This Statement of Work (SOW) details Schneider Electric's maintenance and technical support services for NASA's National Center for Critical Information Processing and Storage (NCCIPS) facility. The contract covers support for Schneider Electric Power Logic Supervisory Control and Data (SCADA) and Power Monitoring Expert systems, with a total of six required deliverables including ESP Plan Ultra, PSO Support, Onsite Maintenance Visits, Training Subscription, and In-office Support. The maintenance contract is effective from 06/08/2025 through 06/07/2026, with all deliverables subject to review and approval by SAIC and NASA.
Key contract requirements include establishing a Non-Disclosure Agreement (NDA), ensuring all documents are labeled "Sensitive But Unclassified", and mandatory United States citizenship for personnel accessing the NASA Stennis Space Center and NCCIPS data center. The subcontractor must comply with local, state, and federal standards, as well as generally accepted engineering principles and NCCIPS/NASA standards. The SOW specifies that the subcontractor will provide a delivery schedule for each deliverable, which will be reviewed and approved by SAIC.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBCONTRACTOR
STATEMENT OF WORK (SOW)
FOR
Schneider Electric Maintenance and Technical Support
Date: May 15, 2025
1. Technical Scope
1.1 Overview
This Statement of Work (SOW) describes the scope and deliverables for Schneider to provide maintenance and technical support for our Schneider Electric Power Logic Supervisory Control and Data (SCADA) system and our Power Monitoring Expert system for the National Aeronautics and Space Administration (NASA) National Center for Critical Information Processing and Storage (NCCIPS) facility.
The scope of work includes onsite maintenance visits, remote technical support and training. These systems are critical to monitoring and data reporting of the electrical infrastructure throughout the NCCIPS campus.
This project shall be accomplished through the services of an SAIC subcontractor to complete the deliverables with specified scope described in Section 1.2.
1.2 Engineering Deliverables
This section describes the deliverables required. The subcontractor’s response shall include proposed pricing for the required deliverables and their proposed delivery dates. The response must have detailed explanation of cost with breakdown of estimated man hours and cost associated with labor, including providing the basis of these estimates. The following are the required deliverables:
Deliverables Quantity
ESP Plan Ultra 1 TOTAL
PSO Support 1 TOTAL
Onsite Maintenance Visits 6 Total
Deliverables Quantity
Training Subscription 1 Total
In office support 1 Total
The format of the response expected to this SOW is provided in Appendix A.
1.3 Non-Disclosure Requirements
This project requires the establishment and implementation of a Non-Disclosure Agreement (NDA) policy. All key subcontractor personnel shall be required to sign NDA forms and abide by all NDA requirements.
This project requires all electronic and hardcopy documents used and developed by the subcontracted electrical engineer to be securely maintained. All drawings and other documents developed by the subcontracted electrical engineer must be labeled as “Sensitive But Unclassified.”
At the end of this contract, electronic copies of all drawings and documents delivered to or developed by the subcontracted electrical engineer are to be submitted to SAIC.
1.4 Assumptions
The following assumptions apply to this SOW:
• All deliverables sahll be reviewed by SAIC subject matter experts.
• All deliverables require SAIC and NASA approval.
1.5 Applicable Standards
The subcontractor shall comply with all local, state and federal standards and adhere to generally accepted engineering standards and principles, and NCCIPS/NASA standards.
2. Period of Performance
The subcontractor shall provide a schedule of the proposed delivery date for each deliverable.
This schedule will be reviewed and approved by SAIC.
The period of performance of this SOW is from the award of the engineering contract through completion of all work as described.
This maintenance contract shall be effective 06/08/2025 through 06/07/2026.
3. Security
United States citizenship is required to gain access into the NASA Stennis Space Center and into the
NCCIPS data center. Proof of citizenship will be required to be presented for on-site work that requires entry into Zone A.
Appendix D – Acronyms and Abbreviations
ACRONYM/ ABBREVIATION DEFINITION
NASA National Aeronautics and Space Administration
NDA Non-Disclosure Agreement
NCCIPS National Center for Critical Information Processing and Storage
SCADA Supervisory Control and Data Acquistion
SOW Statement Of Work
SSC Stennis Space Center
UPS Uninterruptible Power Supply