Q-0099.pdf
PDF 517 KB Posted
- Attached to
- AED Maintenance and Testing Federal contract opportunity
- Solicitation number
- SP4701-24-Q-0099
- Issued by
- Defense Logistics Agency
About this file
This document is a Solicitation for a federal contract to provide AED (Automated External Defibrillator) preventive maintenance and testing services at the Naval Support Activity in Philadelphia, Pennsylvania. The Defense Logistics Agency (DLA) is the requiring agency.
The key details are:
- The contractor shall provide all personnel, equipment, tools, materials, and labor necessary to perform periodic maintenance, testing, and repairs on 27 Lifepak Defibrillators at various DLA facilities.
- The base period of performance is 12 months from date of award, with two 12-month option periods.
- Offers are due by April 30, 2024 at 5:00 PM EST. Award will be made on a lowest-priced, technically-acceptable basis.
- The government will provide oversight and quality assurance through 100% inspection of the contractor's work.
- Contractor personnel must be certified by the American Heart Association in AED procedures and the contractor must provide an AED management package, replacement batteries, pads, and other supplies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 AED maintanance signed v2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE 17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 3/2005)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITON IS
UNRESTRICTED OR
NAICS:
SIZE STANDARD:
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS
EMERGING SMALL
BUSINESS
8(A)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
SP4701-24-Q-0099 03/28/2024
Helena Tuzi 215-737-2758 4/30/24@5:00PM
SP4701
DLA Contracting Services Office Philadelphia - DCSO-P 700 Robbins Ave.
Philadelphia, PA 19111
Net 30 Days
See Block 9
Section 1: Schedule of Services
CLIN Description QTY Unit of Issue Unit Price Total Price Base Period (12 Months from Date of Award)
0001 AED Preventitive Maintenance Service
1 UN
Option Period 1 (TBD) 1001 AED Preventitive
Maintenance Service
1 UN
Option Period 2 (TBD) 2001 AED Preventitive
Maintenance Service
1 UN
Total Contract Value
TOTAL OFFERED PRICE (BASE +
OPTION PERIODS):
Orders for various quantities will be issued throughout the year as needed. The estimated maximum quantity per item are listed below.
Section 2: PERFORMANCE WORK STATEMENT
1.1 General Information
The contractor Shall provide all personnel, equipment, tools, materials (see*below), supervision, and services necessary to perform periodic maintenance and repairs (interim service) as defined by the manufacturer for those items specified as government furnished property listed below in Appendix 1.
1.2 BACKGROUND
DLA is a combat support agency in the Department of Defense. DLA provides supplies to the military services and supports their acquisition of weapons, fuel, repair parts, and other materials. DLA Troop support and other DLA activities are tenants at the Naval Support Activity Philadelphia. DLA currently resides in areas within six separate buildings on the property.
1.2 OBJECTIVES
The Contractor shall provide all personnel, transportation, equipment, tools, materials, and labor necessary to ensure that services are performed at NSA Philadelphia, techniques in accordance with these contract requirements. to provide emergency first aid to Defense Logistics Agency employees. Only individuals specifically and formally certified by the American Heart Association in Automated External Defibrillator (AED) procedures, anyone is permitted to use a public access AED in the event of an emergency.
1.3 TASKS
The contractor shall provide all equipment, supplies, management, supervision, personnel, and transportation necessary to assure that all services are in accordance with the contract and all applicable laws and regulations. The contractor shall ensure all work meets performance standards specified in this Statement of Work (SOW) and referenced documents.
1.4A The contractor shall provide cleaning, disinfection, and maintenance of 27 Lifepak Defibrillators. See attached inventory for a listing of the Lifepak Defibrillators.
1.4B The Contractor shall perform the following tasks:
Maintenance and Testing Schedule:
A. Lifepak Defibrillator check list
1) Check readiness display for: WRENCH symbol.
Battery level
2) Check Use By date on Electrode
3) Check Spare battery
4) Check additional supplies
5) Check Defibrillator for: Damage or cracks Foreign substances
F. Change the Lifepak Defibrillator service date.
G. Check the function (electrical and mechanical) of the Lifepak Defibrillator.
1.5 Equipment failure is not included in this SOW.
2.0 The Contractor shall be a duly licensed and trained AED Service technician. Please include a copy of the Contractor’s license with the quote.
3 Specific Tasks
4 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE
4.1 Government Quality Assurance Surveillance (QASP). In fulfillment of this effort, the Contractor shall provide the deliverables identified in Table 1.in section 2.4.4.12. All deliverables shall be submitted to the Contracting Officer’s Representative (COR) unless otherwise agreed upon. The Government will have a maximum of ten (10) working days from the day the draft deliverable is received to review the document, provide comments back to the Contractor, approve or disapprove the deliverables. The Contractor will have a maximum of ten
(10) working days from the day comments are received to incorporate all changes and submit the final deliverable to the Government. All days identified below are intended to be calendar days unless otherwise specified.
Final inspection and acceptance of all work performed, reports and other deliverables will be performed at the place of delivery by the COR. The format for the individual deliverables will be determined through consultation between the COR and the Contractor. Products that reflect the Contractor’s analysis and opinion (e.g., studies or analyses) may be in Contractor format. All documents will be provided in either hard copy or electronically as requested by the COR.
Electronic documents will be provided in the appropriate Microsoft Office format (e.g., Word or PowerPoint). If appropriate, the Government may ask that they be provided in compressed or PDF format.
4.2 Government Quality Assurance. Contractor performance will be surveyed to determine if it meets the contract standards. A variety of surveillance methods may be used.
• Random sampling of recurring service output.
• One hundred percent (100%) inspection of the output.
• Periodic surveillance of the processes or output. Surveillance of output items (daily, weekly, monthly, quarterly, semiannually, or annually) as determined necessary to assure a sufficient evaluation of contractor performance.
4.3 Performance Evaluation Meetings. The Contracting Officer may require the contract manager to meet with the contracting officer, contract administrator, QAE, and other government personnel as deemed necessary. The contractor may request a meeting with the contracting officer when the contractor believes such a meeting is necessary. Written minutes of any such meetings shall be recorded in the contract file and signed by the contract manager and the contracting officer or contract administrator. If the contractor does not concur with any portion of the minutes, such non-concurrence shall be provided in writing to the contracting officer within 10 calendar days following receipt of the minutes.
4.4 Monthly Performance Reports.
4.5 Performance Measurements. Progress will be tracked based on scheduled services and service calls. Performance evaluation will be based on the completion of the task.
4.6 Performance Requirements Summary. The tasks the Contractor shall perform are defined in Section.
4.7 Method of Surveillance. The Government will ensure quality assurance of all tasks with 100% inspections performed by the Contracting Officer’s Representative (COR). During the inspections, the COR will review for current task completion. More information about the method of surveillance can be found in Table 2 in section 5.13.
4.8 Inspection and Acceptance Criteria. Final inspection and acceptance of all work performed, reports and other deliverables will be certified by the COR.
4.9 Surveillance Schedule. Specific surveillance schedules for tasks can be found in Table 2 in section.
The surveillance staff has two components:
1) Contracting Officer: The primary function of the Contracting Officer, regarding the surveillance activity, is to authorize changes to the PWS. The Contracting Officer is responsible for ensuring the completion of all work in accordance with the PWS, and the QASP provides a means to accomplish this. The Contracting Officer will rely on the COR to provide information and recommendations.
2) COR: The COR’s responsibility is to monitor and inspect, report, and make recommendations to the Contracting Officer regarding the quality of the Contractor work performed or not performed.
4.10 General Acceptance Criteria. General quality measures, as set forth below, will be applied to each work product received from the Contractor under this Performance Work Statement.
• Accuracy -Work Products shall be accurate in presentation, technical content, and adherence to accepted elements of style.
• Clarity -Work Products shall be clear and concise. Any/all diagrams shall be easy to understand and be relevant to the supporting narrative.
• Consistency to Requirements -All work products must satisfy the requirements of this Performance Work Statement.
• File Editing -All text and diagrammatic files shall be editable by the Government.
• Format -Work Products shall be submitted in hard copy (where applicable) and in media mutually agreed upon prior to submission. Hard copy formats shall follow any specified Directives or Manuals.
Timeliness -Work Products shall be submitted on or before the due date specified in this Performance Work Statement or submitted in accordance with a later scheduled date determined by the Government.
4.11 Performance Standard/Acceptable Quality Level. The Contractor is expected to meet the following goals.
1) Performance standard is a goal of 100% satisfactorily completing the tasking and meeting timeliness for each project tasking as set forth in 4.1, 4.2 and 4.3.
2) Acceptable quality level is 90% of all tasking/deliverables prepared contain only minor defects or rewrites and 90% are processed within the agreed upon timeframe or milestone(s).
3) No major complaints from customer(s).
4.12 Performance Evaluation and Payments.
Below are the Performance Standards that will be used in evaluating performance on a Monthly basis.
Overall Performance Rating
Satisfactory– Performance meets or exceeds contractual requirements. The contractual performance reflects some minor problem(s) for which corrective actions taken by the contractor appear or were satisfactory. The COR recommends and the Contracting Officer will decide to pay the contractor 100% of the invoice amount.
Fair – Performance does not meet some contractual requirements. The contractual performance reflects a minor problem(s) for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. The minor problems with performance problem(s) do not adversely impact the mission of the Agency.
The COR recommends and the contracting officer will decide to pay the contractor 90% of the invoice amount.
Marginal– Performance does not meet some contract requirements. The contractual performance reflects a serious problem(s) for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. The COR recommends and the Contracting Officer will make a determination to pay the contractor 80% of the invoice amount.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely to be in a timely manner. Possible issues include, but are not limited to missed milestone, low quality documents requiring mu. The contractual performance contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. Payment will be withheld pending resolution of cure notice(s). Termination for default or cause may result.
Timeliness
Satisfactory
Meets or exceeds contract requirements in terms of timeliness of delivery.
The timeliness of contractual performance reflects some minor problem(s) for which corrective actions taken by the contractor appear or were satisfactory. The COR recommends and the contracting officer will decide to pay the contractor 100% of the invoice amount.
Fair Does not meet some contractual requirements in term of timeliness of delivery. The timeliness of contractual performance reflects a minor timeliness problem(s) for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. The minor timeliness problem(s) do not adversely impact the mission of the Agency
Marginal
Does not meet some contractual requirements in term of timeliness of delivery The timeliness of contractual performance reflects a serious problem(s) for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented
Unacceptable
Does not meet most contractual requirements in terms of timeliness of delivery and recovery is not likely in a timely manner. The timeliness of contractual performance contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Quality
Satisfactory
Meets or exceeds contract requirements in terms of quality of work performed. The quality of work or contractual performance reflects some minor problem(s) for which corrective actions taken by the contractor appear or were satisfactory.
Fair Does not meet some contractual requirements in terms of quality of work performed. The quality of contractual performance reflects a minor quality problem(s) for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. The minor quality problem(s) do not adversely impact the mission of the Agency
Marginal
Does not meet some contractual requirements in terms of quality The quality of contractual performance reflects a serious problem(s) for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented
Unacceptable
Does not meet most contractual requirements in terms of quality and recovery is not likely in a timely manner. The quality of contractual performance contains a serious problem(s) because the contractor’s corrective actions appear or were ineffective. .
Disincentives are applied for ratings of “Fair”, “Marginal”. And “Unsatisfactory” as follows:
Satisfactory + 100% payment Fair + - 10% disincentive Marginal + -20% disincentive Unsatisfactory= Payment will be withheld pending resolution of cure notice(s).
Termination for default or cause may result.
4.13 Deliverables & Performance Requirement Summary Tables. The tables below identify the deliverables resulting from the tasks defined in Section 4. Specific Tasks.
TABLE 1. DELIVERABLES
Table 1 identifies Deliverables associated with Section 4. – Specific Tasks.
PWS Para# Task Title
Quantity:
No. of Reports Annually Deliverable Service Due
3.1. 2 Three days upon completion of work
Thru 3.4 3.5 Thru
3.6 2 Five days upon completion of work
3.7 12 Monthly report due five days after completion of work.
4.4 Monthly Performance Report 1 report
within the 10th of each 6-month
4.5 6 reports Within the 5th day of each 6- month with invoice
5.2 Transition Plan 1 report Within 5 days of contract award
11.6 Final Result Briefing 1 report 10 days prior to contract expiration
TABLE 2: PERFORMANCE REQUIREMENT
PWS Para# Task Title Standard Acceptable Surveillance Incentive
3.1
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in section.
3.2.5
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in section.
3.6
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in section.
3.7
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in section.
4.4
Monthly Performance Report
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in section.
4.5
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in section.
5.1 Quality Control Plan
100% Satisfactory Complete 90%
100% COR
Inspection
Good, Fair, Poor, Unacceptable Rating in
5.2 Transition Plan
100% Satisfactory Complete 90%
100% Satisfactory Complete
Good, Fair, Poor, Unacceptable Rating in section.
11.6 Final Result Briefing
100% Satisfactory Complete 90%
100% Satisfactory Complete
Good, Fair, Poor, Unacceptable Rating in
5 CONTRACTOR QUALITY CONTROL
5.1 Contractor Quality Control Plan (QCP). The Contractor shall submit a Quality Control Plan within 10 business days of the contract award. This plan shall describe the Contractor’s methodology for compliance with the Deliverable and Performance Requirement Summary above. The COR will notify the Contractor of concurrence or required modifications to the QCP within 10 business days of receipt. The Contractor shall make appropriate modifications within 5 days of the COR’s notification and provide a revised QCP within 5 business days. The plan shall include as a minimum:
• A description of the inspection system to cover all services listed on the performance requirements summary (PRS). The description shall include specifics as to the areas to be inspected on scheduled and unscheduled basis, frequency of inspections, submission of monthly quality control inspections (submission of a quality control schedule), the title and organizational placement of the inspectors, and procedures for contacting the inspector(s). Additionally, control procedures for any government provided keys or lock combinations shall be included.
• A description of the records to be kept to document inspections and corrective or preventive actions taken.
5.2 Transition Plan. The contractor shall develop and submit a Transition Plan to enable the contractor to be fully operational on the contract start date. This Transition Plan will be submitted to the Contracting Officer within 5 days from the contract award date. The transition plan shall include a proposed schedule for each scheduled service and a proposed inventory of supplies to be used. The contractor shall conduct an orderly transition from Government operation to full contractor performance and be fully operational on the contract start date.
6 GOVERNMENT FURNISHED PROPERTY
6.1 Government-Furnished Equipment. The government will not provide any equipment. The Contractor is responsible for providing his own equipment.
6.2 Government-Furnished Material. None
7 CONTRACTOR-FURNISHED ITEMS:
A) AED Program Management and Medical Direction Package EA 27
B) Battery Lifepak 1000 EA 27
C) 1000 Replacement Pads EA 27
D) AED Inspection Tag (5-Pack) PG 10
E) AED Management Monitoring EA 2
7.1 Contractor-Furnished Equipment. The Contractor shall furnish all equipment required to perform this contract
7.2 Contractor-Furnished Communications. The operation of a business telephone shall be.
Always maintained. This telephone number shall be given to the Contracting Officer, COR, QAE and service call desk at the pre-performance conference after the start of the contract.
7.3 Contractor-Furnished Vehicles. All vehicles used in the performance of this contract shall be in operable condition and meet the local, state, and federal environmental and safety requirements. The contractor shall provide and maintain contractor-owned or leased vehicles to provide transportation to meet the requirements of this contract. Any contractor vehicles used in the performance of this contract shall have the company name prominently displayed on both sides of the vehicle and be maintained clean to present a neat, professional appearance. Vehicles found to be unsafe and unable to function as designed, shall be removed from the installation, and replaced at contractor expense. Vehicular repairs shall not be done on installation. The contracting officer representative may inspect the contractor's vehicles at any time and direct the removal of any unsafe or objectionable vehicle from the installation. UNDER NO
CIRCUMSTANCES WILL THE CONTRACTOR PARK OR STORE VEHICLES OR
EQUIPMENT CONTAINS SOLVENTS ON BASE OTHER THAN NORMAL WORK
HOURS.
• All vehicles shall be registered, licensed, insured, and operated in accordance with base traffic regulations by a licensed driver.
• A copy of product label and SDS should be available in the vehicle
7.4 Contractor-Furnished Equipment and Tools. All equipment used in the performance of this Contract shall be operable condition and meet the local, state, and federal environmental and safety Requirements. The contractor will submit a description of each item of equipment to be used to the Contracting Officer for approval within 10 days after contract award. The contractor's equipment shall be of commercial quality, size, and type suitable for accomplishing the various phases of work specified. The contractor's equipment shall be in good repair and able to operate efficiently and safely. Equipment shall be maintained clean to present a neat, professional appearance. The contracting officer may inspect the contractor's equipment and/or tools at any time and direct the removal of any improper, or unsafe equipment/tools. These items shall be removed from the job by the contractor and replaced with satisfactory equipment.
9 ENVIRONMENTAL CONTROLS
9.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, permits, DOD regulations, and requirements regarding environmental protection. The contractor shall also be knowledgeable of and comply with DLAI 4150.07 and DODI 4150.07.
9.2 Notification of Environment Spills. If the contractor spills or releases any substance listed in 40 CFR 302 into the environment, the contractor shall immediately report the incident to the Quality Assurance Evaluator (QAE). The contractor shall be liable for containment and environmental clean-up of the spill or release of such substances.
9.3 Material Mixing Storage and Use. The contractor shall follow manufacturer's guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.
9.4 Communication. The contractor is responsible for advising his employees of all Environmental and Hazardous Materials Handling and is also required to have and maintain Safety Data Sheets (SDS) on all materials that are required by State and Federal Laws and/or Regulations. (Reference OSHA requirements).
10 CONTRACTOR PERSONNEL.
10.1 Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of work. The name of the designated person and an alternate who shall act for the contractor when the manager is absent, shall be designated in writing to the contracting officer within one working day of the contract award.
• The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.
• The contract manager or alternate shall be available during normal duty hours within one hour to meet on the installation with government personnel (designated by the contracting officer) to discuss problem areas. After normal duty hours, the manager or alternate shall be available within three hours, 24 hours a day, and seven days a week.
• The contract manager and alternate must be able to read, write, speak, and understand English.
10.2 Contractor Employees.
• The contractor shall insure all employees have adequate knowledge of the proper procedures for using chemicals, tools, and equipment necessary to complete assigned tasks.
• The contractor shall not employ any person for work on this contract if such employee is identified to the contractor by the contracting officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
• Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Contractor personnel must wear uniforms which display the company’s name.
• The contractor shall ensure employees have a current and valid driver's license before allowing the employee to operate a contractor-owned vehicle on NSA Philadelphia.
• The contractor shall not employ any person who is an employee of the US Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Defense Logistics Agency (DLA), either military or civilian, unless such person seeks and receives approval according to the appropriate ethics regulations.
• The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor's ability to perform, however; their absence at any time shall not constitute an excuse for nonperformance under this contract.
• Contractor Personnel Roster. The contractor shall provide a roster of contractor personnel, employed under this contract, to the contracting officer, Security Police, and the Quality Assurance Evaluator (QAE) not later than the contract start date. This roster shall show employee names, social security number (SSN), position title, security clearance (if applicable), and Pennsylvania license. The roster shall also show telephone numbers of the contract manager and/or alternate(s). Subsequent changes to these rosters shall be forwarded to the contracting officer, Security Police and QAE not later than the 5th day of each month if there were any changes the previous month. Contractor may include "Privacy Act" statement on roster.
• The management and control of contractor employees in the performance of this contract shall be the responsibility and prerogative of the contractor; however, the contractor shall comply with the contract requirements and DLA regulations concerning conduct of employees.
10.3 Employee Training. The contractor shall ensure employees are qualified to operate equipment before assigning employees to tasks that require use of the equipment. The contractor shall maintain records of everyone’s training and state certifications/licenses. The contractor shall provide environmental, health, and safety training to ensure compliance with all federal, state, and local laws or regulations.
11 OTHER PERFORMANCE REQUIREMENT
11.1 Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in Section 6.1, Applicable Publications and Forms. If requested by the government, the contractor shall provide the original record or a reproducible copy of any such record within five (5) working days of receipt of the request
11.2 Data Collections. The contractor shall be responsible for the collection and recording of the data of quantity AEDs used on base regardless of the user on base.
11.3 Safety Data Sheets (SDS). Safety Data Sheets are required to be submitted for all Four (4) copies of the SDS and of the label must be provided to the COR, (one copy each for the COR, QAE, Safety Office, and NSA Health Clinic). Copies of the SDS and labels must be provided to the COR at least 72 hours prior to expected use as their review is required prior to the approval for use.
11.4 Inspections. The records of inspections shall be kept and made available to the government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
11.5 Applicable Publication and Forms. Publications (to include their supplements at any Organizational level) and forms that apply to this PWS are listed below. The publications and forms have been coded as mandatory or advisory. The contractor is obligated to follow those publications and use those forms coded as mandatory to the extent specified in other sections of this PWS. The contractor shall be guided by those publications or use those forms coded advisory to the extent necessary to accomplish requirements in this PWS. All publications and forms listed shall be provided by the government at the start of the contract. It is the responsibility of the contractor to establish follow-on requirements with the publication’s distribution office. Supplements or amendments to listed publications from any organizational level may be issued during the life of the contract. The contractor shall immediately implement those changes that result in a decrease or no changes in the contract price and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in the contract price, the contractor shall submit to the contracting officer a price proposal within 30 calendar days following receipt of the change by the contractor. The contracting officer and the contractor shall negotiate the change to the contract under the provisions of the contract clause entitled "Changes". Failure of the contractor to submit a price proposal within 30 calendar days following receipt of the change entitles the government to performance according to such change at no increase in contract price (unless the time requirement is waived by the contracting officer according to paragraph c of the changes clause).
11.6 Final Result Briefing. Vendor will prepare a final result briefing for all tasks under this.
Order. The briefing will be presented to the COR 10 calendar days prior to final contract conclusion.
Performance of this effort may require the vendor to access and use data and information proprietary to a government agency or Government vendor which is of such a nature that its dissemination or use, other than in performance of this effort, would be adverse to the interests of the Government and/or others.
12 HOURS OF OPERATION
12.1 Normal Hours of Operation. The contractor shall perform services required under this contract during the normal operating hours of the government activity occupying the facility where the services are to be performed. Normal operating hours on NSA Philadelphia are 0600 to 1800 weekdays
12.2 Federal Holidays. The vendor is not required to provide services on the ten Federal holidays.
Observed NSA Philadelphia unless approved by the COR. The following holidays are observed:
• New Year's Day (January I)
• Martin Luther King's Birthday (Third Monday in January)
• President' Day (Third Monday in February) Memorial Day (last Monday in May) Juneteenth (June 19th)
• Independence Day (July 4th)
• Labor Day (first Monday in September)
• Columbus Day (Second Monday in October)
• Veteran's Day (November 11)
• Thanksgiving Day (Fourth Thursday in November)
• Christmas Day (December 25th)
When one of the above holidays falls on Sunday, the following Monday will be observed as a legal holiday. When the federal holiday falls on a Saturday, the preceding Friday is observed as the holiday.
12.3 Emergency Service Calls. On occasion, the contractor may be required to support AED control services outside the normal duty hours. The contractor shall be responsible for service calls support as are described in Section 4.3 Specific AED.
13 INVOICING AND PAYMENT SCHEDULE
The vendor shall invoice 6-MONTH. The Contractor invoice shall include Contractor name, invoice number, date, Contract Number, CLIN number, document number, and cost of payment.
Invoices are to be sent directly to the COR electronically or via fax. After certification of the invoice by the COR, the invoice will be forwarded to the Contracting Officer for approval and submission for payment.
14 POINTS OF CONTACT
CONTRACTING OFFICER REPRESENTATIVE (COR)
The Installation Support at NSA Philadelphia COR point of contact is:
Primary: Mr. Tim Edgil Comm. Phone: (215) 737-2232.
Email: timothy.edgil@dla.mil NSA Installation Support at Philadelphia
700 Robbins Street, Building 36 Philadelphia, Pennsylvania 19111
CONTRACTING SPECIALIST
Primary: Mr. Jonathan Gallagher Comm. Phone: (215) 737-7120 Email: Jonathan.gallagher@dla.mil DLA Contracting Services Office (Philadelphia) 700 Robbins Street Philadelphia, Pennsylvania 19111
CONTRACTING OFFICER
Primary: Mrs. Helena G. Tuzi Comm. Phone: (215) 737- 2758 Email: helena.tuzi@dla.mil DLA Contracting Services Office (Philadelphia) 700 Robbins Street Philadelphia, Pennsylvania 19111
2.4.15 DEFINITIONS
Call Back. A request for corrective work following a previous work request that has not provided the required results for a designated period. Callbacks shall be performed at no cost to the Government. Callbacks shall be scheduled and included on submitted daily schedules, and work request data shall be completed and submitted to the Government the next normal working day after the callback is completed. Callback work is also called re-performance. Repeated calls are possible.
Job Order: A written request, issued by the QAE, which will accomplish special AED control tasks. The contractor shall date and initial the Job Order upon receipt. The contractor shall notify the QAE of completion within one workday.
Lot: The total number of potential service inputs in a surveillance period.
Monitoring: Thorough inspections or surveys conducted on a regular basis to determine the presence of cleanliness.
Notification/Identification: The contracting officer, contract administrator, or QAE may on occasion verbally or on a job order identify or notify the contractor to perform tasks or standards outlined in the PWS.
Performance Requirement: The point that divides acceptable and unacceptable performance to tasks that is in according to the performance requirement summary and the Inspection of Services clause. It is the number or percentage of defects that is deemed acceptable. Any further defects will require the government to affect the price computation system.
Performance Requirements Summary (PRS): A listing of the service outputs under the contract that are to be evaluated on a regular basis, the surveillance methods to be used for the methods to be used for these outputs, and the performance requirement of the listed outputs.
Quality Assurance: Is a planned and systematic pattern of all actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government.
Quality Assurance Evaluator (QAE): A quality assurance inspector who is a government employee, trained to protect the government’s interest through on-site performance evaluation of commercial AED management contracts.
Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance. The document contains specific methods on how to perform surveillance of the Contractor.
Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.
Random Sampling: A sampling method in which each service output in a lot has an equal chance of
Unacceptable Condition(s): A condition that does not conform to quality standards resulting in a callback.
2.4.16 INSTALLATION SECURITY
CONTRACTOR ACCESS AND USE OF PREMISES
1. Security Requirements Naval Support Activity (NSA) Philadelphia:
a) No employee or representative of the Contractor will be admitted to the work site unless he/she furnishes satisfactory proof that he is a citizen of the United States or an alien who has been lawfully admitted for permanent residence, or who presents evidence from the Immigration and Naturalization Service that employment will not affect his immigration status.
b) Personnel Information: All authorized non-military personnel utilizing the base are required to always have in their possession an installation visitor pass or access control badge. This pass is issued by the NSA Welcome Center, located at the Oxford Ave. gate. The Welcome Center is open Monday through Friday except federal holidays from 6:30 a.m. to 3:00 p.m. In order to obtain a pass/badge, the Contracting Officer or designee will request personal identifiable information (PII) from each contractor and submit it to Security a minimum of 7 working days prior to start of work.
c) Official Capacity: The Contractor shall comply with visitor pass requirements for the performance of work at NSA Philadelphia.
d) The NSA Security Department will run a criminal history check on Contractor employees as a condition of employment. Official proof of identity or naturalization papers may be required, which will be returned once entered the security computer system. Based on the results of the criminal history check, the Vetting Official (VO) will or will not grant entry to the installation based on guidance set forth by the Installation Commander. If entry is denied, the Contractor will be immediately notified. NSA Security may require updating or rechecking criminal history based on the duration of the contract. NOTE: The VO will deny access to any person who the Installation commander has deemed unfit for unaccompanied access.
e) Proof of Identity: Official identification consists of any current Government issued picture identification. Examples- of official identification are valid state issued driver's license, military ID card, military dependent ID card, green card, etc. Expired identification is not valid.
f) Pass or Badge Management: Expired, invalid, inaccurate, inoperative, or terminated
Pass or Access Control Badge shall be returned to the Contracting Officer or his designee for disposition. These cards are the property of the U.S. Government and shall not be retained by the cardholder upon expiration, replacement, or when the DoD affiliation of the employee has been terminated. If the Pass or Access Control Badge is lost or stolen a police report will be completed and a new request will be submitted by the Contracting Officer or designee. Compliance with this requirement is mandatory and certification thereof to the Contracting Officer is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment.
g) Contractor Security Responsibilities: The contractor is responsible for employees and subcontractors under their employment. Contractors will ensure that employees are familiar with and obey installation traffic, safety, and security regulations. Contractor employees, including subcontractors, are required to always wear the ID card conspicuously on their outer clothing and above the waist while working on this Center. Personnel are subject to challenge and removal from the work area if the ID card is not being worn. It is the COR/designee’s responsibility to enforce this requirement. Failure to do so is just cause for ordering that work on a contract be stopped.
h) Unofficial photography, cameras, or photographs are prohibited on NSA property.
When official photographs are required, submit a written approval request containing specific justification and details to the Contracting Officer 5 days prior.
i) Firearms, Weapons, Alcoholic Beverages, Illegal Drugs, and Contraband are prohibited on NSA property. Violators may be prosecuted. State issued/authorized concealed weapons permits are not valid on Federal (NSA) property.
j) Trusted Traveler Program (TTP): Contractors are not authorized to use the TTP to escort individuals on to the installation.
k) NSA is not responsible for job site security. Removal of material from jobsite and
Installation are subject to security checks. The contractor is to notify NSA security of any special measures (watchmen, alarm, etc.), security concerns, security problems, or unusual activities within the job site.
DLA Philadelphia
Installation Support Activity Areas of Operation
BUILDING #3 General office Space for employees
BAY A Oasis Area AED Serial 41271202
BAY B Oasis Area AED Serial 41271203
BAY C Oasis Area AED Serial 41271206
BAY D Oasis Area AED Serial 42171209
BUILDING #4 General office Space for employees
Front Office AED Serial 41271263
Shop Area AED Serial 41271272
BUILDING #5 General office Space for employees
BAY C Oasis AED Serial 41271304
BAY D Oasis AED Serial 41271310
BUILDING #6 General office Space for employees
BAY A AED Serial 41271315
BAY B AED Serial 41271358
BAY C AED Serial 41271363
BAY D AED Serial 41271365
Auditorium AED Serial 41271366
Building #8 (Gym) AED Serial 42171243
AED Serial 52171253
BUILDING # 26
1st Floor Auditorium AED Serial 41271216
1st Floor Bldr. Mgr. Ofc AED Serial 41271228
2nd Floor South AED Serial 42171232
2nd Floor North AED Serial 41271238
1st Floor Bldg. Mgr. Storeroom AED Serial 41271282
AED Serial 48024927
AED Serial 47898395
BUILDING # 45
1st Floor AED Serial 41271148
1st Floor CCC Room AED Serial 41271149
2nd Floor AED Serial 41271178
3rd Floor AED Serial 41271196
4th Floor AED Serial 43199553
Section 3: Instructions to Contractors and Evaluation of Offers
3.1 OFFER SUBMISSION INSTRUCTIONS
The subject RFQ will be posted on beta.sam.gov. Vendors should submit their offers electronically via the beta.sam web page.
If there is a failure on the sam.gov web page and vendors are unable to post their quotes electronically, with the approval of the Contracting Officer and contract specialist, quotes may also be submitted to the email addresses listed below:
Helena.Tuzi@DLA.mil , Jonathan.Gallagher@DLA.mil
Every single page of the contractor’s offer must be stamped with the following, including the cover page:
For Official Use Only Source Selection Information -- See FAR 2.101 and 3.104
3.2 SUBMISSION OF QUESTIONS
Should contractors have any questions with respect to this RFQ, they should submit them, via email, to Helena.Tuzi@DLA.mil and Jonathan.Gallagher@DLA.mil.
Any technical questions, requests for clarification or requests for data in connection with this RFQ must be submitted in writing on or before April 5, 2024 at 3:00 PM Eastern Time to allow DLA adequate time to provide correct answers to the questions submitted and to prevent any delays in the closing date of the RFQ. The Contractor is strongly urged to follow-up the submission of any questions with a phone call to the Contracting Officer to ensure that questions have been received.
All offers must be received on or before Tuesday, April 30, 2024 at 5:00PM EST.
3.3 508 Compliance Requirements In accordance with L29 Section 508 Requirements JUL 2019, offerors shall comply with the Section 508 accessibility requirements. By submission of its offer, the offeror affirms that its Electronic Information Technology (EIT) supplies and services are accessible as outlined in the law, the standard, and FAR Subpart 39.2. Offerors shall complete Attachment Z - Voluntary Product Accessible Template (VPAT) Version 2.3 document in the solicitation. If applicable, offerors shall indicate where their Section 508 EIT compliance information is available for review (e.g. offeror’s website or other location the contracting officer can access). The contracting officer may require a demonstration of Section 508 compliance prior to award.
3.4 BASIS FOR AWARD
This task order is being issued as unrestricted.
Award shall be made to a responsible, eligible vendor whose quotation represents the lowest priced, technically acceptable offer based upon the total price for all items contained within this solicitation and the corresponding Performance Work Statement (PWS). Only those proposals found to be technically acceptable will be further evaluated for award. Technical acceptability requires being acceptable for all non-price factors and meeting all requirements of the PWS. Any offer that takes exception to the terms and conditions of this solicitation may be determined to be technically unacceptable for this requirement.
Price will be evaluated on a Lowest Price Technically Acceptable basis. Pricing will be evaluated to determine that all pricing is fair and reasonable. The total evaluated price will be determined by summing the total proposed price of the CLIN 0001, CLIN 1001 & CLIN 2001. In addition, the evaluation will include an analysis of the offeror’s assumptions to determine the impacts of those assumptions.
The contractor shall complete the Schedule of Supplies CLIN structure in Section 1 and also provide broken out unit pricing per the locations listed in the last pages of the PWS.
Section 4: Additional Clauses
The following clauses are incorporated into this Task Order:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF.
Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
_________________2in1___________________________________________
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC: SL4701
Issue By DoDAAC: SP4701
Admin DoDAAC**: SP4701
Inspect By DoDAAC
Ship To Code
Ship From Code
Mark For Code
Service Approver (DoDAAC): TBD
Service Acceptor (DoDAAC): TBD
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(*Contracting Officer: Insert applicable DoDAAC information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .