SOW_VIIS_Plumbing_Services.pdf
PDF 219 KB Posted
- Attached to
- SERVICE, OPTION YEAR, PLUMBING SERVICES, VIIS
- Solicitation number
- 140P5423Q0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5423Q0021_Amd_0001.pdf | ||
| SCA_WD_2015-5715_Rev_17.pdf | ||
| Sol_140P5423Q0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Virgin Islands National Park St. John, Virgin Islands
1300 Cruz Bay Creek
St. John, VI 00830
General Plumbing Services
SCOPE OF WORK
National Park Service Interior Region 2
South – Atlantic – Gulf
Background and Description
Currently, Virgin Islands National Park (VIIS) currently does not have a plumber on their staff. This requirement is needed as (VIIS) seeks to contract out plumbing services that include but are not limited to the services included in this scope of work. The National Park Service (NPS) intends to award a base plus up to four option years for this requirement.
This contract is for Preventative Maintenance, Recurring Maintenance and Emergency Repairs to park facilities and housing for various locations of VIIS within St. John, USVI on an as need basis including.
Services are expected to be provided on an as-need basis for VIIS.
Period of Performance
Base Year: JUNE 2023 – JUNE 2024 Option Year One: JUNE 2024 – JUNE 2025 Option Year Two: JUNE 2025 – JUNE 2026 Option Year Three: JUNE 2026 – JUNE 2027 Option Year Four: JUNE 2027 – JUNE 2028
Location
The plumbing services are to be provided at various locations within VIIS on St. John, VI. Please note that NPS Points of Contact and specific location information will be given upon award to the awardee.
Expectations
1. The contractor is expected to respond to service calls within 48-72 hours of notice from park staff or sooner if possible.
2. The contractor must verify that all personnel can safely perform the work being requested for each location and must take all proper precautions to perform the work safely without any damage or harm to property or staff.
3. The contractor will be responsible for all damages (if any) that occur to park owned property while performing the work.
4. The contractor will provide all necessary copies of invoice of work performed to the onsite representative for approval prior to invoice submission into IPP.gov.
5. The contractor must provide proof of insurance upon request.
6. Prior to performing any services, the contractor must provide pricing to the onsite representative to ensure funds are available for the services. The Government will not be responsible for paying invoices on services provided without park approval.
Safety
1. This Contractor is to follow at a minimum all OHSA rules and procedures.
2. The Contractor shall immediately report to the Park Representative all accidents resulting in employee injury or death or damage to property while performing this contract.
Travel
Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
Other Unique Requirements
The contractor shall take any necessary precautions to protect and preserve all natural resources, cultural resources and all historic fabric, materials and structures that are in the park(s).
The Contractor is strongly encouraged to minimize waste by recycling or salvaging as much non-hazardous demolition waste as possible.
Park Personnel Contact
Information will be given at time of award.
Fees and Payment Processing
• All travel and any other direct or indirect costs must be included on invoices for services prior to rendering them.
• The Government will not be liable for any work or services performed or for any payment that is beyond the amount that has been authorized through the issuance of the award unless a formal modification has been issued by the Contracting Officer.
• Once park personnel have approved and confirmed that services have been rendered. The contractor must upload all approved invoices into IPP.gov to receive payment.
Note:
• Items in red must be filled out. All other sections are optional as many services may vary on time and material.
• Additional simple or generic plumbing services may be requested in addition to the services as mentioned on this list.
• The NPS intends to award a lump sum for this requirement and the selected contractor is expected to invoice from the lump sum until all funds are spent on services rendered.
• Contractor must keep track of funds allocated and remaining and should not invoice or render services if there are insufficient funds remaining.
• If insufficient funds remain for services that HAVE been rendered and approved by the park, the Contracting Officer will work with VIIS to ensure funds are added in a timely manner.
Plumbing Contractor Name:
Service Call Response Time: ___________________ Hours Address:
Phone: SAM UEI:
Item / Description: Unit Cost (Labor Cost Per Hour)
Park Supplied
2023 2024 2025 2026 2027 2028 Replace Lavatory Faucet
$ $ $ $ $ $ YES
Replace Kitchen Sink & Faucet
Replace Water Closet and Wax Seal
Replace Urinal Flush Valve
Replace Water Closet Flush Valve
Replace Pressure Pump
Replace Pressure Switch
Replace Shower Valve
Replace 1" Water Line Including Fittings ($'s/ LF_________)
$ $ $ $ $ $ NO
Replace 1.5" Water Line Including
Replace 2" Water Line Including
Install Water Heater
Repair Leak in each - 1" fitting
Repair Leak in each - 1.5" fitting
Repair Leak in each - 2" fitting
Free Clogged Wall Mounted Urinal
Free Clogged Floor Mounted Water Closet
Free Clogged Sink
Free Clogged Wall Mounted Water Closet
Material Mark Up %
Unforeseen Conditions Hourly Rate Master Plumber
Per Hour
Unforeseen Conditions Hourly Rate Plumber’s Helper
Service Call / Trips to Visitor Center, Maintenance Ghut & Lind Point
Service Call / Trips to Trunk Bay
Service Call / Trips to Cinnamon Bay
Service Call / Trips to Lyne House (Caneel Bay)
Service Call / Trips to Calahan & Montique
Service Call / Trips to Lameshurt $
File details come from the government source that posted it. Updated .