Tab_C-6_Attachment_01_Schedule_of_Supplies.pdf
PDF 261 KB Posted
- Attached to
- Small Parcel Sorter and Conveyor Project. Federal contract opportunity
- Solicitation number
- SP330017R5007
- Issued by
- Defense Logistics Agency Distribution
About this file
Attachment 01 Schedule of Supplies
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006.pdf | ||
| Tab_C-6_Attachment_03_Drawing_and_Photos_.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Tab_C-6_Attachment_02_Statement_of_Work.pdf | ||
| Amendment_0003.pdf | ||
| Tab_C-6_Attachment_12_SPS-2.dwg | DWG drawing | |
| Tab_C-6_Attachment_11_SPS-1.dwg | DWG drawing | |
| Amendment_0002.pdf | ||
| Tab_C-6_Attachment_03_Drawing_and_Photos_.pdf | ||
| Tab_C-6_Attachment_09_Subcontracting_Plan_Template.pdf | ||
| Tab_C-6_Attachment_05_Contract_Data_Requirements_List.pdf | ||
| Tab_C-6_Attachment_04_Site_Map.pdf | ||
| Tab_C-6_Attachment_08_Past_Performance_Questionnaire_.pdf | ||
| Tab_C-6_Attachment_06_Data_Item_Description_.pdf | ||
| Tab_C-6_Attachment_07_Liquidated_Damages.xlsx | XLSX spreadsheet | |
| Tab_C-6_Attachment_02_Statement_of_Work.pdf | ||
| Tab_C-6_Attachment_10_SB_Participation_Plan_Template.pdf | ||
| Solicitation.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Small Parcel Shipping System, Bldg 56-4
Item Units Qty Unit Cost Total Cost Package Belt Conveyor LF 192 Belt Driven Live Roller Package Conveyor
LF 327
Package Accumulation Conveyor
LF 865
90 Degree Conveyor Curves
(BDLR)
EA 6
Powered Roller Diverts EA 14 Package Elevators EA 6 Extendible Conveyors EA 3 Overhead Bar-Code Scanner EA 3 Catwalk SF 221 Catwalk Stairs EA 1 Forklift Guarding LF 200 Controls/Programming EA 1 Video Monitoring System LOT 1 Conveyor Crossover Enclosure EA 1 Disassemble & Remove Existing Conveyor System
LOT 1
Subtotal
G/A ( %)
Contingency ( %)
TOTAL COST
SOURCE SELECTION INFORMATION
SEE FAR 2.101 AND 3.104
Attachment 1 Schedule of Supplies
Please provide any addition non pricing submittal information you would like to have evaluated for trade off purposes below or as additional pages.
UN
Sheet1
File details come from the government source that posted it. Updated .