SOW.pdf
PDF 429 KB Posted
- Attached to
- T&M Excavation and Gas Repairs Federal contract opportunity
- Solicitation number
- DS-338500-GD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| EXHIBIT I - Instructions to Offerors.pdf | ||
| AMENDMENT 1.pdf | ||
| QA -DS-338500-GD.pdf | ||
| IL2022011.pdf | ||
| SF1413-13e (1).pdf | ||
| Fermilab Subcontractor Injury Illness Data Questionnaire.pdf | ||
| Natural Gas Operations Maintenance Program.pdf | ||
| 010010_General_Requirements_Excavation Natural Gas Repairs.docx | DOCX document | |
| 014100 Quality Requirements - March 2022 Q Updates.docx | DOCX document | |
| EXHIBIT I - Instructions to Offerors.pdf | ||
| DS-338500-GD.pdf | ||
| 013100 - ESH REQUIREMENTS Rapid Response Update with Natural Gas Requirements .docx | DOCX document | |
| Exhibit II - Bid Bond FL-41.pdf | ||
| 2022 Construction Insurance Requirements.pdf | ||
| FRA General Terms and Conditions for Construction (06.2022).pdf | ||
| Design Guides.zip | ZIP file | |
| IL2022020.pdf | ||
| PUR-466_Proposal Certifications (1).pdf | ||
| SARC.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK: Excavation and Related Services Including Underground Natural Gas Repairs
11/29/2022
1.0 DESCRIPTION OF SERVICES:
1.1 The Subcontractor shall furnish all properly qualified management, supervision, personnel, materials, supplies, tools, transportation, and equipment with appropriate accessories (except as provided by FRA) and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Subcontractor shall perform operations, maintenance, installation, testing and certification, connection, disconnection, alteration, renovation, renewal, replacement, improvement or upgrade, demolition and/or removal, component fabrication, testing and/or troubleshooting, setting and alignment and installation of material or experimental equipment, system or component commissioning, loading, unloading, preparation for shipping or receiving materials, and other related services of the EXCAVATION AND RELATED SERVICES Including NATURAL GAS REPAIRS trade covered by the Davis-Bacon Act. The Subcontractor’s duties will also include operation of various pieces of equipment. Requested work may include tasks to operate and maintain Fermilab facilities or equipment, or other assistance to provide operational capabilities. The Subcontractor shall furnish materials, supplies, tools, and equipment including accessories, fuels, lubricants, filters, bits, blades, bulbs, and other consumables or disposables.
FRA will provide direct technical supervision (Task Manager) of Subcontractor tradesmen. This does not relieve the Subcontractor of responsibility to insure safe and effective management of employees and their work activities The Subcontractor shall provide transportation including portal to portal travel time, inclusive of all shipping, handling, and freight costs for equipment, materials, tools, parts and supplies. Subcontractor mobilization costs are not billable.
1.2 The level of FRA review and oversight of work activities is commensurate with the risk and complexity of the work activity.
1.3 Time and Material Releases are typically used when work is not fully quantified or documented, or conducted on a progressive basis with reliance on field decision making. The Subcontractor shall furnish qualified supervision and craftsmen to perform their respective trade work as directed by FRA. FRA will provide a Task Manager, responsible for specifying the FRA requirements as the task progresses, working closely with the subcontractor, supervisors, and workers.
1.4 If the Subcontractor’s individual release proposal is not acceptable to the FRA, representatives from the FRA and the Subcontractor will meet to discuss details of the Subcontractor’s proposal and its corresponding cost estimate including labor, material, equipment and other elements. If, after discussions, agreement between the FRA and the Subcontractor is reached, a time & material task order release will be issued. If an agreement is not reached, FRA may use an alternate means to perform the work including soliciting bids or proposals from other firms. If FRA uses a formal solicitation process, the Subcontractor will not be eligible to participate in the bidding or in the submittal of a new proposal for the work. Subcontractor will work with the Time and Material Office or a designated responsible FRA contact for the approved work to schedule when work is to begin.
2.0 REQUIREMENTS:
2.1 LABOR, MATERIAL, & SUPPLIES: In performing the work, the Subcontractor shall be responsible for identifying and furnishing the various craftsmen and equipment, tooling, material, and supplies. Workers assigned projects must be experienced and skilled at their assigned duties. Materials, supplies, and equipment provided must be industry standard quality or higher, and well suited for the purpose for which they are intended. Total cost of ownership, or long term life cycle cost shall always be the basis for quality level decisions, unless otherwise directed by FRA.
The Subcontractor and any Sub-Subcontractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, and integrity and shall be responsible for taking such disciplinary or other action as may be required, or may be suggested by FRA, including employee removal from the Fermilab job site.
2.2 TRAINING: All employees will be required to attend a FRA Safety Orientation Class, Safety Boot Camp and COVID 19 training and may be required to attend and successfully complete an Oxygen Deficiency Hazard physical and training course, Radiation Worker training, or other FRA provided training.
Time spent attending FRA provided training shall be billable at the straight time rate. All employees must obtain a FRA ID card for entry onto the site, which will be coordinated by the FRA Time and Material Office for Construction (Davis-Bacon) work.
2.2.1 Summary of required FRA Training
2.2.2 The Subcontractor and any Sub-Subcontractor performing work at Fermilab will be responsible for the following requirements concerning Subcontractor training:
2.2.2.1 The Subcontractor shall be responsible for assuring that their employees and sub-tier Subcontractor employees, who do not speak English, understand all ES&H requirements. The Subcontractor must be able to communicate any necessary instructions to those employees.
2.2.2.2 All Subcontractors performing work at Fermilab shall provide to their employees any necessary ES&H training as may be required by federal/state regulations and as appropriate for their Subcontract activities at Fermilab.
Exceptions involve hazards, which are unusual for the trade of the Subcontractor’s employees. In particular, FRA normally provides appropriate training for Subcontractors working in radiation areas or oxygen deficient hazard areas and expected emergency response.
2.2.2.3 ES&H Training that was provided by the Subcontractor or others and received by Subcontractor employees performing subcontractor activities at Fermilab shall be maintained on-site and available for review by FRA.
2.2.2.4 Subcontractors shall maintain on-site and provide to FRA upon request, any and all occupational safety and environmental records. Such records include, but are not limited to, the records required to be maintained by federal/state regulation. Such records include OSHA injury/illness logs, training records, inspection records, safety meetings, and incident investigations. Additional records appropriate for the Subcontractor’s activities shall also be maintained and provided
Course Description Required By
Offered By Typ. Time
Subcontractor Orientation & GERT Training FRA FRA 1 hour Safety Boot Camp FRA FRA 1 hour COVID 19 Training FRA FRA 30 minutes OSHA 30-Hr Construction (Field Superintendent) FRA Offsite 30 hours Radiological Worker Training (Depending on Area) FRA FRA 8 hours
Oxygen Deficiency Hazard (Depending on Area) FRA FRA 8 hours LOTO-II (Depending on Area) FRA FRA 4 hours Facility Specific Hazard Awareness (Depending on Area) FRA FRA 1 hour to FRA upon request. Examples include but not limited to:
Excavation Crane Inspections Scaffolding NFPA 70E Fall Protection Monitoring IH Hazards (e.g. silica exposure) Confined Spaces Written exposure monitoring program
Welding
2.2.2.5 If the Subcontractor intends to administer first aid or Cardiopulmonary Resuscitation (CPR), the Subcontractor must comply with 29 CFR 1926 and have available the list of names of any employee who will administer first aid or CPR, along with current certifications.
2.2.2.6 Summary of potential training required by Subcontractor:
Additional Course Needs, based on Task Scope of Work:
Asbestos Awareness Training Asbestos Class II Operations Training Asbestos Abatement Training, Class I & II (for workers) Asbestos Abatement Training, Class I & II (for supervisors) Lead Awareness Training Lead Abatement Training (for workers) Lead Abatement Training (for supervisors) Hazardous Materials Awareness Excavating & Trenching Competent Person Hazardous Waste Site, Hazmat Training (for workers) Hazardous Waste Site, Hazmat Training (for supervisors) First Aid/CPR/AED Training Fall Protection Training for Construction Fall Protection Training for General Industry Fall Protection Competent Person Hazard Communication Aerial Lift Training Scaffold Awareness Training Scaffold User Training Scaffold User / Builder Training Ladder Safety Confined Space Entry Training Lockout Tagout Training
NFPA 70E
Respiratory Protection Training
2.3 MANAGEMENT & SUPERVISION: The appropriate level of site supervision will be determined by the FRA Task Manager in consultation with the Subcontractor.
The Subcontractor's representative shall be available on a call basis for consultation, preparation of Subcontractor proposals, and discussion relative to FRA operational problems. This Subcontractor representative’s service will not be compensated.
2.4 QUALITY ASSURANCE: In conjunction with ESH policy 014100, unless otherwise specified by the work order or the FRA Construction Coordinator or Service Coordinator, the Subcontractor’s on-site supervision will be responsible for quality assurance, including all activities necessary to manage, control, and document work so as to ensure compliance with the Subcontract requirements. The Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on and off site by his/her organization, suppliers, Sub-tier Subcontractors, technical laboratories, and consultants. The work activities include safety, submittal management, testing and inspection, and all other functions relating to the requirements for quality work. The Subcontractor shall implement a Quality Control program to achieve these goals. The quality and timely provision of workmanship and material provided under this Subcontract shall meet normal industry standards. Section 6.4 WARRANTY (CONSTRUCTION) in the FRA General Terms and Conditions for Construction (8.2021).
3.0 Releases
3.1 All work requested by FRA (including all labor, equipment, materials, and supplies or the providing of services) shall be authorized by FRA’s issuance of a Davis-Bacon Release to the Subcontractor. The Release shall define (a) the location and the scope of work to be performed, (b) the estimated dollar ceiling applicable to the performance of such work, and (c) the anticipated starting and completion date.
This Subcontract anticipates service in response to emergency situations at Fermilab. The Subcontractor’s personnel, equipment, services, supplies, and locally available materials shall be provided within 4 hours when requested.
A release may require simultaneous work at various site locations, and it is the Subcontractor’s responsibility to schedule and manage such assigned work to assure its timely performance and to also assure that an efficient and economical utilization is being made of all available labor, equipment, materials, and supplies assigned to the work. Work shall not be started that conflicts with the terms of this Subcontract, and in the event of any apparent conflict, ambiguity, or inconsistency between work and this Subcontract, the Subcontractor shall immediately bring this matter to the attention of the FRA Task Manager for resolution.
3.2 The Subcontractor shall not perform any work which exceeds the dollar ceiling set forth in a Release
3.3 T&M Releases and subsequent changes or modifications shall be issued in writing by FRA’s T&M Office. Overtime will not be allowed except as specifically authorized by the T&M Office. The Subcontractor shall not perform any work which exceeds the Release ceiling.
3.4 Individual Davis-Bacon subcontract Releases shall be subject to bonding requirements as defined in CLAUSE 15 - INSURANCE AND BONDS located in the FRA General Terms and Conditions for Construction (8.2021). No work shall commence against any such release until the required bonds or assurances have been submitted to the Procurement Office.
4.0 BILLING
4.1 FRA agrees to pay the Subcontractor for the number of hours worked for all labor furnished under a T&M Release on the basis of the appropriate billing rates for each of the labor craft classifications requested by the Release.
4.2 PREMIUM T&M HOURLY BILLING RATES: The straight time billing rate shall apply to all work unless defined as premium time in the appropriate current local collective bargaining agreement(s).
4.3 TIME SHEETS: The Subcontractor’s time sheet shall be prepared and submitted daily for each T&M Release showing the Release Number, work performed, the name and classification of each tradesperson charged to the job, the number of hours worked at each respective rate (distinct lines for different classifications or for different rates, including premium rates). Time sheets shall be signed by the Subcontractor’s Representative, the Task Manager, and the T&M Office.
4.4 WORK DAY: For T&M Releases the Subcontractor will normally work from 7:00 AM until 3:30 PM with a half-hour unpaid lunch period or as close to these times as the performance of work allows.
4.5 WORK HOURS: With exception of picking up vehicles, tools, equipment, and getting work assignments, T&M employees should be at their assigned work site at the start of the work day and should not be leaving the work site before the end of their eight-hour shift, unless reassigned to another location.
Each T&M Subcontractor is being paid for 8 (eight) hours of work performed by each Subcontractor employee working at Fermilab each day. FRA expects each of these individuals to be on site and performing their assigned tasks for the 8 (eight) hours they are being paid.
4.6 On a daily basis, before or at start of the workday, the subcontractor shall notify the T&M Office of:
a. Where the subcontractor is working
b. Who is on-site working under the subcontractor, including any third party workers.
c. What work is being performed.
4.7 CERTIFIED PAYROLLS: The Subcontractor’s and all lower tier sub-subcontractors’ required weekly payroll information shall be submitted electronically utilizing the LCPtracker© System, which is available at https://lcptracker.net/login.aspx unless otherwise authorized by the FRA Procurement Specialist.
Registration should be coordinated with the FRA Procurement Specialist.
4.8 T&M BREAKS, START-UP/CLEAN-UP: A thirty (30) minute lunch break between 12:00 noon and 12:30 PM and two fifteen (15) minute breaks are authorized. The morning break will start at 9:00 AM and the afternoon break will be at 2:00 PM, or as close to these times as the performance of work allows. If required, fifteen (15) minutes at the beginning of the work day and at the end of the work day are allocated and should be ample time to pick up or return equipment to their designated location. Those employees that are not picking up or returning vehicles, tools, etc. are to be on the work site at the beginning of the work day (7:00 AM) or potentially (8:00 AM) for village operations. The last fifteen (15) minutes of the work day are to be used for tool pick up and associated cleanup activities.
4.9 ADDITIONAL BREAK DETAILS: All breaks are to be taken on the work site with following exception.
No lunch breaks or food of any kind is allowed in a designated Radiation Area. In these cases, the employees will exit the designated Radiation Area and take their break at the nearest accessible facility that provides wash up capabilities. The Task Manager will determine the appropriate location prior to the start of the work and shall make known to the employees the location to be utilized and must be notified and approve any changes in the break times or location.
4.10 VIOLATION OF POLICY: Repeat violations by employees to any of the aforementioned policies may result in FRA directing the Subcontractor to not reassign those employees to further FRA work. All Task Managers should bring violations of these policies to the attention of the T&M Office or designee. The T&M Office will enforce these policies and all other Subcontract requirements where applicable.
https://lcptracker.net/login.aspx
5.0 EQUIPMENT & TOOLING
5.1 TOOLS OF THE TRADE. The Subcontractor and any Sub-tier Subcontractor will be required to furnish at his expense the usual tools, equipment, special equipment, personal protective equipment, and equipment supplies common to the general excavating and related services including natural gas repairs construction trades involved in this work. This requirement includes but is not limited to vehicles used to transport tradespeople, equipment and material, testing and monitoring devices, hand tools and handheld power tools, supplies such as saw blades, drill bits, dies, taps, trouble lights and bulbs, ladders, welders and torch sets, fire extinguishers, and GFI extension cords. Minimum requirements are identified below.
Adequate quantities of all tools/equipment shall be provided and readily available for all tradespeople. Costs associated with these items should be included as part of the Subcontractor’s overhead within the labor billing rates. The equipment shall be in good operating condition for the work to be performed, and shall be promptly maintained, and repaired.
The Subcontractor shall provide vehicle, portable equipment, oil and gasoline.
5.2 EQUIPMENT: The minimum equipment to be furnished by the Subcontractor is listed below:
REPRESENTATIVE SMALL TOOL LIST
-A-
• Adapters - Drills, Wire, Wheels, Regulators, Oxygen, Fire Hose, Etc.
• Agitators - Paint Spray
• Aligners, Metal Door Frame
• Aligners, Pipe, Lever Type
• Allen Wrenches
• Anti-Freeze Tester
• Anvils
• Arbors, Holesaw
• Attachment, Cutting
• Augers, Hand/Sewer
• Awls, Brad/Scratch
• Axes
-B-
• Baker Scaffold
• Banding Machines, Hand Type
• Bandsaw (Porta Band)
• Barricades - Personnel Type
• Bars, All Types
• Base, Magnetic
• Battery Charger
• Battery Jumper Cables
• Beading Machine, Glass
• Benders, Conduit/Pipe Tubing 1/2” to 1 1/4”
• Bevelers - Conduit, Pipe
• Binders, Load Chain
• Blankets, Rubber, Electrician’s
• Blocks, Cable/Rope
• Blowpipes
• Blowers - Air
• Body - torch
• Bolt Cutters
• Boring Machines, Hand
• Boxes, Gang/Tool
• Braces, Drill Bit
• Brushes, Power
• Buggies, Concrete
Tool List-E2.doc
• Bull Points
• Burners - Prestolite, Wood, Lead
• Buzzer Test Sets - Phone Sets
• Cable - Plumbing
• Calipers
• Car Movers, Hand Type
• Carriers - Timber
• Carts - Welding
• Casters
• Caulking Tools
• Cement Joining - Tools
• Chain/Real - Engineer’s
• Chainfalls
• Chains
• Chair, Bosun’s
• Chisels, Cold/Wood
• Chisels, for Air-Operated Tools
• Chockers, All Types less than 1”
• Chocks, Wheel Safety
• Chucks, Tool, All Types
• Chutes, Concrete
• Clamps, “C” Machinist’s
• Clamps, Bar
• Clamps, Carpenter’s
• Clamps, Ground
• Clamps, Welding
• Cleaners, Drain, Hand/Electric
• Clevis
• Climbers, Pole
• Combination Sets
• Compasses
• Conduit Hickeys
• Cords, Extension
• Coupon Tester
• Creepers, Floor
• Crimping, Tools, Wire Hand
• Cutters, Bolt/Pipe
• Cutters, Tin Snips/Tube
• Cutters, Weed/Wire Rope
-C-
• Detectors
• Dies, Bolt/Pipe 1/2” to 2” Pipe
-D-
• Diggers, Post Hole
• Dividers
• Dollies, Metal/Pipe/Wood
• Door Hanging Kits
• Drills, Master, to 1/2”
• Drills, Master, to 1/2”
• Drills, Stand
• Dust Free Drywall Sanding Tools
• Edgers, Concrete
• Embosser, All Types
• Emery Wheel Stands
• Etcher, Electric
• Extinguisher, Fire
• Extractors - Screw/Bolt
-E-
• Fans, Electric, All Types
• Files, All Types
• First Aid Kit
• Floats, Aluminum/Magnesium/Steel
• Floats, Concrete/Bull
• Flowmeter, Regulator, Air/Argon/Helium
• Forks, Barn/Ballast
• Furnace, Plumber’s, Lead-Melting
-F-
• Gads
• Gauges, Center/Drilling
• Gauges, Feeler/Pressure
• Gauges, Thickness/Track/Wire
• Gloves, Welding and Sleeves
• Goggles, Safety
• Grabs, Hook
• Grabs, Pipe to 20”
• Grinders, Electric/Hand
• Grinders, Portable
• Grips, Wire
• Guards, Grinders/Saws
• Guns, Caulking
• Guns, Grease/Paint
• Guns, Pop Rivet
• Guns, Power Actuated
• Guns, Stud-Percussion
-G-
-H-
• Hacksaw, Power
• Hammer, Rotary
• Harness, Full Safety
• Hand Tools, Portable (electric and non-electric)
• Hatchets
• Heat Guns
• Heaters, Kerosene/Electric
• Helmets, Welding
• Hickeys, Conduit/Pipe
• Hoes
• Hoist, Chain
• Hoist, Come-A-Long
• Hoist, Puller/Wire
• Hoist, Trolley
• Holders, Welding, Electrode
• Hoods, Sandblasting
• Hook Eyes, Round/Chain
• Hooks, Cant/Chain/Grab/Sling
• Hooks, Packing/Pipe
• Horns, Signal
• Hydrometers
• Indicators, Dial Test/Speed
• Irons, Caulking
• Irons, Soldering
-I-
• Jacks, Reel Types
-J-
• Knives, All Types
• Knockouts, Hand/Hydraulic
-K-
• Ladders, All Types
• Ladles, Melting
• Lathes, Field Tooling
• Level Rod, Surveyor’s
• Levels, Hand Mason’s
• Levels, Hand-Bench Type
• Levels, Precision/Machinist’s
• Lights, Extension/Flood
-L-
• Machetes
• Mallets
-M-
• Mandrels - Hand Saw
• Markers - Pipe Contour
• Masks - Safety (Permanent)
• Mauls
• Meters, Millivolt/Volt
• Micrometers
• Mirrors - Inspection
• Mitre Boxes
• Mixers - Hand, Motor, Concrete, Paint, Etc.
• Mortar Boxes
• Mortiser - Lick -Electric
• Nail Set
• Nailer, Air
• Needle, Sealer
• Nets, Safety
• Nibbers, Sheet Metal
• Notchers, Pipe
• Nut Chaiser
• Nut Dies
-N-
• Oilers - Pipe Threading
• Ovens - Dry Rod
-O-
• Packing Tools
• Paving Breakers
• Peavies
• Pedestal Grinder
• Pencil, Engraver - Electric
• Picks, All Types
• Pins, Drift
• Pipe Markers
• Pipe Stands
• Pipe Threading Machines
• Pipe Rollers
• Planes - Electric, All Types
• Planets - Carpenter
• Pliers, All Types
• Plows
• Plugs (Plumber’s)
• Pole Sander
• Poles, Pike/Range, Surveyor’s
• Pots, Fire/Metaling
• Pretolite Outfits
-P-
• Protractors, All Types
• Pulleys, All Types
• Pumps, Bilge/Fire/Hand Test/Tire
• Punch, Center
• Punches, Hole
• Purging Outfits
• Push Drills
• Rakes - All Types
• Rams - Hydraulic
• Rasps, Wood
• Ratchets, Types 1/4”, 3/8”, 1/2”
• Reamers, Pipe/Wood - Hand Power
• Reel Stands, Screw/Telescoping
• Reel, Tie Wire
• Regulator, Acetylene/Argon/Oxygen
• Respirators
• Riveters, Hand
• Routers, Butt-Electric
• Rules, 6’ Steel/Wood
• Runners, Electric Nut
• Runners, Joint/Pipe
-R-
• Sanders, Air/Electric
• Sash Tools
• Saws, Chain - Gasoline
• Saws, Hacksaw Frames
• Saws, Hand, All Types
• Saw, Hole
• Saw Horses
• Saws, Reciprocating (sawsall)
• Scales - All Types
• Scissors, Electricians
• Scoops, Hand
• Scraper, Paint
• Screeds, Portable
• Screw Stops
• Screwdrivers Electric/Hand - All Types
• Scribes
• Scythes
• Shackles, All Types Less Than 1”
• Sharpener, Drill Bit
• Shears, Metal/Hand
• Sheaves 12”, 18”, & 24”
• Shields, Safety/Welding
-S-
• Shovels, All Types - Hand
• Sickles
• Side Cuts
• Sledges
• Slinges, All Types Less Than 1” (Except Chocker)
• Snips
• Socket Sets
• Spade
• Spoons, Digging
• Sprayers
• Spreaders
• Squares, Carpenter’s Mechanic
• Stamps, Steel
• Stands, Drill
• Stencil Sets
• Stocks, Pipe-Hand
• Stoves, Electric/Oil
• Straight Edges, Machinist
• Straight Edges, Steel Drafter’s
• Strippers, Wire
• Support, Pipe
• Swages
• Swivel, Light Duty
-T-
• Tachometers
• Tampers, Hand
• Taper Shank Extension
• Tapes, Fish/Wire Puller
• Tapes, Steel-Measuring
• Tappers
• Tarpaulins
• Template, Hinge-Butt
• Test Plugs
• Tester, Battery/Radiator
• Tester, Circuit/Insulation
• Tester, Motor Rotating
• Thimbles, Cable/Rope/Wire
• Threaders, Pipe Geares, Bolt
• Tips, Welding/Cutting
• Tongs, All Types
• Tools, Banding, Flaring
• Torches, Arc Air/Blow/Gas
• Torches, Burning/Cutting/Welding
• Track Levels
• Trailer, Construction Storage (Standard Size)
• Trailer, Construction Office (Standard Size)
• Trolley, 1-Bear
• Trowels, Hand-All Types
• Trucks, Hand-All Types
• Turnbuckles
• Universal Joints (Socket Wrench)
-U-
• Vacuum Cleaner
• Vacuum Cleaner, Certified HEPA Filtered
• Vibrator, Concrete, All Types
• Vises, All Types
-V-
• Walkboards, Aluminum
• Water Dispensers
• Wedges, Steel
• Welding Machine
• Well Wheels
• Wheel Barrows, All Types
• Wire Pullers, Electric
• Wire Twisters
• Wrenches, Hand - All Types
-W-
• First Man Up Device
• Retractable Lanyard
• D-Rings
-Safety Equipment-
REPRESENTATIVE CONSUMABLE LIST
-A-
• Abrasive-Cloth, Paper, Wheel, Disk Acetylene Gas
• Acids - Soldering
• Adhesives - Glue, Tape, Etc. Alcohol
• Anchors Anti-Freeze
• Aprons - Asbestos, Rubber, Etc. Argon Gas
-B-
• Backing Pads - Electric Sanders
• Badge, Employee Identification Bags - Burlap, Canvas
• Bags - Dust - Belt Sanders
• Bands - Rubber & Steel for Banding Machines Bands - Safety Mats, Suspended
• Bat - Pull Handle Barrel, Trash Batteries, Dry Cell Batteries, Flashlight Belt Dressing
• Belts, Safety
• Belts, Miscellaneous
• Bits - Drill, Reamer, All Types Blades, Tool - All Types Boots, Rubber
• Brads, All Types Brake Fluid
• Brick, Rubbing, Concrete/Masonry Brooms, All Types
• Brushes, All Types Buckets, All Types Bulbs, Electric Bulbs, Flashlight Bulbs, Lantern
-C-
• Calcium Chloride (Construction Use) Cap Screws
• Carbide
• Carbon Dioxide Gas Carborundum - Blades, Stones Cartridges -Grease, Stud Gun Caulking Material
• Cement - Gasket, Pipe Joint Chalk - Line, Marking, Etc. Chamois
• Chisels - Hand Cold
• Cleaner - Hand Compound, Welding Tip Cleaning Materials - Soaps, Fluids, Etc. Clear Glass - Mood, Goggles
• Cloth - Cotton, Sandpaper, Etc. Cords, Sash
• Cotter Pins
• Crayons - Lumber, Marking Cups, Drinking
• Cutter Wheels Cutting Oil
-D-
• Dies - Bolt & Pipe Dippers
• Disc, Cutting/Grinding Disinfectants Dispensers, All Types
• Dope - Gasket, Pipe, Thread Drill Sleeve
• Drill Sockets Drills, Star Drop Cloths Druts
-E-
• Emery
• Engineering - Stakes & Supplies Erasers
• Excelsior Extinguisher Refills
• Eyeshield, Bench Grinder
-F-
• Filters, All Types First Aid Supplies Flagging, Roll Flares
• Flashlights Fluxes, All Types Funnels, All Types Fuses, Electrical
-G-
• Gaskets Glass Cutters
• Glasses, Safety Glazier’s Points
• Gloves (Except Welding) Glue
• Glycerin Graphite Bun
• Grinding Compounds
-H-
• Hacksaw Blades Handles, All Tool Hasps
• Hats, Safety (Hard Hats) Hinges, Construction Horses, Carpenter
• Hose Menders Hose, Couplings Hose, Garden
-I-
• Ice Ink
-J-
• Jute
-K-
• Keys, All Types
-L-
• Lamps, Electric Lanterns, All Types Lashings, All Types Lead, Plumber’s Lenses, All Types Lighters, All Types Line, Marking Line, Mason’s Liners, Safety Hat
• Locks - Door, Gang Box, Temporary Construction, Tool Box, Etc.
-M-
• Masks, Safety, Disposable Mender Hose
• Mineral Spirits
-N-
• Nitrogen Nozzles, Hose
-O-
• Oilstones Oil Cans Oxides Oxygen
-P-
• Padlocks
• Pails, All Types Pan, Drain Paper Clips Paper, Adhesive Paper, Craft Paper, Sanding
• Paper, Toilet Patterns, Pip Layout Pencils
-R-
• Rags, Wiping Razor Blades
• Reproduction Supplies Respirator Pads and Filters Rivets
• Rock Salt and De-Icing Compounds Rope - All Kinds
• Rubber Boots
• Rust Preventatives
-S-
• Salt Sandpaper
• Saw Blades, Power, All Types Screens
• Shields, Safety Shoring Wood Slump Cones Soap Soapstone Solvents Sponges
• Sprays, Insecticide Stakes
• Staples
• Stencils
• Stone, Sharpening, Wet/Dry Straw (Concrete Protection) Suit, Rain
-T-
• Tags, Material/Tool/Shipping Tapes (Except Measuring) Thermometers, All Types Thumbtacks
• Tie Wires
• Tips - Cleaners, Cutting, Welding Towels
• Turpentine Tungsten Electrodes Twine (Wrapping)
-W-
• Washing Powder
• Water, Drinking Wedges, Wood Welding Rod Wheel, Cutting Wheel, Grinding Wheel, Polishing Wool, Steel
A. ¾-ton pickup truck or equivalent substitute for use by the Supervisor.
B. ¾ ton pick-up truck for each two laborers or fraction thereof. All other tradesmen will have appropriate vehicles to move to, from, and between job sites.
C. 12 cubic yard dump truck
D. Crawler/backhoe with > 2 yard bucket
E. 4 wheel Tractor with 1.5 cubic yard front end loader and .5 cubic yard back hoe attachment
F. Track end loader/ 953
5.3 One pick-up truck or van shall have a ladder rack capable of transporting ladders from 10' to 40'. All pickups (or dump trucks if used by laborers) must have at least the following utility tools:
• 1 Claw hammer
• 1 Cat’s paw
• 1 Round shovel
• 1 Flat shovel
• 1 Pick
• 1 Rake
• 1 Sledge hammer
• 2 Wrecking bars
• 1 24” push broom
• 1 General purpose upright straw broom with 12”sweep
5.4 SPECIAL EQUIPMENT. The Subcontractor will furnish the following equipment, and other equipment listed in the accepted Technical Proposal. It all must be suitable and in good and if required currently inspected, tested and/or certified operating condition for performing work under this Subcontract.
He/she will operate, maintain and repair the equipment and provide all operating materials and supplies, including fuels and lubricants, welding and cutting torch tips, wire brushes, friction lighters, goggles, gloves, fireproof clothing, welding curtains, saw blades, drill bits, grinding wheels and discs, chipping hammers, and other related materials and supplies at no additional cost to FRA. In case of equipment breakdown, the Subcontractor is responsible for furnishing replacement equipment within twenty-four (24) clock hours at no additional cost to FRA.
A. Gas powered hand-held concrete saws with blades
B. Hammer drills
C. Motor mixers
D. Gas powered 5KW electric generators
E. Worm drive circular saws, 6.5" minimum
F. Reciprocating saws
G. 3/8 inch drill motors and bits
H. 1/2 inch drill motors and bits
I. Electric screw guns
J. Steel stud crimpers
K. Steel stud cutters
L. Powder actuated fastening tools
M. 4-foot step ladders
N. 6-foot step ladders
O. 8-foot step ladders
P. 30-foot extension ladders
Q. 5-foot scaffolding sections
R. Shop vacuum cleaners
S. Oxygen meters for confined spaces
T. Plasma Cutter
U. MIG Welder
V. TIG Welder
W. Flux Core Welder
X. Stick Welder
Y. Acetylene Torch and gases in cylinders for welding and cutting operations
Z. Portable Bandsaw
5.5 VEHICLES shall be fully operable and meet the safety standards of the Illinois Vehicle Code and OSHA. The Subcontractor shall be required to arrange for vehicle refueling. No long term fuel storage tanks shall be permitted on the Fermilab site. No repairs to vehicles are to be made on the Fermilab site. Upon award, the Subcontractor shall submit to the T&M Office a list of vehicles to be used under the Subcontract, listing the make, model, age, and license number of each vehicle. All vehicles shall have legible signage indicating the company name and contact information.
5.6 SHOP FABRICATED PARTS; The Subcontractor may be required to fabricate various sheet metal shapes and forms. The Subcontractor will be reimbursed for all shop fabricated parts at a cost not to exceed that agreed upon at the time the Subcontractor submitted his proposal and the Release was issued. If after the Release has been issued, the scope of the job changes so as to change the cost of the shop fabricated parts, the Subcontractor shall immediately submit a revised proposal for approval. Failure to resubmit a revised proposal may result in the Subcontractor being limited to the shop fabrication costs contained in his original submittal. At the time of delivery of any shop fabricated material, signed time sheets for each day of Shop Labor listing the Labor Classification, the same of the tradesman and the hours worked along with a receiver document detailing the type, quantity and cost of all material and parts used must be provided to the TM and T&M Office. Invoices for the shop fabricated parts shall show the dates and the number of hours for Shop Labor expended, the type and quantity of material used, and the cost of each of those items. It is understood that the Subcontractor will purchase pre-fabricated parts whenever possible.
5.7 MATERIAL, THIRD PARTY RENTED EQUIPMENT, SUBCONTRACTED LABOR, OR OTHER SPECIALIZED SERVICE: The Subcontractor shall be reimbursed for all Subcontractor furnished material, equipment, labor, or other specialized service which was authorized to be supplied directly by the Subcontractor or obtained from third parties in a Release or Releases. A billing rate must be established in writing with the T&M Office and the Task Manager before any Subcontractor rental equipment or third party is used on any job. Hourly usage of equipment must be listed on each job’s daily time sheet. All third party items will be billed as a material invoice. Third party invoicing will be reimbursed based on the submission of the current Insurers general liability insurance percentage rate.
Upon receipt of acceptable invoices, showing a breakdown of the labor, material, and rental equipment used as provided elsewhere in the Subcontract, and upon presentation by the Subcontractor of his vendors’ billings for such purchases or rentals, FRA agrees to reimburse the Subcontractor the net amount of such vendor billings provided that the vendors’ billings reflect prices which are equal to or lower than the prices which would have been paid by FRA if it had acquired the equipment or service under like or similar market conditions. Discounts, rebates, or other adjustments available to the Subcontractor shall be credited to FRA. Material handling charges are not allowable on third party billing invoices.
When the Subcontractor’s rate is higher than the FRA similar market rate, a fair and reasonable reimbursement rate must be negotiated with the T&M Office. Charges shall be split between Releases when equipment/service on a single third-party Subcontract is used to perform work on multiple Releases. Rental equipment must be properly maintained, tested, and currently certified when required.
6.0 MATERIAL RECEIPT & ACCEPTANCE by FERMILAB:
The Subcontractor will be required to furnish and will be reimbursed for materials which will become part of or consumed on various T&M Releases. No provision exists in this Subcontract for mark-up of T&M materials and supplies. Proper job planning is necessary to order materials, supplies, repair parts, or other commodities for delivery.
Subcontractor journeyman labor may be used for off-site purchasing/pick-up in unusual circumstances, but shall not be acceptable for routine business transactions. Reimbursement will not be made at higher than journeyman rates, regardless of who actually performed the task.
Any and all materials and/or supplies authorized in a T&M Release shall upon delivery to the Fermilab site be received, inspected, and accepted by a representative of the Subcontractor and the T&M Manager or Task Manager. At time of delivery of any and all material from the Subcontractor’s stock or from a supplier, a legible dated and signed receipt will be provided to FRA listing each item of material supplied, the quantity, and the price. The Subcontractor’s invoices should identify the delivery receipts and the related Release for all Subcontractor-furnished materials and/or supplies.
7.0 PASSAGE OF TITLE
Title to materials and/or supplies which the Subcontractor was authorized to purchase in the Release shall vest in FRA immediately upon their acceptance.
8.0 PAYMENT
Promptly after receipt of each validated invoice with accompanying certified payroll, FRA shall, subject to the provisions of the Subcontract, make payment as approved. All T&M invoices for labor shall show each individual tradesman’s name, the craft and classifications furnished, and the number of hours worked and rate of pay on each Release by each worker in each category each day. Labor invoices submitted for payment shall be substantiated by detailed daily records of workers, crafts, classification, and number of hours worked, approved by a representative of the organization for whom the work was accomplished.
Invoices for Subcontractor-owned equipment will identify the number of hours each piece of equipment was used by T&M Release. Invoices for material and third-party service or rental equipment will identify each charge by Release and be supported by a copy of the original invoice submitted by the Subcontractor's supplier. Material provided by FRA shall also be included in the form of a supplemental note associated with each Release, with sufficient detail to be able to combine with the invoiced material above to establish a complete Bill of Materials used on each task.
At any time prior to final settlement under this Subcontract, representatives of FRA or its designees will have access to and the right to audit the Subcontractor’s invoices, vouchers, statements of cost, books and records to determine the correctness and propriety of payments made under this Subcontract. Each payment theretofore made shall be subject to adjustment for amounts included in the related invoice or voucher on the basis of such audit. Any payments may be reduced for over payment, or increased for under payments on preceding invoices or vouchers.
The Subcontractor agrees that any refunds, rebates, or other amounts (including any interest thereon) accruing to or received by the Subcontractor or any assignee under this Subcontract shall be paid by the Subcontractor to FRA to the extent that they are properly allocated to costs for which the Subcontractor has been reimbursed by FRA under this Subcontract. Reasonable expenses incurred by the Subcontractor for the purpose of securing such refunds, rebates, credits, or other amounts shall be allowable costs hereunder when approved by FRA.
9.0 PIPEFITTING REQUIREMENTS
Pipefitting and related work shall be provided as requested with each Release. These specifications are minimum standards.
9.1 WORK MAY INCLUDE:
a. Field measurement, verification, development and submittals of shop drawings, material cut sheets, welders certification, schedules, hydrotest results, passivation process plans and results, as-built records, safety submittals and other related items as requested.
b. Loading, unloading, transporting of FRA-furnished equipment, tools, supplies, materials, and housings to the project site.
c. Furnishing & installation of piping including taps, valves, fittings, accessories, support systems, insulation, jackets, flow markers, and hydrotesting.
d. Flushing and cleaning of piping.
e. Painting of piping, supports, & structural steels, including all existing pipe tap-offs as indicated on the drawing.
f. Draining existing piping as well as filling and testing new piping.
9.2 STANDARDS AND PUBLICATIONS (latest issues): The specific subsections noted are part of this specification:
a. American National Standards Institute (ANSI)
b. American Society for Testing Materials (ASTM)
c. American Society of Mechanical Engineering (ASME)
d. National Certified Pipe Welding Bureau
9.3 PIPE INSULATION, when requested: Insulate all piping with 1-½" thick fiberglass pipe insulation, or as otherwise specified. Product shall be Owens Corning ASI/SSL pipe insulation or approved equal. Paint and/or cover with PVC jacket pipe cover (minimum thickness 0.01") where requested.
9.4 PIPE AND FITTINGS, AS REQUIRED:
a. Pipe:
1. Schedule 40, black steel, ASTM A-53, beveled ends, butt welding.
2. Stainless steel, ASTM-A312 Type 304L
b. Fittings: Schedule 40, black steel, ASTM A-234, ANSI B16.9, grade WBP long pattern seamless, beveled ends, butt welding.
Threaded fittings shall be made in USA when possible to procure.
c. Flanges: Weld neck flanges, forged steel, 150 lb., ASTM A-181, grade 1, ANSI B16.5: ANSI B16.21, 1/16 inch ring type gasket; carbon steel, all threaded bolts; ASTM A307, carbon steel, hexagon nuts for use with steel flanges. Subcontractor shall clearly note on the shop drawings any use of non-weld neck flanges due to tight space.
d. Elbows shall be long radius except as noted. A short radius elbow may be used for backwash lines or where there is a very tight space. This information shall be clearly noted on the subcontractor's shop drawing submittals.
e. Bolts and gasket: Bolts and nuts for flanges shall be carbon steel equal to or better than grade B of ASTM specification A307-52T. Gaskets shall be of cellulose fiber and nitrile rubber binder composition, 1/16" thick, ring type, Armstrong type CN705 or approved equal for welding flanges.
f. Pressure gauges: Moeller, Marshalltown, Weksler, Marsh, Ashcraft, Crosby, or approved equal, Bourdon tube "quality" gauges with 1% of full scale maximum error, 4-½" dials, 0-150 psig, brass cage, and provision for field recalibration. Gauges shall be furnished with ball valves, brass body, brass trim, TFE seat and seal material, and straight pipe nipples. Wetted metal parts of stainless steel products shall be Type 304 or 316.
f.
g. Thermometer: Industrial type Moeller, Weksler, or approved equal, 9" scale, adjustable neck, red reading mercury thermometers with separable brass (or 316 stainless) well and socket, 0°-100°F range.
h. Butterfly valves: lug type, iron body, aluminum bronze disc, reinforced- EPDM seat, bubble tight service to 200 psig WOG, designed for dead-end service capability for isolation. Sizes and operator type as indicated by FRA. Nibco LD 2000 or approved equal.
For critical isolation applications, High Performance (HP) valves may be required as directed by the Task Manager.
i. Drain valves/gauge valves shall be ½" minimum size ball valve, threaded, carbon steel or brass body, ball and stem (or 316 stainless steel body, insert, ball, and trim), ultra high molecular weight polyethylene (UHMPE) (or TFE) seats and seals, min 150 psi pressure at 150°F. Jamesbury or approved equal.
9.5 DIELECTRIC CONNECTIONS: Pipe joints connecting dissimilar metals shall be insulating, dielectric connections. Flanged joints shall be made with insulating gaskets, bolt sleeves and washers.
9.6 GENERAL PIPE WELDING:
a. The National Certified Pipe Welding Bureau procedures, the ASME B31.3 Process Piping Code, and ASME Boiler and Pressure Vessel Code, Section IX shall govern welding procedures, when required.
No welder shall be employed who has not fully qualified under the above codes and/or specified procedures.
b. Welding performance qualification test records for each welder employed shall be certified by independent third party laboratory for specific tasks and submitted before starting of welding for each welding procedure, if requested.
c. Costs incidental to welder qualification tests shall be assumed by the Subcontractor, when required.
d. Welds shall be capable of compliance with the limitations on imperfections as specified in the code for visual examination. Regardless of the class of inspection required, all accessible finished weld surfaces shall be visually inspected by the welder to make sure each weld is free of discontinuities, and examined for evidence of defects in accordance with Paragraph 3336.5 and Table 327.4.2 of
ANSI B31.3.
e. Welds shall be considered acceptable if repetitive or injurious defects are absent, which may be observed upon visual examination and pressure testing.
f. Pipe and fittings for butt weld joints shall have all ends beveled to 37.5° ± 2.5°.
g. Butt end bevel preparation and cleaning shall be done according to the approved procedure.
Particular care shall be exercised in removing all foreign matter from inside the pipe.
h. Defective welds or fittings will be repaired or replaced, as determined by the Task Manager.
i. Isolation and inert gas purging shall be repeated if repairs or replacements are necessary.
j. Specified procedures to restore repaired or replaced piping to operating conditions shall be repeated and the system retested.
9.7 STAINLESS STEEL PIPE WELDING, when requested: Welding of austenitic stainless steel piping shall be done with inside of piping effectively purged with argon, helium, or nitrogen to prevent oxidation of the underside of the weld during root- pass welding. Welding rod or electrode shall be E, ER316l or E318, as per AWS- ASTM. The first (root) pass shall be made by the inert gas tungsten arc welding process to insure good root penetration. Segments of pipe to be joined by welding shall be aligned to within 1/32".
On pipe of wall thickness up to 3/16", the weld shall be completed by the inert gas tungsten arc welding process. On pipe of heavier wall thickness, the balance of the weld, after the root pass, may be completed by shielded metal arc welding with covered electrodes, by the inert gas shielded consumable electrode, or by the submerged arc welding process. However, if submerged arc welding is done, flux and wire shall be carefully selected to avoid combinations which tend to result in excessive ferrite.
9.8 LEAK TESTING, when requested: New piping shall be hydrostatically tested for a period of four (4) hours minimum at 1.5 times the system working pressure when requested. Tests shall be performed in the presence of a FRA Task Manager. Scheduling of testing procedures shall be arranged 48 hours in advance. The subcontractor shall record the test pressures and durations using a chart recorder and submit results to FRA. The submittal shall include dates of test, pressures, and signature of subcontractor or their representative.
a. Install caps or plugs at all interface connections and ends. Tests shall be made before concealment of the work. All temporary piping, pumps, gages, and other equipment necessary to conduct the test shall be provided by the subcontractor.
b. Any leak which may develop or imperfection detected shall be properly repaired or replaced, as determined by FRA, and the test shall be repeated until all work is proven sound and satisfactory.
c. All temporary piping, pumps, gauges and other testing equipment necessary to conduct the tests shall be provided by the subcontractor.
d. Disconnect and/or protect instruments and gauges not structurally sufficient for test pressure.
9.9 SUPPORTS, when requested: Furnish and install all necessary hangers, anchors, braces, and equipment supports, trapezes or hangers, which shall include all structural steel members and shapes, standard rods, nuts, bolts, concrete inserts, expansion shells, welding pins, beam clamps, pipe brackets, tubing and pipe clamps, as requested, whether or not specifically called out, to support and/or suspend all equipment, piping and to prevent blow-out or excessive movement of piping and fittings. Pipe, and equipment supports and hangers shall be manufactured by Elcen, Crawford, Grinnell, or approved equal.
a. Pipe hanger, unless otherwise specified or indicated, shall be ⅝" diameter, hot drawn, threaded steel rods.
b. Maximum spacing for 4" pipe shall be maximum 14'. Regardless of any of the above listed hanger spacing, provide a hanger not more than 12" from each change in direction of piping and @ each valve, drop, or rise.
c. Pipe hangers, unless otherwise specified shall be governed by:
1. No wire or perforated strap hangers will be permitted in any installation of piping work.
2. Additional hangers must be provided at all valve assemblies, automatic valves, bypasses, or elsewhere required to support properly any additional pipe loadings.
3. Nuts used in pipe hanger assemblies shall be hexagon semi-finished American Standard Coarse Series. Hangers shall be secured to rod pendants with two (2) nuts and they shall be jamb-locked after hanger adjustment.
4. Pipe hangers and clamps where hanger or clamp comes in direct contact with copper and brass pipe shall be copper plated or lined, or PVC plastic coated or lined.
5. No item of equipment shall support any of the pipe loading, nor shall any fixture or item of equipment be supported by any of the piping.
9.10 PIPE MARKERS, when requested: Provide pipe markers indicating type of service with appropriate flow arrow when requested. Markers and adhesive shall be serviceable for ambient and surface temperature range -20°F to 150°F. Markers shall be Seton, or approved equal. Arrows 6" long shall be provided at each marker indicating direction of flow. Marker text shall be as specified by FRA.
9.11 CLEANING OF PIPING SYSTEMS: All piping shall be thoroughly flushed out with water to remove any foreign matter that can be removed by flushing. Completely drain piping. Provide all fittings required for flushing works.
9.12 PAINTING OF PIPING, when requested, shall match existing and follow ANSI standards.
10.0 DESIGN GUIDE – NATURAL GAS REPAIRS
The following is a listing of applicable design standards that pertain to this agreement along with every release that is generated.
2-0-C Site Work 2-1-C Utilities CS-4 Sidewalks CS-5 Hardstand CS-6 Barriercurb CS-7 Typical Culvert CU5 CU 5.1 Trench Detail Rev 090420 CU-12 Typical Water Valve-Box CU-13 Utility Marker Post
SPECIAL CONDITIONS
11.1 The Subcontractor shall provide labor, equipment, materials, and supplies that are suitable for the purpose for which they are intended. They shall be the kind and quality requested by FRA. Any delay experienced in the furnishing of Subcontractor equipment, materials and/or supplies, which is the fault of the Subcontractor (or his Sub-Subcontractors) and which causes an increase in the cost of work under this Subcontract, shall be cause for FRA to make an adjustment in the Subcontractor’s invoices. The amount of such adjustment shall be subject to negotiation.
11.2 The Subcontractor and any Sub-tier subcontractor shall be responsible for maintaining satisfactory standards of employee competency, conduct and integrity and shall be responsible for taking such disciplinary action with respect to its employees as may be required.
11.3 The Subcontractor’s representative will be available on a call basis for consultation, preparation of Subcontractor proposals, and discussion relative to FRA operation problems. The Subcontractor supplied representative will be at no additional charge to FRA.
| 1.0 DESCRIPTION OF SERVICES: |
| 2 |
| 2.0 REQUIREMENTS: |
| 3 |
| 3.0 Releases |
| 4 |
| 4.0 BILLING |
| 5 |
| 5.0 EQUIPMENT & TOOLING |
| REPRESENTATIVE SMALL TOOL LIST |
| -B- |
| -H- |
| -T- |
| -Safety Equipment- |
| 6 |
| 6 |
| 6.0 MATERIAL RECEIPT & ACCEPTANCE by FERMILAB: |
| 7 |
| 7 |
| 7.0 PASSAGE OF TITLE |
| 8 |
| 8 |
| 8.0 PAYMENT |
| 9 |
| 9 |
| 9.0 PIPEFITTING REQUIREMENTS |
| 9.1 WORK MAY INCLUDE: |
| 10 |
| 10 |
| 11 |
| 11 |
| SPECIAL CONDITIONS |
File details come from the government source that posted it. Updated .