This is a Statement of Work (SOW) for the procurement of neutron proportional counters for NIST's POLAR (polarizing cold neutron triple axis spectrometer) instrument project. The National Institute of Standards and Technology Center for Neutron Research (NCNR) is procuring eighty-five (85) neutron proportional counters with 8 mm outer diameter and 150 mm active length to line the analyzer housing of the POLAR spectrometer. The counters must be new, not used or remanufactured, with stainless steel tube bodies, flying lead anode connections of at least 610 mm, and 90% target sensitivity for 5 meV neutrons using 3He detection gas with CO2 and Ar quench gases. The contractor must submit a firm-fixed price quotation and provide design drawings, bill of materials including lead times, cutsheets, specifications, wiring diagrams, and manuals for COR approval prior to manufacturing.
Deliverables include a contractor point of contact document within one week after receipt of award (ARO), initial and final design drawings within three weeks ARO, a bill of materials within two weeks after design acceptance, and delivery of all eighty-five neutron proportional counters no later than four months ARO. Delivery is FOB Destination to NIST's Center for Neutron Research facility in Gaithersburg, Maryland, with the contractor bearing all shipping costs and responsibility for loss or damage prior to acceptance. The contractor must provide a one-year manufacturer warranty covering all parts and labor at no additional cost to the government, with warranty commencing upon government acceptance. Payment will be made within 30 days of receipt and acceptance of proper invoices submitted after system acceptance by the government; advance payment, partial shipments, and partial invoices are not authorized unless pre-approved by the Contracting Officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003.docx | DOCX document | |
| Amendment 0002.docx | DOCX document | |
| Amendment 0001.docx | DOCX document | |
| Provisions_Clauses.docx | DOCX document | |
| CSS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Title: POLAR detectors Requesting Lab: National Institute of Standards & Technology (NIST) Center for Neutron Research (NCNR), Research Facility Operations (RFO) Group
BACKGROUND
The National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) owns and operates a 20 MW test reactor called the National Bureau of Standards Reactor (NBSR). The NBSR is located on the NIST campus in Gaithersburg, Maryland, USA. The NBSR is a heavy water D2O-cooled and moderated reactor. The NCNR is in the process of building a state of the art polarizing cold neutron triple axis spectrometer for the study of solid state materials. Neutrons produced in the reactor are monochromated and collimated and directed to the sample under test. Neutrons scattered from the sample are analyzed by a multi blade crystal analyzer and diffracted into an array of neutron detectors for tabulation. These detectors will line the inside of the analyzer housing and will enable this instrument to simultaneously collect neutrons from a wide band of energies. The current design for the POLAR analyzer calls for 85 neutron proportional counters of 8 mm diameter and 150 mm active length to line the analyzer housing.
OBJECTIVE
This procurement will supply NCNR and the POLAR instruments with neutron detectors required to measure scattered neutron radiation.
SCOPE
The Contractor shall supply and deliver eighty-five (85) neutron proportional counters inclusive of FOB Destination delivery terms (or equivalent INCOTERMS) and 1-year warranty.
MINIMUM REQUIREMENTS
The Contractor shall submit a firm-fixed price quotation which meets or exceeds the requirements identified in this document. Offerors shall submit a quotation addressing the required specifications and shall provide descriptive literature, as required, to fully demonstrate how the proposed equipment will satisfy the requirements. All items shall be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
The Contractor shall draft and submit a Bill of Materials for all materials intended to be fabricated. The Bill of Material shall include current delivery lead times, cutsheets, specifications, wiring diagrams, and manuals for NIST to review and accept the proposed parts. COR approval for all items shall be received by the Contractor prior to procuring items for this project.
The Contractor shall provide contact information for its designated main point of contact/Project Manager (i.e., Work Phone, Cell Phone, and email).
Line-Item 0001 Description: Neutron Proportional Counters, including Contractor POC Information, and Bill of Materials Spec Sheet with Lead Time Quantity: Eighty-Five (85) Neutron Proportional Counters
A. Technical Requirements
a. Mechanical. The neutron proportional counters shall have an outer diameter of 8 mm and an active length of 150 mm (5.9055 inches). The tube body shall be stainless steel.
b. Electrical. The anode connection shall be a flying lead of a length at least 610 mm (24 inches)
c. Sensitivity. The target neutron sensitivity is 90% for 5 meV (4 Å) neutrons. The detection gas shall be 3He with CO2 and Ar quench gases.
B. Design Drawing
a. Drawing must include the tube and the cable, with the associated dimensions specified for each part. The initial drawing will be submitted to the NIST TPOC for review and approval. The Contactor must have NIST approval of the drawing prior to manufacturing the counters or it is at contractor risk.
DELIVERABLES
| Line-Item Number |
| Description |
| Quantity |
| Lead Time |
| 0001 |
| Neutron proportional counters inclusive of contractor point of contact document and bill of materials spec sheet with current lead time |
| Eighty-five (85) |
| Neutron Proportional Counters: No Later Than (NLT) Four (4) Months After Receipt of Award (ARO) |
Contractor POC Document: No later than one (1) week ARO
| 0001 |
| Bill of Materials for all materials intended to fabricated. The Bill of Material shall include current delivery lead times, cutsheets, specifications, wiring diagrams, and manuals. |
| One (1) |
| No later than two (2) weeks after acceptance of final design. |
| 0002 |
| Design Drawings |
| One (1) initial draft |
One (1) final drafts No later than three (3) weeks after receipt of order.
Standards for Acceptance of Deliverables The NIST TPOC will provide written or electronic comments on each deliverable within Ten (10) calendar days from receipt of a given deliverable. The Contractor shall make any needed changes and resubmit the deliverable within Ten (10) calendar days from receipt of electronic or written comments from COR. The COR will provide written notification via email when a deliverable is accepted.
DELIVERY TERMS
F.O.B. Destination.
FOB Destination means: The Contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order, and pay all charges to the specified point of delivery. The Contractor shall deliver all Line Items to:
National Institute of Standards and Technology (NIST) Center for Neutron Research 100 Bureau Drive Building 301 (shipping & receiving) C/O TBD Bldg. 235 Gaithersburg, MD 20899
WARRANTY
The manufacturer warranty for equipment is required. The Contractor shall warrant for one (1) year. All costs including parts, labor, travel, and other expenses necessary to perform repairs on warranty work will be the responsibility of the contractor at no additional cost to the government. Warranty is in accordance with terms in FAR 52.212-4. Warranty shall commence upon acceptance of the work by the Government.
PAYMENT SCHEDULE
Advanced payment is not authorized. Services shall be invoiced for in the arrears. The Contractor shall be paid in accordance with NET 30-day payment terms upon receipt and acceptance of a proper invoice. An invoice shall be submitted in accordance with the billing instructions provided in the purchase order and after the system has been accepted by the Government.
NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer. Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration