This solicitation is for the construction of two colony houses for the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery. The project magnitude is between $500,000 and $1,000,000. Competition is set aside for small businesses under NAICS code 236220 for commercial and institutional building contractors. Prospective offerors must complete blocks 14, 15 and 19 and be registered with SAM with an active registration. The solicitation number is 12405B23Q0334.

Text of this file

file_0.png file_1.wmf

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Build Two New Colony Houses

Poultry Production & Product Safety Research Center, 1471 W. Knapp Street, Fayetteville, AR 72704

Everett Wilson Date: 4/30/2023

STATEMENT OF WORK

CONTRACT PROJECT:

Project Title: “Build Two Colony Houses at the USDA, ARS, Poultry Production & Product Safety Research Center, 1471 W. Knapp Street, Fayetteville, AR 72704

PROJECT CONTACT PERSONS:

Scott Zornes Location Contact / Biological Science Technician 1471 W. Knapp Street Fayetteville, AR 72704 Phone: 479-790-7097 scott.zornes@usda.gov

Raeann Braithwaite Administrative Officer 2890 Highway 130 E Stuttgart, AR 72160 Phone: 870-673-4483 x223 raeann.braithwaite@usda" raeann.braithwaite@usda

Everett Wilson Engineering Project Manager/COR 3550 Main Street, #5121 Houston, TX 77002 everett.wilson@usda.gov" everett.wilson@usda.gov Phone: 720-618-0703

SCOPE OF SERVICES:

The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.

The Contractor shall provide services for the following tasks marked by an “X”:

[X] Provide a cost proposal to complete the project as per project requirements.

[X] Provide and install all material to complete the project as per project requirements.

PROJECT REQUIREMENTS:

The turnkey project will be to build two new Colony Houses identical to the two existing houses using the supplied drawings as the design. The only difference between the existing Colony Houses and the drawings is that the existing two Colony Houses have had the roof replaced with standing seam metal roofs as opposed to the asphalt roofing in the design drawings. The two new Colony Houses will have standing seam metal roofs of the same profile and color as the two existing buildings. The two new Colony Houses will be constructed identical to the existing two per the attached design drawings and the existing structures. The HVAC units in the two new Colony Houses shall match the existing AAON* Self Contained HVAC units in Building #1 and Building #2. The new buildings will utilize the existing electrical, water and sanitary utilities/systems on the site. The new buildings will be constructed beside the existing two buildings as shown in the attached photograph and will be connected to the existing concrete paths by extension of the concrete paths to each of the new buildings.

*The HVAC Units must be Energy Star Rated and have high efficiency to comply with Government requirements. The unit(s) to be supplied in the project are AAON units as shown in the site pictures in this SoW. The new unit(s) will be to the exact same, or superior, specifications that meet current Federal Energy Star requirements and the unit(s) to be supplied will be manufactured by AAON (or approved equal or superior brand name manufacturer). Lab preference is for identical units to be installed for ease of maintenance.

The Contractor shall furnish a turnkey cost proposal to provide services to include, but not be limited to, all required materials, labor, freight, permits as required for the successful completion of the projects.

The Contractor will work with site personnel to ensure project is accomplished in a timely manner.

Materials and Installation shall meet the applicable sections of the Uniform Federal Guide Specifications (UFGS).

The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal (USDA Natural Resources Conservation Services), and local code requirements as well as current industry standards, (i.e.: UBC, IBC, ASTM, etc.) and health and safety codes, in effect at the time of contract award.

Davis Bacon Wage Rates apply to all construction contracts more than $2,000. Employee payroll logs for the project will be required to verify wage rates are being adhered to.

Payment, bid or other bonds may be required per the Contracting Officer’s bid package. Obtaining and the cost of these bonds is the responsibility of the Contractor. Proof of Insurance is also required.
Shutoff of utilities shall be scheduled no less than ten working days in advance and coordinated with the location contact.

The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work.

Clean up all debris from construction sites once job is completed.

Contractor will schedule work with location to allow location to meet current research needs. Research in the existing two Colony Houses cannot be impacted by new construction activities.

BID SCHEDULE:

The Bid shall include all work described in the project requirements and conform to the design drawings of the existing Colony Houses.

Pre-Construction Phase Services

Pre-Construction Submittals

Prior to Construction NTP the following submittals must be submitted to the Contracting Officer (CO) for approval:

Work Hours, per Section H.30 entitled, MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE. The work hours will include the daily start and stopping time, and days of the week the Contractor proposes to carry out the work.
Construction Cost Proposal presented in a cost break-out format

resembling a Schedule of Values will be submitted in MS Excel with all formulas intact and not protected. Written work proposal will be submitted in MS Word.

Submittal Register following 6.4 Submittals (below).

Quality Control Plan.
Environmental Protection Plan. – Not Required.
Accident Prevention Plan/Safety Plan.
The construction contractor (CC) shall provide to the CO a list of contract personnel of the general and subcontractors, who will be emergency contacts, including address, and telephone numbers for use in an emergency. As changes occur and additional information becomes available, the CC shall update the list.
Contractor must always have a superintendent on the job when working on this project certified per Contractors SSSP/APP. It is acceptable to utilize any Subcontractors Superintendent if certified and included in SSS/APP.

Base Bid

Contractor shall construct one Colony House per the existing design drawings besides the existing Colony House #`1 and tie into the existing electrical, water and sanitary systems.

Option 1 Bid

Contractor shall construct one additional Colony House opposite the first new Colony House and beside the existing Colony House #2 per the existing design drawings and tie into the existing electrical, water and sanitary systems.

Government Furnished Equipment\Services

The Government will be available to assist with the identification of possible utilities but does not guarantee location of all utilities.

The Government will furnish a reasonable amount of electricity and water.

GENERAL REQUIREMENTS:

Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

Existing Installations / Demolition:

Contractor shall coordinate the construction of the new units with Lab Personnel.
All disturbances of existing systems shall be thoroughly coordinated with Lab Personnel to prevent disconnecting equipment that might jeopardize on-going research.
ARS reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Owner prior to starting demolition operations.
Contractor shall legally dispose all equipment / materials removed that will not be retained.

Contractor shall divert project waste to recycle where practical. The Contractor shall track and document the amount of waste diverted to recycle. The Contractor shall submit diversion documentation as part of closeout. If no waste is diverted to recycle, the Contractor shall submit a letter stating this and why diversion was not practical.

Installation: It shall be the responsibility of the Contractor to complete work in accordance with the manufacturer’s recommendations and Industry Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.

Submittals (Digital and Hard Copies):

Provide manufacturer’s descriptive literature/shop drawings for all materials to the COR, EPM, CO and RL for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for all building materials and equipment and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval. All material submittals to the RL, COR and EPM shall be electronic. All drawings to the RL, COR and EPM shall be full size as well as electronic in .pdf and current AutoCAD version format. All material submittals and drawings submitted to the CO shall be electronic.

Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.

Protection of Work and Property/Safety Requirements:

The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the COR.

Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
Contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.
All employees of the general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.
Submit training records of all such employees to the Contracting Officer for approval before the start of work.

Temporary Facilities:

Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during construction and shall repair or replace any items damaged through its own negligence.

Sanitary facilities shall be provided by the Contractor.
Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the COR fourteen working days prior to the need.

Materials and Equipment:

The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.

All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft, or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/COR.

Cleanup: The construction site shall be always kept clean and free of debris. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.

Warranty:

Submit data concerning the standard one-year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.

Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.

Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO FINAL PAYMENT (other documents may also be required):

General contractors one (1) year warranty on work.
All warranties from manufacturers covering materials and labor for all systems and components.
As-built drawings (provide at least updated drawing sketch information).
Release of liens.
Employee payroll\time sheets
Invoice
O&M Manuals, 2 hard copies
HVAC Startup Report

PROJECT SCHEDULE: The Contract time for this project is 180 calendar days after NTP.

PICTURES:

file_2.jpg file_3.wmf file_4.png file_5.wmf file_6.wmf file_7.png

Other files

File Type Posted
20220926121556.pdf PDF
20220926121645.pdf PDF
20220926121741.pdf PDF
20220926121619.pdf PDF
20220926120255.pdf PDF
20220926121442.pdf PDF
20220926120436.pdf PDF
20220926121802.pdf PDF
20220926121709.pdf PDF
20220926120651.pdf PDF
20220926121306.pdf PDF
20220926121430.pdf PDF
20220926121152.pdf PDF
20220926121526.pdf PDF
20220926120217.pdf PDF
20220926120750.pdf PDF
20220926121418.pdf PDF
20220926121511.pdf PDF
20220926121218.pdf PDF
20220926121732.pdf PDF
20220926121139.pdf PDF
20220926120541.pdf PDF
20220926120612.pdf PDF
Solicitation 12405B23Q0334.docx DOCX document
Attachment 3 - ARS-371.pdf PDF
Wage Determination.pdf PDF
Attachment 4 ARS-372.pdf PDF
12405B23Q0334.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .