This document is a Statement of Work (SOW) for a crane barge and operator services to support the staging and de-staging of equipment for the NOAA ship Henry B. Bigelow during a Remotely Operated Platform for Ocean Sciences (ROPOS) research cruise in July and August 2024. The contractor will provide a crane barge and operators to lift approximately 88,000 lbs of ROPOS equipment from trucks onto the ship's deck on two separate days. The work will be conducted at Naval Station Newport, Pier 2 in Rhode Island. The SOW includes details on the specific equipment to be lifted, required lift capacities, and the preferred positioning of the barge and equipment on the ship. The related federal contract opportunity is Solicitation Number 1333MK24Q0058 for "Provide ROPOS Crane Barge for NOAA Ship Henry Bigelow" under the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
Sol_1333MK24Q0058.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

2024 Deepsea Coral ROPOS ROV Staging/De-staging

Crane Operations

The Contractor shall furnish the necessary personnel, materials, equipment, services and facilities (except as otherwise specified), to perform the following statement of work/specifications.

1.0 GENERAL

The Deepsea Coral program of the National Marine Fisheries Service (NMFS), Northeast Fisheries Science Center (NEFSC) is requesting the services of one barge crane. The crane (and its operators) will conduct heavy lifting operations required to stage and de-stage the NOAA ship Henry B. Bigelow, in support of the Remotely Operated Platform for Ocean Sciences (ROPOS) located at Naval Station Newport (NSN), Rhode Island, Pier 2 north side. The weight limitations of NSN Pier 2 exclude the use of a wheeled crane to perform these operations and the Navy will not issue a permit.

2.0 SPECIFIC TASKS AND RESPONSIBILITIES

The work will be conducted during two separate single day evolutions, the first being on July 15, 2024, and the second on August 1, 2024, after the conclusion of the research cruise. The NOAA Ship Henry B.

Bigelow is a 209ft government own research vessel that will be the supporting platform for the Deepsea Coral ROPOS ROV cruise. The vessel will be available all day for the two separate events expected to last 5-7 hours each. The crane barge will mobilized aft or outboard of the vessel prior to the start of lifting ops and have the necessary lifting capacity to lift the largest items from the pier to the center line of the vessel. The vessel, lead ROPOS engineer, and contractor will mutually agree on a time to start operations. The crane and its operators will be expected to lift 5 separate items on each date, totaling 88,000lbs (see Table 1) and place them in exact predefined locations on the ships deck (see Image 1).

The single largest equipment item to be lifted weighs 35,000lbs which will be placed on the vessel’s centerline.

All the equipment that requires lifting will be arriving on the pier in semi-tractor trailer trucks prior to the start of lifting operations. Items will be lifted directly from the trucks to the ship’s decks during staging operations and directly from the decks to the trucks during de-staging.

The contactor will be responsible for applying and obtaining all applicable permits pertaining crane operations at Naval Station Newport, Pier 2 as well as security clearance for base access.

3.0 POINT OF CONTACT

LT Christopher Gallagher Operations Officer

NOAA Ship Henry B. Bigelow ops.henry.bigelow@noaa.gov 774-313-9432

Table 1: CSSF LARGE EQUIPMENT LIST - BIGELOW 2024

Item

Weight (lbs)

Hoisting Apparatus

ROPOS

6,800

Crane barge

HPU

5,700

Ship’s crane

DOCKING HEAD

3,000

WINCH ASSEMBLY included the following:

WINCH DRUM

35,000

LEVELWIND

5,800

LEVELWIND STANDOFFS

2,400

MULTIBEAMS

1,800

OPS CONTAINER (20’)

15,890

WORK VAN CONTAINER (20’)

19,220

POWER SUPPLY CONTAINER 8,500 Crane barge

LOOSE TOTES (spares)

5,000

Total

109,110

CANADIAN SCIENTIFIC SUBMERSIBLE FACILITY

#110-9865 WEST SAANICH RD

N. SAANICH, B. C., V8L 5Y8, CANADA

Ph.+1(250) 655-5096 Fax +1(250) 655-5097 E-mail: operations@ropos.com°

'A' FRAME IN AFT WORKING CONFIGURATION

(STOWED & WORKING POSN.)

(LOWERED POSITION)

STERN GANTRY

PLAN VIEW

SIDE ELEVATION

100 95 90 85 80 75 65

BOAT

RESCUE

DN

60 55 50 45 40

100 95 90 8085 75 70 6065 55 50 4045

01 LEVEL 11407 ABL

02 LEVEL 14150 ABL

03 LEVEL 16650 ABL

04 LEVEL 19150 ABL

MAIN DK 8650 ABL

2nd DK 6000 ABL

CENTERLINE SHEAVES

IN WORKING POSITION

'A' FRAME IN WORKING CONFIGURATION

Football Floats

Sub oils Tote

A5 - Science Tote 1

B6 - Science Tote 2

A2 - Mob Tote

Tote

Deck Lights

CAM

CAM

CAM

Ops Container - 12,300 Lbs (5,580 Kgs) Dual Motor HPU - ~9500 Lbs (4,310 Kgs)

Powercube - 8,500 Lbs (3,856 Kgs)

Mid-Depth Winch As Configured - 45,100 Lbs ( 20,450 Kgs)

Workvan Container - 18,800 Lbs (8,525 Kgs)

ROV - 8,165 Lbs (3,704 Kgs)

CAM Deck Cameras

Tote

Bulk oils Tote

AC

C om pressor

81°

53°

67°

133°

390.3214

Statement of Work_ROPOS Crane Contract_2024.pdf