SOW - Sequoia WI 186.pdf
PDF 177 KB Posted
- Attached to
- PLC SYSTEM UPGRADE
- Solicitation number
- 70Z04024Q60137Y00
About this file
This document is a Statement of Work (SOW) for the upgrade of the steering system PLCs on the 225' CGC Sequoia. The SOW describes the requirements for the contractor to replace and program the existing Allen Bradley PLCs with new Siemens PLCs, including the provision of Siemens CPU, memory cards, and expansion modules by the government. The contractor must provide a qualified technical representative to advise on the manufacturer's system, assist with installation and testing, and ensure compliance with OEM procedures. The SOW references applicable drawings, publications, and standards. Acceptance testing must be performed to verify the system is fully operational.
The related federal contract opportunity is a competitive solicitation (70Z04024Q60137Y00) for the PLC system upgrade, with a firm fixed price purchase order to be awarded on a lowest priced technically acceptable basis. The contractor shall provide the services of a qualified technical representative experienced with Siemens PLCs. The government will provide the Siemens hardware components, and the contractor shall be responsible for the installation, programming, and testing. Quotes are due by 04/26/2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Smart Matrix Acquisition.GOV.pdf | ||
| 70Z04024Q60137YOO RFQ.docx | DOCX document | |
| WAGE DETERMINATION.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 838 of 872 Rev-0
28 JAN 2022
Work Item 186: Steering System PLC, Upgrade
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to replace and program the steering system PLCs in accordance with Original Equipment Manufacturer (OEM) guidance.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN
QTY ESTIMATED COST
($/UNIT)
N Siemens CPU 1214 NSN: 7042-01-693-4330
PN: 6ES7214-1AG40-0XB0
2 ea. 400.00
N Siemens Expansion Module, S7-
1200, 8 DI, 8 DO
NSN: 5998-01-693-4347
PN: 6ES7223-1BH32-0XB0
2 ea. 255.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.
1.4 Contractor Furnished Property.
MTI ITEM DESCRIPTION NSN/PN
QTY ESTIMATED COST
($/UNIT)
N SIEMENS MEMORY CARD,
S7-1200, 4MB
NSN: 7050-12-414-4763
PN: 6ES7954-8LC03-
0AA0
2 EA. 60.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing (CGDWG) 225-WLB-561-202, Rev B, JAN 2021, Steering Control Wiring
Diagram
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (CGTP) 3555, SWBS 561, Section A, Jan 2021, Steering Gear
System- Model 990192-1 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2020, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Page 839 of 872 Rev-0
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.5 Acceptance testing
3.1.2 Tech Rep. The Contractor shall provide the services of a Qualified Technical Representative who is familiar with Siemens PLCs and equipped with a laptop loaded with Siemens STEP 7 development software (version 14 or higher) and a communication cable to accomplish the following on site:
Advise on manufacturer's proprietary system information.
Assist with the following installation and repair method(s): remove old PLC and installing new
PLC, load software to Siemens PLC/CPU 1219, connect all cable/wire, and test the Steering Gear System.
Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, and reassembly as applicable.
3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.
3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Electrical work. The Contractor must accomplish all electrical work in accordance with SFLC Std Spec 3042, and test cables in accordance with SFLC Std Spec 3041. Utilize the existing wire ways for new cable runs as much as possible.
3.2 Removal. The Contractor shall disconnect and remove both the existing PLCs, Allen Bradley Model
SLC-150.
3.2.1 Parts to be removed. Remove the Steering Processor Units (piece 18) and Memory Modules (piece
19) shown on sheet 26 of drawing CG DWG 225-WLB-561-202.
3.2.2 Check wiring. Ensure all wire leads into the PLC are labeled as they will be reused on the replacement PLC. If labels are missing, add them in accordance with SFLC Std Spec 3042.
Page 840 of 872 Rev-0
3.2.3 Disconnect and dispose. Disconnect Steering Processor Units and Memory Modules and dispose of them in accordance with local ordinances.
3.3 Installation. The Contractor shall install new Siemens model PLCs and reconnect existing wire leads in accordance with sheets 26A, 27A, and 29A of CG DWG 225-WLB-561-202.
3.4 Program and Configure. The Contractor shall program the replacement Siemens PLC using the Siemens development STEP 7 software and configuration files provided by the Government. After installing the software, the replacement Siemens PLCs have to be set in “Run” mode to test Steering Gear system.
3.5 Acceptance testing. The Contractor shall thoroughly test the steering controls and ensure the system is fully operational. Submit a CIR.
3.5.1 Determine success. In the presence of a Government representative, test all probable steering changes and configurations. The system passes testing when tests are completed with no errors or unexplained behavior.
3.5.2 In event of failure. In the event errors or unexplained behavior are encountered, a system groom by the OEM may be required. Submit a CFR recommending that Recurring Work Item (RWI) 56110_RAD_0121_225WLB be authorized.
4. NOTES
This section is not applicable to this work item.