SOW H7 Paint Booth Ductwork Removal 8.24.2021.pdf
PDF 3 MB Posted
- Attached to
- Paint Booth Ductwork Removal Federal contract opportunity
- Solicitation number
- W50S8J21Q0021
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site visit attendance sheet.pdf | ||
| SOW B7 Paint Booth Ductwork Removal - AMENDMENT 1 - 9.1.2021.pdf | ||
| VBDZ212112 SIte Visit Q and A.pdf | ||
| W50S8J21Q0021.pdf | ||
| H7 SOW Attachments A-G Combined.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
VBDZ212112
Hangar 7 - Remove Paint Booth Ventilation System
1. SCOPE OF WORK:
Historic painting, sanding and corrosion control activities for aircraft has led to the accumulation of heavy metals (Cadmium, Chromium and Lead) within settled dust and overspray throughout the subject structure.
This area has been cleaned, however there is remaining dust and particulates within the previous paint filtration ventilation system. The purpose of this project is to carefully remove and dispose of the previously used ventilation system that was a part of the paint spraying operation, while being cautious to capture any contamination that may be released in the process. Up to two wipe downs and decontaminations may be required as part of the statement of work.
The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to complete the work as described in this Statement of Work (SOW).
Work location is Building 7 at the 109th Airlift Wing (109 AW), 1 Air National Guard Road, Scotia New York 12302.
2. AREA OF WORK:
Contractor shall work only in the areas designated by Contracting Officer Representative (COR). Hangar 7, the former Corrosion Control Facility (Paint Booth), is the location for this work. A floor plan of the work area is included as Attachment A.
3. DESCRIPTION OF WORK:
3.1. The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, materials, and quality control reports required to remove contaminated ductwork and ventilation system, and to fully remediate any hazardous levels of cadmium, chromium and lead identified within the work area. These areas include but are not limited to the former paint booth area, paint storage area, paint mixing room, abrasive blast room, and tool room. Rooms are identified on floor plan included in Attachment A. All work must be completed without damage to any government property.
3.2. All work performed under this SOW shall be conducted in accordance with all applicable state and federal laws and regulations, ANG policies and regulations, and this SOW as outlined below.
3.3. Removal of all dust/overspray accumulation from all surfaces within the work area utilizing wet wipe/scraping methods and HEPA vacuum methodologies. This includes a thorough decontamination of fixtures, walls, ceilings, floor, structural members and drain surfaces. Any water accumulation as part of the cleaning process must be treated (filtered to remove all contaminates), tested and approved by the Base prior to discharge.
3.4. Contractor shall remove and dismantle all “paint booth” and “abrasive blast” ventilation and exhaust equipment and components (fans, filters, etc..) along with associated duct work located within the Building 7 former Corrosion Control Facility (CCF) with the exception of the current roof top units HV- 21 and HV-22 and associated ductwork that supply heat to the area. All ductwork associated with HV-23 is to be decontaminated and removed from within the CCF. If unable to decontaminate ductwork onsite, all contaminated ductwork is to be characterized through representative lab sampling (TCLP), containerized and handled appropriately, potentially as hazardous waste.
Attachment B displays the original plans to scale for the CCF area. Length of ductwork and size can be calculated from this attachment. The HV units were moved to the rooftop approximately 10 years ago, however are shown in their original location on Attachment B.
3.4.1. Supply Air Paint Booth System – Twin supply ductwork, as shown below, is to be removed.
Material removed from the supply air system is anticipated to be non-hazardous and should be isolated from all exhaust materials removed. Material to be recycled by Contractor. All recycling documentation and/or disposal records are to be supplied to the COR and the Base Environmental Manager.
Supply Air Ducts and Filters to Former Paint Booth
Yellow – Continued supply air ductwork that is to be removed. One of two ducts are shown in photo.
Blue – Current Heating Ductwork which is to remain in place
Green – Abrasive Blast Ductwork to be removed and anticipated to be hazardous
Yellow – Remove, expected to be non-hazardous, supply duct Blue – Current Heat supply, LEAVE in place
Blue – Remain in place Yellow – Supply ductwork to be removed Red – Exhaust ductwork to be removed
**Caution to be used – orange communications line to remain intact with no damage during ductwork removal!!
Filter casings to be disposed by Contractor.
3.4.2. Exhaust Air Paint Booth Ductwork – The previous filter wall has three exhaust outlets, and corresponding ductwork. The residue within the exhaust system is anticipated to be hazardous and all dust is to be controlled during removal of the ductwork. Any residual dust in Paint Room is to be cleaned with both a Hepavac, and wet method, and then surrounding walls and floors are to be tested utilizing swipe test as described in Section 3.11. All exhaust ductwork is to be removed up until the hangar wall penetration is reached, approximately 50 feet away from the filter wall outlet connection.
Contractor to use either a site visit or plans to confirm actual distance and amount of ductwork to be removed. At this project end point for each duct, Contractor is to seal off the wall (and/or roof penetration) to matching conditions, per Section 3.6. Hangar wall repairs are to be 2 hr fire rated. Roof penetrations are to be insulated (2” board), and then capped with galvanized sheet metal, taped and sealed with a weather proof material approved by COR. Proposed materials and methods are to be submitted to the COR for approval in advance of performing the seal.
The exhaust ductwork was tested and analytical was performed for the toxicity characteristic leaching procedure (TCLP). Results are included in Attachment C, page 5. It is anticipated that the exhaust ductwork will be characterized as hazardous waste due to the paint particulate that has settled within.
Red = Three exhaust lines from previous filter wall. Each line is to be completely removed back to the hangar wall and/or roof penetration. Top of filter casing (horizontal), along with any filter structures that remain are also to be removed. Note: this is elevated work and contractor required to provide their own lift.
3.4.3 Abrasive Blast Ductwork – The abrasive blast room also requires removal of an exhaust system.
Ducts to be removed from floor level to first penetration with roof and/or hangar wall. Penetrations to be sealed per SOW.
Abrasive Blast Room Exhaust system
3.5. HV-23 REMOVAL:
3.5.1. Contractor to remove the roof top unit HV-23, as shown on Attachment 2. All brackets and supporting structures are also to be removed. This unit provided supply air to the former paint booth filtration unit. Crane and operator to be supplied by Contractor. Pick plan required 30 days prior to lift.
3.5.2. HV-23 is currently interlocked to an exhaust fan that is located in a section of exhaust piping within Hangar 7 that will not be removed. Electrical work will be required for removal of HV-23.
3.5.3. HV-23 has a gas supply line that will also require disconnection and capping. A shut off valve does exist for unit.
3.5.4. Damage that may result to roofing materials as a result of HV-23 removal, are to be accomplished by Contractor.
3.6. PENETRATION SEAL OFFS/CAPPING: Contractor is to seal off all walls (and/or roof penetrations) to matching conditions. Hangar wall repairs are to be 2 hr fire rated. Roof penetrations are to be insulated (2” board), and then capped with galvanized sheet metal, taped and sealed with a weather proof material approved by COR. Proposed materials and methods are to be submitted to the COR for approval in advance of performing the seal.
3.7. All dismantled metal components shall be decontaminated and recycled. Roof and wall penetrations shall be repaired as noted. Any roof mounted items that are removed will also have associated support equipment removed.
3.8. OSHA Decontamination methodologies are required at all entrances to the work area to prevent heavy metal migration outside of CCF area. Contractor is responsible to develop and gain approval of a remedial work plan which includes work areas, staging, project schedule and methodologies.
Contractor access to Work Area. Decontamination area to be created and assembled outside of double door entrance shown. Exact footprint of decontamination area to be proposed by contractor and approved by Base personnel prior to assembly.
Risk Assessment Code – Contractor to take precautions and is responsible to determine appropriate PPE for work tasks.
3.9. Contractor will properly containerize all waste. Waste characterization and disposal/recycling is the responsibility of the contractor. Contractor will work with the COR and Base Environmental to reduce to the extent possible the amount of hazardous and nonhazardous waste generated.
3.10. DECONTAMINATION OF CCF WORK AREA: After all ductwork has been removed, the CCF work area (which includes all rooms shown on Attachment A – Media Blast, Media Storage, Tools, Main Paint Room, Paint Storage, and Office & Documentation Area) is to be decontaminated.
3.10.1. Step 1: All areas are to be cleared with a HEPA vacuum from roof deck, down the side of all walls, across all structural members, and across all floors.
3.10.2. Step 2: Wet wipe all horizontal and vertical surfaces with ChromeKiller™ product. Chrome
Killer™ is to be sprayed onto walls and horizontal surfaces by hand and manually wiped down by personnel. https://vessystems.com/hexavalent-chromium-removal/chromekiller/
3.10.3. Step 3: Position a swipe testing location at the following sampling frequency for each of the following rooms: Media Storage, Tools, Office and Documentation, and Paint Storage. One sampling location is to be located in the center of floor, and one sampling location is to be positioned on each wall. For the Media Blast Room and the Main Paint Booth Room, a swipe sampling location should be positioned every 400 SF of surface area. Contractor is to submit a brief Swipe sampling plan (quantity and location of specific samples for approval by the COR). Swipe test methods are outlined in Section 3.11. It is estimated there will be 35 swipe sampling locations required for this project. Each sampling location will require two separate swipe methods per Section 3.11.
3.10.4. Step 4: Results of Swipe analytical sampling to be shared with COR. If numbers are below the limits outlined in the table below for Required and Recommended Surface Wipe Criteria for LEAD, HEXAVALENT CHROMIUM and CADMIUM, no further cleaning is required. If results are above the limits shown in the table below, steps 2 through 4 above shall be repeated as part of this statement of work. The Table of Required and Recommended Surface Wipe Criteria is also included in Attachment D, the Brookhaven National Laboratory Standard Operating Procedures for Surface Wipe Sampling for Metals.
https://vessystems.com/hexavalent-chromium-removal/chromekiller/
3.11. SWIPE TESTING: The CCF work area is to be tested by an Independent third-party agent. Each designated swipe sampling location is to have 2 samples collected. Samples are to utilize the following methods and sampling media for the analytes specified:
3.11.1. Sample 1: Method = EPA 6010C
Media = MCE Filters; Whatman 541 Analytes = Cadmium, Chromium (total), and Lead
3.11.2. Sample 2: Method = NIOSH 7605
Media = PVC Filters; Whatman 541 Analytes = Hexavalent Chromium (CrVI)
Clearance swipe testing (cost, acquiring, and management) will be the responsibility of the Contractor. In the event the initial clearance testing fails, one additional wet wipe down and additional clearance testing will be performed by the contractor, as described in Section 3.10. Costs associated with the additional cleaning and additional sampling are the responsibility of the Contractor. Attachment E has both a Fact Sheet on Hexavalent
Chromium Swipe Sampling, and the US Air Force School of Aerospace Medicine Laboratory Sampling and Analysis Guide (See Sections 3.3 through 3.4).
Attachment F is a map with dimensions of each room in the work area and shows locations where previous wipe samples were collected. Attachment G is the most current set of swipe analytical data from December 2020. Samples were also collected recently of the exhaust ductwork and ran for TCLP. Results of the TCLP testing are included in Attachment C.
3.12 HV-23 EXHAUST PIPE LABELLING: Contractor to coordinate access to Hangar 7 through the COR and utilize Contractor’s lift to label the elevated HV-23 exhaust piping as “Out of Service – Use Caution Upon Removal – Chromium Residue Within.”
4. PERIOD OF PERFORMANCE:
Work must be completed in 120 days.
5. MATERIALS:
Construction materials must meet code specification and New York State building code for northern construction.
6. MATERIAL SUBMITTALS:
The contractor shall submit to the contracting officer for approval, all items listed within the SOW.
Specifically, any materials utilized to seal the hangar wall penetrations and/ or roof penetrations, plus any chemicals utilized to clean the work area. Ensure that any disapproved material submittal will not impact the approved project execution schedule. Disapproved submittals shall not be considered grounds for a time extension. Allow for a minimum of 5 business days for the Government’s processing of material submittals. The contractor shall not order, deliver, utilize or install any materials without CO’s material approval or remove any materials on site, which have not been properly approved.
7. GENERAL CONDITIONS:
7.1. Contractor and all personnel shall comply with the Standard Industry of New York State Codes.
Contractor shall work within the time line specified by COR.
7.2. Contractor shall field verify all site conditions, quantities, measurements, and project requirements.
7.3. Contractor shall protect and barricade all work areas at all times to protect workers and the public from injury.
7.4. Contractor shall protect all structures, utilities, vegetation, sidewalks and vehicles from damage at all times. Replace all damaged materials with new materials to the satisfaction of the Government, at no additional cost to the Government.
8. DIFFERING SITE CONDITIONS:
Bring any unforeseen project conditions to the attention of the CO immediately. Differing site conditions, which may alter the scope of work, shall be approved by the CO prior to such work being performed.
9. GOVERNMENT WORKING HOURS:
Work hours shall be Monday thru Friday 0700-1530 hours, with the exception of Federal holidays.
Contractor must have prior approval in writing to work outside these guidelines.
10. UTILITIES:
The Government shall provide at no cost to the Contractor reasonable amounts of water and electricity to support the contract. Hook up will be to existing outlets and will be the contractors responsibility.
11. DISPOSAL OF MATERIALS AND CLEANUP:
The contractor shall not use any government disposal bins, dumpsters or trash receptacles for any reason at any time (unless otherwise specified). The contractor shall provide appropriate disposal bins/trash receptacles. Approval of disposal bins/trash receptacles location(s) shall be coordinated through the COR.
The contractor shall not allow debris to leave the work area due to potential damage to aircraft engines.
Contractor shall coordinate with the base Environmental Management Office (EMO) prior to disposing any materials off base. All debris or trash shall be disposed of off base. All demolition debris shall be disposed of at a permitted landfill, with landfill authorization, unless other arrangements have been coordinated through the EMO. Provide proof of landfill disposal from the landfill that accepts the materials. This may be accomplished by providing the government project manager with landfill receipts; waste manifests, or weight tickets from the landfill that accepts the construction debris. Contractor shall clean up after each work period and dispose of all debris at the close of each day.
12. MATERIAL & EQUIPMENT ACCOUNTABILITY:
Notify the government project manager prior to delivery of any material or equipment to the site. The contractor shall ensure someone is available to receive delivered materials and able to store them safely in an area to be coordinated with the government project manager. Any materials delivered without prior coordination and without having someone to take receipt, shall not be accepted and turned away.
13. SECURITY:
109 AW Security Forces squadron will monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the COR to arrange for their entrance onto 109 AW property. All personnel working on the job site will be background checked, and badged if favorable results are determined. Unfavorable findings may result in the inability for the worker to be present on base.
Contractors will be required to submit an AF Form 31 for background checks no later than five business days before project arrival.
14. ESCORTS:
14.1. A security briefing will be conducted during the preconstruction meeting to described requirements.
14.2. All Contractor personnel shall have a minimum of one (1) Form of Photo Identification with them at all times.
15. OTHER CONTRACTOR REQUIREMENTS:
15.1 The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office.
The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
15.2 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
15.3 All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available through ADLS by completing the Force Protection CBT. For Contractors that do not require issuance of a CAC, local training will be provided during badge issuance at SFS via informational binder.
15.4 The use and possession of controlled substances to include marijuana (medical or recreational use) on the installation is in violation of Title 10 US Code 912a. Art 112a. Contractors are notified this policy is strictly enforced and violators will be denied entry. Personnel caught on the installation can be prosecuted.
15.5 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/SMO/SMNCOs/Coordinators will provide OPSEC training or training materials to contract employees within 90 days of employees’ initial assignment to the contract and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) and refresher training (Protecting Sensitive Information) are both available on the MyLearning website. For Contractors that do not require issuance of a CAC, local training will be provided during badge issuance at SFS via informational binder.