Attachment_5_Submittal_Reg.pdf

PDF 871 KB Posted

Attached to
Removal and Replace Make Up Air Units for DDJC Federal contract opportunity
Solicitation number
SP3300-16-B-0015
Issued by
Defense Logistics Agency Distribution

About this file

Attachment 5 Submittal Reg

View the file

Other files for this federal contract opportunity

Other files attached to Removal and Replace Make Up Air Units for DDJC, newest first.
File Type Posted
Tab_E-17_Public_Notice_of_Award.pdf PDF
Bid_Results_-_SP330016B0015.pdf PDF
16B0015_SF30_AMENDMENT_0005.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Attachment_12_Site_Visit_List.pdf PDF
Amendment_0002.pdf PDF
16B0015AMDP0001_PG_2.pdf PDF
16B0015AMDP0001_PG_2.pdf PDF
Solicitation.pdf PDF
Attachment_7_Davis_Bacon.pdf PDF
Attachment_11_Standard_Form_1442.pdf PDF
Attachment_2_Site_Map.pdf PDF
Attachment_6_Transmittal_of_Shop_Drawings.pdf PDF
Attachment_9_SF25_(Performance_Bond).pdf PDF
Attachment_3_Drawing_and_Photos.pdf PDF
Attachment_4_Schedule_of_Supplies.pdf PDF
Attachment_1_SoW _Gen_Specs _and_Checklists.pdf PDF
Attachment_10_SF25A_Payment_Bond.pdf PDF
Attachment_8_SF24_-_Bid_Bond.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 01 Special Requirements

FORM 4288

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDJC Remove and Replace Makeup Air Units WHSE28 - Division 1 - General Requirements

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

P A R A G R A P H

N O

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKSSUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

011400 WORK RESTRICTIONS

SD-01 PRECONSTRUCTION SUBMITTALS

Special Access Determination Form 1.4.1.5 G

013201 PROJECT SCHEDULE

SD-01 PRECONSTRUCTION SUBMITTALS

Construction Project Schedule 3.3 G

013300 SUBMITTAL PROCEDURES

SD-01 PRECONSTRUCTION SUBMITTALS

Submittal Register 1.11 G

013529 SAFETY AND OCCUPATIONAL HEALTH REQTS.

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP) 1.2 G Activity Hazard Analysis (AHA) 1.2 G Lead Compliance Plan 1.2 G Crane/Fork Lift plan 1.2 G

SD-06 TEST REPORTS

Accident Reports 1.11.1 G Monthly Exposure Reports 1.11.3 G Crane/Fork Lift Report 1.11.4 G

SD-07 CERTIFICATES

Hot Work Permit 1.12 G

014500 CONTRACTOR QUALITY CONTROL

SD-01 PRECONSTRUCTION SUBMITTALS

Contractor Quality Control Plan 3.2 G

Attachment 5

Source Selection Information See FAR 2.101and 3.104

Division 01 Special Requirements

FORM 4288

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

DDJC Remove and Replace Makeup Air Units WHSE28 - Division 1 - General R i t

CONTRACTOR

A C T I V I T Y

N O

R A N S M I T T

L

S P E

DESCRIPTION OF ITEM SUBMITTED

R A G R A

H

G

V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH

REMARKS

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

T I

D

DATE OF

DATE FWD

TO APPR

AUTH

DATE RCD

CONTR

TO OTHER

REVIEWER

DATE RCD

FROM OTH

T I

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

015719 ENVIRONMENTAL PROTECTION

SD-01 PRECONSTRUCTION SUBMITTALS

Environmental Protection Plan 1.7 G

SD-11 CLOSEOUT SUBMITTALS

017800 PROJECT CLOSEOUT

SD-02 SHOP DRAWINGS

As-Built Drawings 1.2.1 G

SD-03 PRODUCT DATA

As-Built Record of Equipment and Material. 1.2.2 G Warranty Management Plan 1.3.1 G Final Cleaning 1.6 G

SD-11 CLOSEOUT SUBMITTALS

Record Drawings 1.2.1 G Post construction Survey 1.6.1 G

Page 3/7

TITLE AND LOCATION

DDJC Remove and Replace Makeup Air Units WHSE28 - Division 2 - Existing Conditions

T I V I

A N S M I T T

R A G R A

CONTRACTOR SCHEDULE DATES CONTRACTOR

MAILED TO

APPROVAL

MATERIAL

T I

TO APPR

AUTH

DATE RCD

TO OTHER

DATE RCD

FROM OTH

T I

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE RCD

FROM

APPR AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

024100 DEMOLITION

SD-01 PRECONSTRCUTION SUBMITTALS

Preconstruction survey 1.2 G

SD-07 CERTIFICATES

Demolition Plan 1.2 G

Division 02 Existing Conditions

Page 4/7

DDJC Remove and Replace Makeup Air Units WHSE28 - Division 23 - HVAC

T I V I

A N

S M I T T

R

A

G

R

A

CONTRACT

OR

ACTION O

APPROV

AL

NEEDED

BY

MATERI

T I

DATE

OF

ACTIO

FWD

TO

APPR

AUTH

DATE

RCD

FWD TO

OTHER

REVIEW

ER

RCD

FROM

OTH

T I

ACTIO

N

V

CT

L A O S S I A F / I E C A R T E I V O W N R

CONTR/

DATE

FROM

APPR

AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

233423 POWER ROOF VENTILATOR

SD 03 Product Data Housing 1.2 G Fan 1.2 G Motor 1.2 G Bases 1.2 G Roof Cover 1.2 G Dampers 1.2 G Screen 1.2 G Sound Baffles 1.2 G

SD 06 1.2 G

Test reports 1.2 G

Division 23 Heating Ventilation and Air Conditioning

Page 5/7

DDJC Remove and Replace Makeup Air Units WHSE28 - Division 23 - HVAC

T I V I

A N

S M I T T

R

A

G

R

A

T I

TO

APPR

AUTH

DATE

RCD

OTHER

FROM

OTH

T I

ACTIO

N

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE

FROM

APPR

AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

237433 PACKAGED MAKEUP AIR UNIT

SD 03 Product Data Package unit details 1.2 G Filter media 1.2 G Fan curves 1.2 G Sound power data 1.2 G Electrical requirements 1.2 G Control wiring diagram 1.2 G List of similar product installation 1.2 G Warranty certificate 1.2 G

Page 6/7

T I V I

A N

S M I T T

R

A

G

R

A

T I

TO

APPR

AUTH

DATE

RCD

OTHER

FROM

OTH

T I

ACTIO

N

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE

FROM

APPR

AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

230593 TESTING ADJUSTING AND BALANCING FOR

MAKEUP AIR UNIT

SD 01 Preconstruction Submittal Independent TAB Agency personnel qualifications

1.4 G

TAB Firm details 1.4 G Designations of TAB Team Engineers/Assistants

Team field leaders

1.4 G

SD-02 Shop Drawings Tab schematic drawings and reports 1.4 SD-03 Product Data 1 TAB procedures 1.4 TAB related submittals 1.4 TAB procedure 1.4 TAB Execution 1.4 TAB verification 1.4 SD-06 Test reports Certified Final DALT report 1.4 Certified Final TAB report 1.4 SD-07 Certificates TAB agency qualifications, 1.4 Instrumentation calibration certificate 1.4

Page 7/7

DDJC Remove and Replace Gas Fired Heaters Project - Division 26 - Electrical

T I V I

A N

S M I T T

R

A

G

R

A

T I

TO

APPR

AUTH

DATE

RCD

OTHER

FROM

OTH

T I

ACTIO

N

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE

FROM

APPR

AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

260500 ELECTRICAL

SD 02 Product Data Conduit 1.3 G Wires and cables 1.3 G Circuit Breakers 1.3 G

Division 26 E l e c t r i c a l