This statement of work outlines requirements for a construction project to raise the parapet height on Building 703 at the Eastern Air Defense Sector in Rome, New York. The selected contractor will install a permanent raised guardrail system along three sides of the building totaling approximately 240 feet in length. The contractor must use corrosion-resistant materials in a color that blends with the surroundings. Additional requirements include installing support brackets, applying sealants, installing a personal access point above the second floor vestibule, terminating the railing at appropriate levels, and ensuring the completed guardrail system meets applicable safety standards. All work must be completed within 60 days of the notice to proceed. The related federal contract opportunity is solicitation number W50S8N23Q0016 for roof parapet raising issued by the Department of the Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD NY20230013 Mod 3.pdf | ||
| W50S8N23Q0016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
RAISING PARAPET
BLDG 703
EASTERN AIR DEFENSE SECTOR
GRIFFISS BUSINESS AND TECHNOLOGY PARK
BUILDING 703
366 OTIS STREET
ROME, NEW YORK 13441-4812
EADS PROJECT
GRCL-23-0006
20 June 2023
Table of contents
1. SCOPE OF WORK
2. AREA OF WORK
3. DESCRIPTION OF WORK
4. PERIOD OF PERFORMANCE
5. MATERIALS
6. GENERAL CONDITIONS
7. GOVERNMENT WORKING HOURS
8. UTILITIES
9. DISPOSAL OF MATERIALS AND CLEANUP
10. SECURITY
11. AT/OPSEC
12. ESCORTS
13. SITE VISIT
14. POINT OF CONTACT
1. SCOPE OF WORK:
The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to complete the work as described in this Statement of work (SOW). Work location is at the Eastern Air Defense Sector (EADS) 366 Otis Street, Rome, New York 13441-4812 on the Griffiss Business and Technology Park.
2. AREA OF WORK:
Contractor shall work only in the areas designated by the Engineer in Charge. Area of work is located in building 703.
Contractor to verify all measurements and quantities at site visit.
3. DESCRIPTION OF WORK:
Contractor shall install parapet extension to raise the parapet height to meets NYS building code, OHSA and base safety regulations to meet personnel movements on roof top and the applied safety requirements.
1. Contractor shall install a permanent raised guardrail system along three building side length approximately 80 feet each or an approximant 240 feet in total length.
2. Material will be a corrosive/rust resistant, and the color will blend naturally into the surrounding area or be of a non-emphasizing one solid color when the install is complete.
3. Contractor shall install side mounted support brackets hardware to the current parapet vertical wall surface or face mount where there is no vertical parapet and apply the appropriate sealants to all penetration points.
a. Contractor may utilize permanent installed weighted vertical supports stands in leu of surface mount brackets spanning any non-parapet roof section if the following conditions apply:
i. The leading and trailing ends vertical support railing risers are secured by a side mounted surface bracket on a vertical wall surface.
ii. Railing material is a solid section with no joints in material from the leading to trailing ends of the span before any weighted mid span vertical supports are added.
iii. Weighted foot is corrosive/rust resistant material.
iv. The weighted foot roof contact points have additional roof protection material installed.
4. Contractor will install a latching self-returning swing or sliding personal access point above the 2nd floor vestibule.
5. Contractor shall terminate the railing to the adjacent roofs building siding at the appropriate level.
6. Contractor to ensure that guardrail system meets applicable requirements as specified in 29 CFR 1910.29(b) Guardrail systems, including but not limited to the requirements for top rail height, mid rails or intermediate vertical members (where required), resistance to outward force, construction type, and material.
4. PERIOD OF PERFORMANCE:
Work must be completed in conjunction with the Mission Schedule without interruption of or interference with the function of the military personnel unless prescheduled prior to start of work. All work shall be completed within 60 days from NTP.
5. MATERIALS:
All materials must be submitted on an AF Form 3000 prior to using for approval by Engineer in charge. General contractor shall be on site to accept, unload and sign for all materials delivered to the work site. EADS shall have 5 business days to review and approve all material submittals. Any agents, cleansers, or chemical materials must be submitted prior to using for approval by Engineer in charge with Safety Data Sheet (SDS) sheets for each product used.
6. GENERAL CONDITIONS:
Contractor and all personnel shall comply with the OSHA, NEC, NFPA, ASTM D975 and ASTM D4176 Standards. Contractor shall protect all government property (Personnel, Buildings, Foliage, Grounds) while work is in progress.
Contractor shall have a spill protection plan to protect and prevent and contaminating spills. Contractor shall be 100% responsible for any clean-up cost associated with any fuel spills. Contractor shall work with the timeline of EADS. Prime General Contractor shall be on site at all times with a site supervisor for all sub-contractor’s supervision. Low Price with best Technical Plan will be selected as bid winner. Technical plan shall consist of a general timeline of project and a written narrative of how you plan on executing the actual work, what parts of the job will you subcontract out and what parts of the project your company will execute.
7. GOVERNMENT WORKING HOURS:
Work hours shall be Monday thru Friday 0700-1530 hours, with the exception of Federal holidays. Due to EADS 24/7 Mission, the contractor may need to work outside these hours to include weekends. Contractor must have prior approval in writing to work outside these guidelines and must coordinate with the Engineer in charge.
8. UTILITIES:
The Government shall provide at no cost to the Contractor reasonable amounts of water and electricity to support the contract. Hook up will be to existing outlets and will be the contractor’s responsibility.
9. DISPOSAL OF MATERIALS AND CLEANUP:
The contractor shall dispose of all containment debris associated with this job off base and provide valid documentation of disposal. Contractor shall clean up after each work period and dispose of all debris at the close of each day.
· Contractor shall verify all site conditions, quantities, measurements, and project requirements before bidding or ordering materials.
· Contractor shall protect and barricade all work areas at all times to protect workers and the public from injury.
· Contractor shall protect all structures, utilities, vegetation, sidewalks and vehicles from damage at all times. Replace all damaged materials with new materials to the satisfaction of the Government, at no additional cost to the Government.
10. SECURITY:
· EADS Security Forces shall monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the Engineer to arrange for their entrance into the compound.
· The contractor shall submit a list of all personnel names, copy of valid driver’s license within one week after award of contract. Any personnel that will work onsite shall be vetted through EADS security. No one will work on site until a background check is completed and personnel cleared. If at any time the contractor submits additional names for clearance, EADS security will require at least 48 hours’ notice to clear individual.
· All Contractor personnel shall have a minimum of one (1) Form of Photo Identification with them at all times.
· OPSEC Training – Contractor will be briefed in Preconstruction conference.
11. CONTRACT REQUIREMENT PACKAGE ANTITERRORISM / OPERATION SECURITY / INFORMATION PROTECTION REVIEW:
· The following reference the requirements on the Contract Requirements Package Antiterrorism / Operation Security / Information Protection Review Coversheet Form AOI-RC v3.1 that have been identified by the base review team.
· Purpose of Cover Sheet: To document the review of the requirements package Statement of Work (SOW) or Performance Work Statement (PWS) Quality Assurance Surveillance Plan and any applicable source selection evaluation criteria for antiterrorism (AT) and other related protection matters to include, but not limited to: Operations Security (OPSEC), Information Assurance (IA)/Cyber Security, Physical Security, Law Enforcement, Intelligence, Foreign Disclosure.
· Standard Contract Language Provision/Contract Clause Text Applicability and/or Additional SOW or PWS Language: Below is the standard contract or clause language found on this form that is sufficient to meet specific contract request requirements.
1. Access and General Protection Policy and Procedures: This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1a. Reserved
1b. For Contractor not eligible for CAC; requires access to DoD Facility/Installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
2. Reserved
3. Reserved
12. ESCORTS:
A security briefing will be conducted prior to the start of the contract.
Escorts will be provided.
13. SITE VISIT:
One (1) site visit will be scheduled with date and time determined when solicitation issued. Contractors will meet at EADS Building 703, 366 Otis St., Griffiss Business and Technology Park, Rome, New York 13441-4805. Call Mr. Ricky Accardi, (315) 233-2130, if you plan to attend site visit.
14. POINT OF CONTACT:
Mr. Jonathan Jock, Engineering Services (315) 334-6731.