Attachment 6. COSR.pdf
PDF 2 MB Posted
- Attached to
- DDAG Crane Maintenance Federal contract opportunity
- Solicitation number
- SP330026Q0010
- Issued by
- Defense Logistics Agency Distribution
About this file
This appears to be an Adobe Reader placeholder page indicating a problem loading the PDF document. The page contains standard troubleshooting instructions for PDF viewing, including links to download the latest version of Adobe Reader for Windows, Mac, or Linux. There are no substantive contract or solicitation details present in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1. PWS - Updated.pdf | ||
| Amendment 0005.pdf | ||
| Attachment 10 - TE 1.1 Contractor Personnel Security.pdf | ||
| Attachment 11 - TE 1.2 CAC_Procedures.pdf | ||
| Amendment 0004.pdf | ||
| Attachment 9 - Site Visit DLA Form 1818.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Attachment 8. QASP.pdf | ||
| Attachment 7. CAP.pdf | ||
| Attachment 5. POC List.pdf | ||
| Amendment 0001.pdf | ||
| CSS.pdf | ||
| Attachment 2. DoL Wage Determination No. 2015-4667 Rev No. 32.pdf | ||
| Attachment 4. Past Performance Questionnaire.pdf | ||
| Attachment 3. PM Task List.xlsx | XLSX spreadsheet | |
| Attachment 1. PWS.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Contract Oversight Surveillance Report
1. Contract # / Service
2. Contract Location
3. Contract Performance Period
4. Evaluation Period
5. Contract Service Provider
6. Method(s) of Surveillance (check all that apply for this surveillance period) Requirement Surveillance Comments
Surveillance Methods Described -
- Direct Observation is the visual examination of processes and procedures by an evaluator who is physically present and watching individuals actually performing the work to determine whether the processes conform to the requirements.
- Random Sampling is correctly performed by selecting a statistically significant number of samples from a lot where all members of the lot have the same chance of being selected. Random Sampling is used to reduce the time and effort of validating conformance to requirements when a definable lot of significant size exists.
- 100% Inspection method evaluates all outputs of a particular requirement. Every item in a lot is evaluated for all or some of the characteristics in the specification. (Recommend if Lot Size is 25 or less)
- Validated Customer Complaints are customer complaints that prove to be valid upon subsequent investigation. They can be used as a trigger for conducting surveillances, and are included as a part of the surveillance report. When a valid complaint is received and included in a surveillance activity, strongly consider scheduling targeted follow up surveillance to ensure the problem has been corrected. These can prompt corrective actions, preventative action plans, and performance improvement plans.
7. Overall Surveillance Evaluation
8. Additional Comments / Notes to the Contracting Officer (Either positive or negative)
9. COR/TPOC Certification - I certify that the supplies or services provided by the Service Provider under the terms and conditions of this contract, have been received and accepted unless otherwise noted on this surveillance report.
Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments 10.0.2.20120224.1.869952.867557
| TextField1: SP3300-XX-D-XXXX / SP3300-XX-F-XXXX |
| TextField4: DEFENSE LOGISTICS AGENCY (DLA) DISTRIBUTION ALBANY, GEORGIA |
| TextField2: |
| DateField1: |
| DateField2: |
| TextField3: |
| DirectObservation: 0 |
| RandomSampling: 0 |
| Inspection: 0 |
| Complaint: 0 |
| Other: 0 |
| Other_Field: |
| Requirement: 1. Did the Contractor ensure employees had safety education when engaged in activities involving Government facilities, personnel, or equipment, in accordance with Section 1.7 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 2. Did the Contractor Contractor provide a Material Safety Data Sheet (MSDS) to the COR prior to bringing the chemicals to the worksite, in accordance with Section 1.7 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 3. Did the Contractor obtain specific approval from the COR prior to crane relocating, in accordance with Section 1.8 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 4. Did the Contractor establish and maintain a complete Commercial Quality Control Plan to ensure the requirements of the contract are provided as specified, in accordance with Section 1.9 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 5. Did the Contractor maintain records of all inspections conducted by the Contractor and any necessary corrective action taken, in accordance with Section 1.9 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
Requirement: 6. Did the COR advise the contract manager in person when discrepancies occurred and request a corrective action, in accordance with Section 1.10 in the J.1 Performance Work Statement and/or applicable SOP/guidance?
Requirement: 7. Did the Contractor notify the COR at least 72 hours before the preventative maintenance services start to allow the COR to accept or reject based on mission critical operations at the time, in accordance with Section 4.1 in the J.1 Performance Work Statement and/or applicable SOP/guidance?
| Requirement: 8. Did the Contractor provide maintenance service documents for all Preventative Maintenance services within 5 days after completion of scheduled service, unless otherwise approved by the COR, in accordance with Section 4.1 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 9. Did the Contractor complete corrective maintenance services within 96 hours after notification by the COR, unless otherwise approved by the COR, in accordance with Section 4.1 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 10. Did the Contractor provide a cost estimate when major repairs exceed $2500.00 (dollars), and did the Contractor only begin repairs after approval by the COR, in accordance with Section 4.2 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 11. Did the Contractor provide onsite crane rental support services to include a crane operator when notified by the COR, in accordance with Section 4.3 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 12. Did the Contractor maintain overall responsibility for the rental crane (such as performing preventative maintenance services, or repairs necessitated by normal wear and tear) during the rental period, n accordance with Section 4.3 in the J.1 Performance Work Statement and/or applicable SOP/guidance? |
| Requirement: 13. If any Unscheduled Inspections were identified by the Quality Team during this surveillance period, please document the findings below. |
| Requirement: |
| Requirement: |
| Requirement: |
Requirement:
| SurveillanceComments: |
| SurveillanceComments: 1 |
| SurveillanceComments: |
| SurveillanceComments: |
| Conforming: |
| Nonconforming: |
| Outstanding: 0 |
| VeryGood: 0 |
| TextField5: |
| SignatureField1: |
| SignatureField2: |
File details come from the government source that posted it. Updated .