This Statement of Work (SOW) details the replacement of kitchen cabinets, vanities, and appliances at the Coast Guard Housing complex in Eureka, California. The project involves four housing units and requires the contractor to remove and replace existing kitchen components, including base and wall cabinets, vanities, and three specific appliances per unit: a refrigerator, dishwasher, and gas range. Work must be completed between 7:00 AM and 5:00 PM, Monday through Friday, excluding federal holidays, with strict requirements for site preparation, demolition, installation, and final cleaning. The contractor is responsible for purchasing residential-grade appliances that fit the specified dimensions, ensuring proper installation, and conducting a final walk-through with the Coast Guard Housing representative for project acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REPLACEMENT OF KITCHEN CABINETS, VANITIES, AND APPLIANCES AT EUREKA HOUSING

AREA

PART 1 - GENERAL

The Contractor shall provide all labor, materials, equipment, and supervision necessary to remove and replace kitchen cabinets, vanities, and appliances in four (4) units at the Coast Guard Housing complex located at 1561 Leeman Court, Eureka, CA. Work includes demolition and disposal of existing cabinets, vanities, and appliances; verification of all field measurements; and purchase and installation of new cabinets, vanities, appliances, and associated finishes as per the approved specifications.

PART 2 - FACILITY AND SECURITY REQUIRMENTS

1. Contractor vehicles must have valid registration and insurance, and vehicle operators must have a valid driver license. All personnel shall have valid photo identification.

2. The contractor shall clean up all areas to ensure they are clear of debris daily. At completion of the project all construction areas will be returned to their original condition. The contractor shall remove all waste material generated and dispose of in accordance with industry standards and applicable environmental rules and regulations.

3. Minimizing impact to Coast Guard operations. Work performed at Eureka, CA shall be completed between the hours of 7:00AM and 5:00PM, Monday thru Friday (excluding Federal Holiday) unless authorized by the Contracting Officer.

PART 3 - GOVERNMENT FURNISHED MATERIAL

2. The Contractor will provide other materials to complete the work necessary. Bathroom facilities will not be available for contractor personnel.

PART 4 - TECHNICAL POINT OF CONTACT DESIGNATION

1. Technical POC for this task is:

Alex Aviles Office: (707) 442-1473 E-mail: Alexandro.L.Aviles@uscg.mil

PART 5 - TASKS

1. Site Verification & Preparation:

a. Conduct a site visit (if needed) and verify all critical field measurements.

b. Protect all adjacent areas, flooring, and finishes during construction.

c. Coordinate with the Coast Guard Housing representative regarding access and any necessary utility disconnections (Contractor is not responsible for plumbing and electrical connections).

2. Demolition & Disposal:

a. Remove and properly dispose of existing cabinets, vanities, and appliances.

b. Safely cap water supply and drain lines (if required for cabinet removal - responsibility of other party).

c. Patch walls and flooring as necessary to prepare for cabinet and vanity installation (minimal patching only).

3. Cabinet and Vanity Installation:

a. Install new base and wall cabinets per the approved layout. (See specifications for specific dimensions and placement).

b. Install new vanities per the approved layout. (See specifications for specific dimensions and placement).

c. Ensure all cabinet components are level, plumb, and securely fastened.

d. Install new cabinet hardware (pulls, knobs, hinges) per the specifications.

4. Appliance Installation:

a. Purchase and install kitchen appliances in each unit that fit into the dimensions in the Housing Pictures Attachment to the SOW. Appliances should be residential models suitable for extended use. Appliances per kitchen unit include:

1) Refrigerator

2) Dishwasher

3) Gas Range

b. Ensure all necessary electrical and plumbing connections are properly made and inspected.

c. Test all appliances to ensure proper functionality.

5. Finishes & Touch-Ups:

a. Apply caulking and sealants at all joints, edges, and seams (as needed for cabinet installation).

b. Perform minor touch-ups for a finished and complete cabinet and vanity installation.

6. Final Cleaning and Inspection:

a. Remove debris and construction waste from the site (related to cabinet, vanity, and appliance installation).

b. Clean and polish cabinets, vanities, and appliances.

c. Conduct a final walk-through with the Coast Guard Housing representative for acceptance of the installation.

PART 6 - ACCEPTANCE

1. Completion of work under this contract will be monitored and accepted by Coast Guard Technical POCs listed in

PART 4.

(END)