SOW Water Service Lines PVC.pdf

PDF 164 KB Posted

Attached to
Water Service Line, Ponca City, OK Area
Solicitation number
246-24-Q-0087
Issued by

About this file

This document contains a statement of work and related federal contract opportunity solicitation for a water service line installation project. The statement of work provides specifications for furnishing and installing a water service line using PVC pipe with bell and spigot joints at a location in Ponca City, Oklahoma. Requirements include installation in accordance with drawings and staking, maintaining specified separations between water and sewer lines, providing thrust blocking, trench excavation and backfilling standards, pressure testing, disinfection, and clean-up. The solicitation issued by the Indian Health Service seeks quotes for this project, with a 60-day period of performance and April 7, 2024 deadline for submissions. The procurement is reserved for Indian-owned small businesses. Quotes will be evaluated on an acceptable/unacceptable basis for price and technical compliance with the statement of work.

View the file

Other files

File Type Posted
Bid Sheet.pdf PDF
RFQ Construction Clauses-updated February 2024.pdf PDF
ok30 (1).txt TXT text file
OEH-8 Proposed.pdf PDF
SF18-95a Request for Quote.pdf PDF
IHS IEE Representation Form_Jan 2022_508 Compliant.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Service Lines PVC Date: March 2017

Author: Ted Schlueter, P.E. Water Service Lines PVC

STATEMENT OF WORK

1.01 SUMMARY OF WORK TO BE DONE BY CONTRACTOR

A. Furnish and install a water service line as shown on the drawing.

1.02 SITE LOCATION

A. 4504 80 Rd., Ponca City, OK 74604

1.03 CONSTRUCTION SCHEDULE

A. Contact the Construction Inspector three business days before the start of any work.

B. Failure to perform work on the date scheduled will require 24-hour notice to rescheduling the work.

C. Leave all work exposed until inspected and approved. Work not inspected before it is covered will be re-exposed at the Contractor’s expense.

1.04 QUALITY ASSURANCE

A. Perform work under the direction of personnel licensed in the state including, but not limited to Plumbing.

1.05 WARRANTY

A. Provide a minimum one-year warranty for all materials and labor, covering defects in the materials or workmanship.

1.06 WATER SERVICE LINES (4-inch diameter and smaller)

A. PVC Pipe Material Requirements

1. Pipe shall be PVC 1120 pressure pipe made from class 12454 materials as defined by ASTM D-1784 with outside diameter dimensions of steel or cast iron pipe. The PVC compounds shall be suitable for potable water meeting NSF Standard No. 61.

PVC pipe shall be manufactured to meet the requirements of ASTM D2241. Use 20 foot pipe lengths. Joints are bell and spigot type.

a. Pressures less than or equal to 125 psi

1) Pipe: Use PVC Class 160 SDR 26 or Class 200 SDR 21 pipe.

2) Fittings: Use schedule 40 PVC (ASTM D-2466) or

Schedule 80 PVC (ASTM D-2467) fittings.

b. Pressures greater than 125 psi use pressure class of piping and fittings as shown on the bid sheet.

1.07 INSTALLATION

A. Install water service lines and appurtenances in the locations, sizes and materials shown on the drawings or staked in the field.

B. Water and sewer separation requirements.

Water Service Lines PVC Date: March 2017

Author: Ted Schlueter, P.E. Water Service Lines PVC

1. Maintain a minimum vertical separation between water service lines and sewer lines of 24 inches with the water service line placed above the sewer line.

Otherwise the water service line shall be constructed of ductile iron or placed within Steel Encasement Pipe for a 20-foot section centered at the crossing.

2. Maintain a minimum 10 foot separation between water service lines and sewer lines. Otherwise the water service line shall be constructed of ductile iron or placed within a Steel Encasement Pipe for the entirety of the length for which the minimum separation is not maintained.

C. Thrust blocking is to be provided at all changes in direction.

1.08 TRENCH

A. Depth: Minimum 30 inches.

B. Bottom: Free from stones greater than 1 inch, large dirt clods, and any frozen material.

C. Bedding: If the trench bottom is hardpan, rock, or has stones larger than 1 inch in diameter in the largest direction:

a. Over excavate 6 inches.

b. Place 6 inches of mechanically compacted imported bedding (maximum particle size 1 inch) under the pipe

c. Place pipe in trench.

d. Place 6 inches of mechanically compacted imported bedding (maximum particle size 1 inch) on the sides and above the pipe D. Backfill: restore trenches to initial grade.

1.09 TESTING

A. Before joints are covered, test pipe for leaks.

B. Visually inspect all connections and fittings for leaks in the presence of the

Construction Inspector.

C. Repair all leaks before backfilling.

1.10 DISINFECTION

A. Disinfect in accordance with AWWA C651 before placing in service.

1. Sample and test until 2 consecutive (minimum of 24 hours apart) negative Bac-T tests are obtained.

2. Provide a copy of the negative test to the Project Engineer.

1.11 CLOSEOUT ACTIVITIES

A. Restore the site as close as is practical to its original condition.

B. Provide record drawings to the Project Engineer.