SOW.pdf
PDF 133 KB Posted
- Attached to
- Chemung IRA - Driveway Renovation
- Solicitation number
- 2136985
- Issued by
- Chautauqua County, New York
About this file
This is a Scope of Work document issued by the Finger Lakes Developmental Disabilities Services Office (DDSO) of the New York Office for People with Developmental Disabilities (OPWDD) for driveway renovation services at the Chemung IRA facility located at 671 Wyncoop Creek Road, Chemung, NY 14825. The project scope includes removal of the existing asphalt driveway, repair of the substructure, and installation of new pavement according to blueprints and specifications designed by Aubertine & Currier dated January 9, 2026. The vendor must attend a mandatory site visit scheduled for July 23, 2026 at 10:00 am; bids will not be accepted from vendors who fail to attend or arrive late. Work must be completed within 90 days of award and performed Monday through Friday during hours to be determined. The project requires compliance with NYS Public Works prevailing wage requirements, and contractors must possess valid New York State Department of Labor registration with a Certificate of Registration at the time of bid submission. If required, the contractor must obtain a Highway Work Permit and Work Zone Traffic Control Plan from the NYS Department of Transportation prior to work commencement.
The bid price must include all materials, labor, disposal fees, and site cleanup, with final acceptance provided by the appropriate Maintenance Supervisor. Additional requirements include utility marking prior to excavation, a pre-work meeting with FLDDSO Operations and Maintenance staff to discuss safety protocols, submission of Safety Data Sheets to the Plant Superintendent before work begins, and coordination with the House Director and Plant Superintendent (Jim Colon, 585-335-4119) throughout the project. The contractor is responsible for any property damage caused during work performance and must ensure continuous daily cleanup, secure storage of all tools and materials, and strict adherence to smoking prohibitions at the residential site. The project is part of the NYS Public Works program; no specific contract term or renewal options are mentioned in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ.pdf | ||
| CP-FL-H1220-2026019_Driveway_Renovation_Designs_CHEMUNG.pdf | ||
| Approved for Construction-20260109_ChemungDriveway (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
DESCRIPTION:
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Driveway Replacement, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.
SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Furnish materials and labor to complete the driveway renovation following the
Blueprints and Specifications as designed by: Aubertine & Currier Dated: 1/9/2026.
2. If a Highway Work Permit, and Work Zone Traffic Control Plan is needed for the project, it shall be acquired by the awarded contracted vendor from NYS Department of Transportation and provided to the Point of Contact listed above before work can begin.
3. It is the winning bidders’ responsibility to have all underground utilities marked, prior to any excavation work.
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
Facility:
Chemung IRA 263-FLA-1220
Facility Address:
671 Wyncoop Creek Road Chemung, NY 14825
Point of Contact:
Jim Colon – Maintenance Supervisor 2
Contact Phone Number:
585-335-4119
Project Title:
Driveway Replacement
SCOPE: JC0096
Summary of Work:
Remove existing asphalt driveway, repair substructure, install new pavement.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
SITE VISIT
A site visit is mandatory. The site visit date is scheduled for July 23, 2026 at 10:00 am at the project site. All prospective bidders are encouraged to attend.
A. Lawn Damage/Property Damage
• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
• Personal vehicles are not to be parked on the grass.
• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
• Once the job has begun, it is to be worked on continuously until completed.
• If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
• Work must be completed within 90 days of receiving the purchase order.
C. House Safety
• The residence will be occupied during the job.
• The contractor must take all reasonable care to safeguard the residents and the staff.
• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.
• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.
• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.
| SCOPE OF WORK includes, but is not necessarily limited to the following: |
| 1. Furnish materials and labor to complete the driveway renovation following the Blueprints and Specifications as designed by: Aubertine & Currier Dated: 1/9/2026. |
| 2. If a Highway Work Permit, and Work Zone Traffic Control Plan is needed for the project, it shall be acquired by the awarded contracted vendor from NYS Department of Transportation and provided to the Point of Contact listed above before work can be... |
| 3. It is the winning bidders’ responsibility to have all underground utilities marked, prior to any excavation work. |
| 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. |
| 2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. |
| 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday. |
| 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. |
| 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. |
| 6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. |
| 7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. |
| 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. |