This Statement of Work (SOW) details the procurement and replacement of four laboratory fume hoods for the Puget Sound Naval Shipyard (PSNS) in Bremerton, Washington. The project involves demolishing and removing four existing fume hoods that are over 20 years old and installing four new BMC Airfoil Bypass Fume Hoods with specific configurations: two 6-foot and two 8-foot models. Each fume hood will include specialized features such as electrical outlets, switches, air and gas connections, digital airflow monitors, epoxy resin work surfaces, and various storage cabinets (acid and flammable storage).

The estimated project cost is $99,520, with an estimated 40 work hours required. The contractor must be a U.S. citizen and will have access to a controlled industrial area. The work is limited to Building 59 laboratory, and the contractor may need to coordinate with NAVFAC for utility isolation during demolition and installation. The fume hoods will have electric power, water, and natural gas connections, and the installation requires field testing by the vendor to verify functionality. The project will be overseen by a government representative and requires quality assurance to ensure the newly installed equipment is in good working order.

View the file

Other files

File Type Posted
25Q2130 2 PG MOD TO SIGN.pdf PDF
25Q2130 CONFORMED_FUME HOOD.pdf PDF
25Q2130 FUME HOOD.pdf PDF
51678700_8701 - FUME HOOD DRAWINGS.pdf PDF
CDRL WARRANTY.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSNS&IMF 4200/43 (2-16) Page 1 of 5

STATEMENT OF WORK–SERVICE CONTRACT WORKSHEET PSNS&IMFINST 4200.14

CHECK ALL THAT APPLY:

HIGH RISK (Justify in No. 12 below)

SUBSAFE Fly By Wire DSS SOC

WORK IS WITHIN: ENGINEERING SPACE PROPULSION PLANT SYSTEM

(Review NAVSEAINST 9210.4B for applicability)

JML No.: 5167-8700 & 51678701

NAVCOMPT 2276 No.: (Request for Contractual Procurement (RCP) required for services over $2,500 or services with terms and conditions.)

Ship/Activity: Code 134

Title: Purchase and replacement of four laboratory fume hoods.

Place of Performance: PSNS Bremerton, BLDG 59

Period of Performance: TBD

Estimated Cost: $99,520

Source of Estimate: Vendor quote

REFERENCES: PSNS provides required dimensions to vendor. OEM vendor of fume hoods has original drawings/schematics from original install 20+ years ago.

1. BACKGROUND: The laboratory division is replacing fume hoods from Laboratory Design Construction, Inc that require installation.

Describe current (baseline) condition: Existing fume hoods were installed by vendor (Laboratory Design Construction, Inc) 20+ years ago, and are and past expected service life.

2. SCOPE: Need to purchase replacement fume hoods, including demo/removal of 4 current fume hoods and installation of 4 replacement fume hoods. Also, includes field testing by vendor to verify functionality of new fume hoods.

PSNS&IMF 4200/43 (2-16) Page 2 of 5

3. DELIVERABLE ITEMS: List deliverable products and schedules; test reports, time sheets, Government furnished property (GFP), etc. to be provided to the Government representative and/or contracting officer upon task completion.

4. CONTRACTOR FURNISHED MATERIAL: See JML(s) for an estimated list of prices for the following items:

The contractor shall provide services for

• Demo and removal of four current fume hoods.

• Installation of four replacement, including functionality checks and SEFA testing for the four new fume hoods, sizes/specifications below:

Fume Hood 1:

• 6 ft BMC Airfoil Bypass Fume Hood with:

o (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (2) 220V Single Electrical Outlets, (1) 3” Dia Port @ Right Side, (1) Sash Stop and (1) digital Airflow Monitor/Alarm o (1) 6 ft Epoxy Resin Work Surface – NO Cup Sink (color: black) o (1) 36” Acid storage cabinet w/vent kit (vented to fume hood) o (1) 36” Base storage cabinet w/vent kit (vented to fume hood)

Fume Hood 2:

• 8 ft BMC Airfoil Bypass Fume Hood with:

o (1) Cold Water Gooseneck, (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (2) 220V Single Electrical Outlets, (1) Sash Stop and (1) Digital Airflow Monitor/Alarm o (1) 8 ft epoxy resin work surface – with cup sink (color: black) o (1) 48” Flammable storage cabinet w/self-closing doors (NO venting) o (1) 48” Acid storage cabinet w/vent kit (vented to fume hood)

PSNS&IMF 4200/43 (2-16) Page 3 of 5

Fume Hood 3:

• 6 ft BMC Airfoil Bypass Fume Hood with:

o (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (1) Sash Stop and (1) Digital Airflow Monitor/Alarm, Combination Sash, and Custom 8” Dia Duct Collar at Custom Location o (1) 6 ft epoxy resin work surface – NO cup sink (color: black) o (1) 36” Acid storage cabinet w/vent kit (vented to fume hood) o (1) 36” Flammable storage cabinet w/self-closing doors (NO

Fume Hood 4:

• 8 ft BMC Airfoil Bypass Fume Hood with:

o (1) Air, (1) Gas, (1) Light Switch, (1) Blower Switch, (2) 115V Electrical Duplexes, (1) Sash Stop and (1) Digital Airflow Monitor/Alarm o (1) 8 ft Epoxy Resin Work Surface – NO cup sink (color: black) o (2) 48” Flammable Storage Cabinets w/Self-Closing Doors (NO

5. GOVERNMENT-FURNISHED PROPERTY:

5.1 Original acquisition value of material:

5.2 Location of GFP:

5.3 Manufacturer, model number, and type. Include serial number(s):

5.4 Government provided or contractor pickup:

6. QUALITY ASSURANCE REQUIREMENTS:

PSNS & IMF –or- Contractor is responsible for quality assurance.

The newly installed equipment must be in good working order.

PSNS&IMF 4200/43 (2-16) Page 4 of 5

7. SECURITY REQUIREMENTS: Contractor personnel must be a US citizen, with proof of citizenship document, and will require access to PSNS&IMF controlled industrial area (Green, Yellow, or Red security badge).

Originator determines if a Department Of Defense Contract Security Classification Specification (DD254) is required.

8. TRAVEL REQUIREMENTS: PSNS&IMF, Bldg 59, 1400 Farragut Ave, Bremerton, WA 98314

Is carrier onboard delivery (COD) required? (i.e., when the contractor is transported to a vessel underway.)

9. GOVERNMENT REPRESENTATIVE: Lizzle Almonte, 1400 Farragut Ave, Bremerton, WA 98314; 360-476-4276; fax 360-476-5587;

anna.g.almonteblake.civ@us.navy.mil

10. OTHER CONSIDERATIONS:

10.1 Estimated Work Hours: 40

10.2 All technical clarifications will be coordinated through the Government representative.

10.3 Environmental and safety concerns: Contractor personnel

will be limited to Bldg 59, laboratory.

10.4 Laydown and utilities requirements: Fume Hoods have

electric power, water, and natural gas. Contractor may need to coordinate with NAVFAC for utility isolation (power, water, natural gas) during demo/install.

12. JUSTIFICATION FOR HIGH-RISK FLAG: -NA-

Date:

Code 413 Statement of Work review

Date:

Cognizant technical code review

Date: _____ Cognizant APS/PLM or WIM Review

PSNS&IMF 4200/43 (2-16) Page 5 of 5

Notes:

1. Code 413 reviews SOW for contractual adequacy.

2. Cognizant technical code reviews SOW for technical adequacy.

3. Cognizant APS/PLM or WIM reviews SOW to ensure project requirements are adequately described.

File details come from the government source that posted it. Updated .