SOW_Termite fumigation.pdf

PDF 491 KB Posted

Attached to
Pest Control - Fumigation and Repair
Solicitation number
30465PR240000015
Issued by

About this file

This document is a Scope of Work (SOW) for a federal contract opportunity related to the eradication of drywood termites, fungus, and wood boring beetles at Coast Guard Station Monterey.

The SOW outlines the general requirements to provide all labor, materials, and equipment necessary to address and resolve the identified issues in the Admin, BEQ, and Galley buildings. The contractor shall fumigate the structures, remove and replace any fungus-infected and damaged components, and fumigate for wood boring beetles. The work must commence within 5 days of the notice to proceed and be completed within 10 working days of contract award. The contract is for the Coast Guard under the Department of Homeland Security. Key details include the square footage of the affected buildings, specific findings and recommendations, site visit requirements, contractor personnel identification, and detailed safety and environmental protection procedures. Interested parties must contact the designated Contracting Officer's QAE Representative to arrange a site visit.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to address and resolve issues related to drywood termites, fungus, and wood boring beetles found in the structure as identified in the findings and recommendations below.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 10 working days after contract award.

3. SCOPE OF WORK:

Findings:

Admin building: one floor, 8,900 sq. ft.

• Evidence of drywood termites was noted at/in the support post and roof eaves.

• Evidence of wood boring beetles at/in the support post.

BEQ building: two floors, 12,600 sq. ft.

• Evidence of drywood termites was noted at/in the second-floor roof eaves.

Galley building: one floor, 6,550 sq. ft.

• Evidence of drywood termites was noted at/in the roof eaves and support post.

• Fungus infection and damage at/in the fascia at the eaves.

• Evidence of wood boring beetles at/in the support post at the overhang and support post.

The Contractor shall perform the following tasks:

3A. Drywood Termites

• Remove or cover accessible drywood termite fecal pellets as indicated.

• Fumigate the structure with an approved fumigant for the eradication of drywood termites.

3B. Fungus / Dry Rot: 1,200 sq. ft./120 linear ft.

• Remove fungus-infected and damaged components and replace with new material.

• Seal wood components with paint or other moisture sealant resistant to weather.

3C. Wood Boring Beetles

• Fumigate the structure with an approved fumigant for the eradication of wood boring beetles.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with MKC Patrick O’Connor @ 808-551-9283. The site address is:

USCG STATION MONTEREY

100 Lighthouse Ave

Monterey, CA 93940-14

5 . DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)

REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MKC Patrick O’Connor @ 808-551-9283.

Inquiries concerning any phase of the specification before or after award shall be made to MKC Patrick O’Connor

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The USCG STA Monterey Security

Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on CG STA Monterey shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the USCG STA Monterey Base Safety Officer, MKC Patrick O’Connor @ 808-551-9283 in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on USCG STA Monterey. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on USCG STA Monterey has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on USCG STA Monterey shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist MKC Patrick O’Connor @ 808-551-9283, prior to starting work and must be in accordance with the Unit Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on USCG STA Monterey.

Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

File details come from the government source that posted it. Updated .