SOW_Fort_Barrancas_Entrance_Trail_Pavement_Preservation.pdf
PDF 3 MB Posted
- Attached to
- Asphalt Seal Coat, Paving, and Striping Projects Federal contract opportunity
- Solicitation number
- 140P5222Q0033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5222Q0033_Amd_0001.pdf | ||
| Site_Visit_Sign-In_0001.pdf | ||
| B12_Pre-Bid_Inquiry_and_NPS_clarifications_response_0001.xlsx | XLSX spreadsheet | |
| BID_BOND_SF_24-16d_0001.pdf | ||
| SPECS_FL_DOT_SSFRABC_January-2022-redline-ebook.pdf | ||
| DOL_WD_FL20220165_02-25-2022.pdf | ||
| Sol_140P5222Q0033.pdf | ||
| SOW_Advance_Redout_Road_and_Parking_Area_Pavement_Preservation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gulf Islands National Seashore Gulf Breeze, FL
STATEMENT OF OBJECTIVES:
Pavement Preservation on Ft Barrancas Entrance Trail
PMIS #188258 PEPC #40422
DATED: August 2021
NATIONAL PARK SERVICE
STATEMENT OF OBJECTIVES (SOO)
SOO Format
1. Background
2. Objectives
3. Place of performance
4. Period of performance
5. Scope
6. Safety
7. Tasks
8. Delivery
9. Government-Furnished Property (GFP)
10. Security Considerations
11. Special Material Requirements
12. Other Unique Requirements and Considerations
13. Quality Assurance Requirement
14. Project Personnel
15. Invoices and Payments
1. BACKGROUND
Gulf Islands National Seashore (GUIS) is a unit of the National Park Service and is head quartered in Gulf Breeze, FL. High on a bluff overlooking the entrance to Pensacola Bay, Fort Barrancas stands as a monument to the legacy of America’s early homeland defense. Built with 6 million bricks, walls 4 feet thick and 20 feet high, Fort Barrancas was completed in 1844 and remains an example of military engineering and a marvel of human ingenuity.
2. OBJECTIVES:
The work of this contract consists of providing all labor, equipment, supervision and materials to accomplish pavement preservation to include crack sealing, surface sealing and re-striping of the Fort Barrancas Area Entrance trail and parking area (estimated 21,942 sq ft). This area will need cracks cleaned and sealed before applying surface sealer.
3. PLACE OF PERFORMANCE:
Gulf Islands National Seashore, Fort Barrancas Area, 3182 Taylor Road, Pensacola, FL 32508.
4. PERIOD OF PERFORMANCE:
All work specified herein shall commence after the notice to proceed is received from the Contracting Officer, and completed with-in a 3 month (90 day) period.
5. SCOPE:
In accordance with the terms and conditions herein, the prime contractor or his sub-contractors shall perform the work of this contract for the National Park Service (NPS).
The contractor will complete the following items:
1. Contractor will provide all material, equipment, parts and labor required to perform all of the work of this contract:
2. All equipment, material and waste removed or generated by work of this contract shall be properly disposed of offsite by the contractor.
3. Contractor shall verify the quantity of materials needed to complete the task identified in this SOO.
4. Contractor will provide a work site and environment that is safe for employees, for visitors to the
Park, and NPS staff. If needed, the work area will be cordon off and secure.
5. All work will be performed Monday through Friday from 7:00 am until 3:30 pm. No work will be performed on weekends or federal holidays without prior approval.
6. Contractor and employee parking and equipment storage areas will be designated by the Park. No company signs shall be installed on government property. Smoking and eating will be performed in areas designated by the Park. Employees shall wear appropriate clothing at all times.
7. Contractors will notify NPS staff of scheduled site visits to ensure access to secure areas.
8. The Davis-Bacon Act applies for this contract.
6. SAFETY:
All work performed on government property will be accomplished in accordance with OSHA, EPA, Federal, State and local regulations and requirements. Prior to starting work on government property, the contractor will submit to Gulf Islands National Seashore for approval a copy of their company safety plan pertaining to this particular contract. Although not all inclusive, the safety plan must address at a minimum the following areas:
1) Heavy equipment operations (if required)
2) Fall Protection Plan
3) Public/visitor safety (barriers/signage, etc…)
4) Traffic safety plan (if required)
5) Trenching/sloping of soil (if required)
6) Personal protective equipment to be used
7) Hazardous materials (HAZMAT) to be used
a. Copies of Safety Data Sheets (SDS) must be provided to the Park
b. Storage of HAZMAT
8) Emergency response protocols
9) Personnel training requirements
10) OSHA DART rate
a. OSHA 300A Summary for last three years
Contractor shall use “green” products whenever possible and all HAZMAT must be pre-approved for use by the GUIS Collateral Duty Safety Coordinator. The contractor will be responsible for the safety and security of the site to ensure unauthorized personnel (park visitors & employees) do not enter the construction area.
7. TASKS:
COMMUNICATION
A). Contractor shall notify the Contracting Officer’s Representative (COR) between 7:00 and 7:15 am on the morning work will be performed or inform the COR why services cannot be performed that day. The COR is Hank Reynolds, cell phone: 850-281-2165.
B). Work shall be performed during daylight hours between 7:00 am and 3:30 pm Monday through Friday as per the established schedule. Weekend and holiday work will not be permitted, unless due to inclement weather, equipment problems, etc. or with the prior approval by the park COR or Contracting Specialist.
C). Schedule changes MUST be cleared through the COR or Contracting Officer
SPECIFIC REQUIREMENTS
All work must meet U.S. Department of Transportation, Federal Highway Administration, Federal Lands Highway (FP-14) Specifications. Parking lot striping must meet ADA-ABAAS requirements.
Contractor must confirm all measurements.
GERERAL PROVISIONS
This work area is located within the Fort Barrancas Area of Gulf Islands National Seashore.
1. Fort Barrancas Entrance Trail/Parking Area (estimated 21,942 sq ft).
Seal existing cracks Apply Surface sealer
Reapply thermo plastic striping to all existing pavement markings. Contractor is responsible for recording all existing pavement markings with sufficient detail (lengths, widths, symbols, and/or letters, etc.) prior to asphalt work/repairs. All pavement markings shall comply with Manual on Uniform Traffic Control Devices (MUTCD) and ADA-ABAAS requirements.
WEATHER
Contractor shall notify the COR by 7:00 am of any intention to cancel work for the day due to weather.
8. DELIVERY:
All deliverables required to complete this project will be delivered by the contractor.
• All labor, materials, tools and equipment to re-stripe current parking areas
• All labor, materials, tools and equipment to provide crack sealing
• All labor, materials, tools and equipment to provide Surface seal
• Safety plan
• Proof of Insurance
9. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION
(GFP, GFM, GFE, OR GFI):
None.
10. SECURITY:
The information developed under this Statement of Objectives is the property of the U.S.
government and shall be kept in strict confidence. Proprietary or copyrighted material may not be included into the contract information CDs unless otherwise approved in writing by the Contracting Specialist.
11. SPECIAL MATERIAL REQUIREMENTS:
1. DEFINITIONS:
a. Asphalt Crack Seal: A mixture of materials that will form a resilient and adhesive compound capable of effectively sealing cracks in asphalt against infiltration of moisture throughout the repeated cycles of expansion and contraction with temperature changes, and will not flow from crack or be picked up by vehicle tires at ambient temperatures as defined in ASTM D6690.
b. Asphalt Seal Coat: Application of a thin layer of bituminous material (emulsified asphalt) on an existing surface to form a continuous watertight barrier.
2. REQUIREMENTS:
a. The Contractor shall comply with the manufacturer’s specifications and recommendations for cleaning, primer coats, temperature restrictions, application methods, and curing time.
3.. DESCRIPTION OF BID ITEM: “Crack Seal” GENERAL: Contractor shall provide all materials, equipment, and labor to complete the work as described herein.
Crack seal work includes:
a. Preparing the existing asphalt surface by cleaning it free of loose material, dirt, vegetation, dust, and debris.
b. Cleaning and filling all cracks 1/8-inch or larger in the existing asphalt using approved asphalt crack seal material. Crack seal asphalt repair shall include the joints between asphalt and concrete pavement sections. Cracks 1/2-inch and 1 ½ inches wide shall be filled with clean and dry sand prior to applying crack seal material. Cracks larger 1 ½ inches shall be filled with mastic.
4. MATERIAL:
a. Crack seal material shall meet the requirements of ASTM D6690 Table 1. 3.
5. PREPARATION:
The crack and surface area for at least 6-inches on both sides of the crack shall be cleaned of foreign matter and loosened particles with compressed air to a depth of twice the crack width.
Cleaning shall be performed using a hot compressed air lance. This lance shall be used to dry and warm the adjacent asphalt immediately prior to sealing. Direct flame dryers shall not be used. Follow the guidelines in the appendix of ASTM D6690 and those published by the manufacturer.
6. APPLICATION/INSTALLATION:
a. All cracks with a width larger than 1/8-inch and less than 1/2-inch shall be filled with hot poured joint and crack sealant flush with the pavement surface.
b. Immediately after filling the crack, any excess sealant shall be leveled off to within 1/8-inch below pavement surface by squeegee, a shoe attached to the applicator wand, or other suitable means approved by the COR. The squeegee shall be centered on the crack. Excess material on either side of the crack shall not exceed 3-inches in width or 1/16-inch in depth.
c. Sealant material picked up or pulled out after being placed shall be replaced by the Contractor at no expense to the Government. The Contractor shall have blotter material available on the project in the event it is required to prevent tracking or pulling. It must be placed in high traffic areas and drives to parking areas. If required, blotter material shall be approved by NPS and placed at the Contractor’s expense.
d. All cracks 1/2-inch and larger in width shall be filled with clean sand to a point approximately 1/2 to 1/4-inch below the adjacent pavement surface, and tamped lightly with a steel rod or piece of rebar to reduce any voids in the sand. Apply crack seal over the top of the sand and along the crack surface as described above.
e. Application Temperature:
1) The face of the crack shall be dry. The air and pavement temperature shall both be at or above 50 F and rising at the time of crack seal application unless otherwise authorized by the
COR.
2) The temperature of the sealant material shall be in accordance with the manufacturer’s recommendations. The heating equipment shall be equipped with a calibrated thermometer capable of ±5 F accuracy from 200 F to 600 F unless otherwise authorized by the COR.
This thermometer shall be located so the Inspector can safely check the temperature of the sealant material. Overheating of the material will not be permitted.
3) The cracks and surface must be completely dry prior to any application. A minimum of three days of dry weather must have occurred just prior to application. If three days of dry weather cannot be obtained, the crack must be thoroughly dried and accepted by the COR.
Seal Coat work includes:
a. Cleaning entire surface and cracks 1/8-inch wide or less of loose sand, dust, rock, mud, and all other debris.
b. Applying asphalt seal coat over the existing asphalt pavement surface.
7.PREPARATION:
a. Treat existing asphalt cracks and asphalt repairs as prescribed above in previous sections.
Do not install seal coat until crack seal treatment and new asphalt sections have completely cured.
b. The entire asphalt surface shall be free of debris, particles, gravel, dirt, and dust. Parking blocks shall be removed as well (and reinstalled after seal coat). The area shall be swept clean using hand brooms, through the use of approved mechanical sweepers, or compressed air equipment. The surface shall be dry at the time of application of seal coat materials. Direct flame dryers shall not be used. Water flushing shall not be used in areas where cracks are present. Follow the guidelines in the appendix of ASTM D6690 and those published by the manufacturer.
c. After any crack seal treatments and before applying seal coat, clean the existing pavement surface, including the removal of oil and grease spots. If cleaning pavements with detergents, thoroughly rinse with water, and allow surface to dry completely prior to applying seal coat.
d. If after cleaning existing surface oil and grease spots remain, use an oil seal primer and apply per manufacturer’s instructions. Oil seal primer shall be applied uniformly and at a constant rate per square yard to areas where residual oils, petroleum grease, and gasoline are visibly noticeable after surface preparation.
e. Cover all manholes (sewer and storm covers), valves, hydrants, drains and other objects that do not need to be sealed.
8. APPLICATION/INSTALLATION:
a. Place seal coat when ambient air and pavement temperature are both at or above 60 F and rising and when the relative humidity is less than 75 percent unless otherwise authorized by the
COR.
b. The asphalt seal coat material shall be installed at a minimum depth of 1/8–inch over the entire asphalt pavement area. Mix and install in accordance with manufacturer’s instructions.
Cracks and voids shall be filled as much as possible to ensure an even smooth finish surface.
c. The Contractor shall allow a minimum 24 hour cure time prior to sweeping.
d. Reinstall parking blocks (if applicable) in the same locations after seal coat is completely cured/dried..
12. OTHER UNIQUE REQUIREMENTS:
All closures must be coordinated with the COR or CO at least two weeks before closure begins. All work must be completed in a timely manner as to reduce duration of closures. Roadway must remain passable to allow government employees access prior to sealing if possible.
Measures shall be put in place to prevent spills of crack seal, asphalt and sealcoat materials from entering storm drains or other pathways to water. All crack seal, asphalt, and sealcoat materials shall be stored away from storm drains or other pathways to water.
Parking lot striping must meet ADA-ABAAS requirements.
All work must meet U.S. Department of Transportation, Federal Highway Administration, Federal Lands Highway (FP-14) Specifications. Parking lot striping must meet ADA-ABAAS requirements.
Chapter 5: Parking Spaces (access-board.gov):
· The term "parking facility" is used Section 208.2 instead of the term "parking lot" so that it is clear that both parking lots and parking structures are required to comply with this section. The number of parking spaces required to be accessible is to be calculated separately for each parking facility; the required number is not to be based on the total number of parking spaces provided in all of the parking facilities provided on the site.
· For every six or fraction of six parking spaces required by 208.2 to comply with 502, at least one shall be a van parking space complying with 502.
· Car parking spaces shall be 96 inches (2440 mm) wide minimum and van parking spaces shall be 132 inches (3350 mm) wide minimum, shall be marked to define the width, and shall have an adjacent access aisle complying with 502.3.
o EXCEPTION: Van parking spaces shall be permitted to be 96 inches (2440 mm) wide minimum where the access aisle is 96 inches (2440 mm) wide minimum.
· Access aisles serving parking spaces shall comply with 502.3. Access aisles shall adjoin an accessible route. Two parking spaces shall be permitted to share a common access aisle.
· Parking spaces complying with 502 that serve a particular building or facility shall be located on the shortest accessible route from parking to an entrance complying with 206.4. Where parking serves more than one accessible entrance, parking spaces complying with 502 shall be dispersed and located on the shortest accessible route to the accessible entrances. In parking facilities that do not serve a particular building or facility, parking spaces complying with 502 shall be located on the shortest accessible route to an accessible pedestrian entrance of the parking facility.
o EXCEPTIONS: 1. All van parking spaces shall be permitted to be grouped on one level within a multi-story parking facility.
· Parking spaces shall be permitted to be located in different parking facilities if substantially equivalent or greater accessibility is provided in terms of distance from an accessible entrance or entrances, parking fee, and user convenience.
· Total number of parking spaces & minimum number of accessible parking spaces:
o 1 to 25 =1 accessible o 26-50 =2 accessible
· Accessible spaces must be identified by signs with the International Symbol of Accessibility (ISA) (§703.7.2.1). Signs identifying van spaces must include the term “van accessible.” This designation is informative and does not restrict use of such spaces to van users only. No other text or content is required by the Standards.
· Signs must be at least 60” high measured to the bottom edge so that they are visible while vehicles are parked in a space. Signs can be on posts, or where feasible, on walls or suspended from ceilings (an 80” minimum headroom clearance is required at signs suspended above circulation paths (§307.4)). ISA designations on the parking surface, even if required by a state or local government, cannot substitute for above-ground signs that remain visible at all times.
· State or local codes and regulations may address other sign characteristics, including size, color, and additional content, such as “reserved” or violation fines, but the ABA Standards do not.
NPS will install and/or replace any signage.
13. QUALITY ASSURANCE REQUIREMENT:
The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with the statement of work.
Prior to issuance of Notice to Proceed, the Contractor shall be required to submit to the CO/COR the following items (Electronic submission in PDF or MS Office format is acceptable):
• Safety plan (see FAR clause 52.236-13 (f)(1) for details)
• Proof of Insurance (see FAR clause 52.228-5 for details)
• Alternate Payment Protection (See FAR clause 52.228-13 for details)
• Work Plan/Schedule (see FAR clause 52.236-8 and 52.236-15 for details)
14. PROJECT PERSONNEL:
Contracting Officer (CO):
Andre Ward C: 850-232-4630 Email: andre_ward@nps.gov
Contracting Officer Representative (COR):
Hank Reynolds Facility manager C: 850-281-2165 Email: joseph_h_reynolds@nps.gov
Chief of Facility Management (CFM):
Gary Stansberry Chief of Facilities O: 850-934-2610 C: 850-232-3625 Email: gary_stansberry@nps.gov
15. INVOICES AND PAYMENTS:
52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) The Government shall pay the Contractor, upon the submission of proper invoices for construction material delivered and or services rendered and accepted, less any deductions mailto:joseph_h_reynolds@nps.gov mailto:gary_stansberry@nps.gov provided in this contract. Unless otherwise specified in this contract, progress payment shall be made by the Government monthly (progress) or final (completion of work) if—
(a) The amount due on the deliveries warrants it; or
(b) The Contractor requests it and the amount due on the deliveries is at least $1,000 or 50 percent of the total contract price.
(End of clause)
Adjustment for Inadequate Performance
• Well maintained buildings are the National Park Service’s goals. Routine inspection shall be performed to minimize work improperly performed. Such inspections are designed only to assure that the NPS pays only for those services, which have been specified, and adequately completed by the contractor.
• In the event the contractor fails to successfully perform the required work, the National Park Service has the right to withhold partial payment (see FAR clause 52.232-5
(e) Retainage and or 52.246-12 (f) appropriate adjustment in contract price).
16. PHOTOS:
ADA-ABAAS requirements:
Total Number of Minimum Number of
Parking SpacesProvided in Parking Facility Required accessible Parking Spaces
1 to 25 1
26 to 50 2
51 to 75 3
76 to 100 4
101 to 150 5
151 to 200 6
201 to 300 7
301 to 400 8
401 to 500 9
501 to 1000 2 percent of total
1001 and over 20, plus 1 for each 100, or fraction thereof, over
The term "parking facility" is used Section 208.2 instead of the term "parking lot" so that it is clear that both parking lots and parking structures are required to comply with this section. The number of parking spaces required to be accessible is to be calculated separately for each parking facility; the required number is not to be based on the total number of parking spaces provided in all of the parking facilities provided on the site.
For every six or fraction of six parking spaces required by 208.2 to comply with 502, at least one shall be a van parking space complying with 502.
Car parking spaces shall be 96 inches (2440 mm) wide minimum and van parking spaces shall be 132 inches (3350 mm) wide minimum, shall be marked to define the width, and shall have an adjacent access aisle complying with 502.3.
EXCEPTION: Van parking spaces shall be permitted to be 96 inches (2440 mm) wide minimum where the access aisle is 96 inches (2440 mm) wide minimum.
Access aisles serving parking spaces shall comply with 502.3. Access aisles shall adjoin an accessible route. Two parking spaces shall be permitted to share a common access aisle.
Parking spaces complying with 502 that serve a particular building or facility shall be located on the shortest accessible route from parking to an entrance complying with 206.4. Where parking serves more than one accessible entrance, parking spaces complying with 502 shall be dispersed and located on the shortest accessible route to the accessible entrances. In parking facilities that do not serve a particular building or facility, parking spaces complying with 502 shall be located on the shortest accessible route to an accessible pedestrian entrance of the parking facility.
EXCEPTIONS: 1. All van parking spaces shall be permitted to be grouped on one level within a multi-story parking facility.
2. Parking spaces shall be permitted to be located in different parking facilities if substantially equivalent or greater accessibility is provided in terms of distance from an accessible entrance or entrances, parking fee, and user convenience.
| Statement of OBJECTIVES (SOO) |
| 1. Background |
| 2. Objectives: |
| 3. Place of Performance: |
| 4. Period of Performance: |
| 5. Scope: |
| 6. Safety: |
| 7. Tasks: |
| 8. Delivery: |
| 9. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI): |
| 10. Security: |
| 11. Special Material Requirements: |
| 12. Other Unique Requirements: |
| 13. Quality ASSURANCE Requirement: |
| The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non... |
| 14. Project Personnel: |