QA -DS-338500-GD.pdf
PDF 82 KB Posted
- Attached to
- T&M Excavation and Gas Repairs Federal contract opportunity
- Solicitation number
- DS-338500-GD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| EXHIBIT I - Instructions to Offerors.pdf | ||
| AMENDMENT 1.pdf | ||
| IL2022011.pdf | ||
| SF1413-13e (1).pdf | ||
| Fermilab Subcontractor Injury Illness Data Questionnaire.pdf | ||
| Natural Gas Operations Maintenance Program.pdf | ||
| SOW.pdf | ||
| 010010_General_Requirements_Excavation Natural Gas Repairs.docx | DOCX document | |
| 014100 Quality Requirements - March 2022 Q Updates.docx | DOCX document | |
| EXHIBIT I - Instructions to Offerors.pdf | ||
| DS-338500-GD.pdf | ||
| 013100 - ESH REQUIREMENTS Rapid Response Update with Natural Gas Requirements .docx | DOCX document | |
| Exhibit II - Bid Bond FL-41.pdf | ||
| IL2022020.pdf | ||
| PUR-466_Proposal Certifications (1).pdf | ||
| SARC.pdf | ||
| 2022 Construction Insurance Requirements.pdf | ||
| FRA General Terms and Conditions for Construction (06.2022).pdf | ||
| Design Guides.zip | ZIP file |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/21/2022
DS-338500-GD Questions & Answers:
1. The foreman and most crew leaders and welder need their truck with tool. You do not have a rate called out for a shop truck or a welding truck?
A: Shop trucks or welding trucks have not been considered a specialized piece of equipment in our past awards and we are not considering them a specialized piece of equipment in this award.
2. The equipment rates are raw rates no operator costs included?
A: The operator rate to perform services for specialized pieces of equipment should be considered in the operating engineer rate.
3. There is a union cost increase every June 1st. can we give you rates that will increase from June 2023 to June 2024? Instead of trying to cover 2 years of increase in one rate?
A: That should be fine / acceptable.
4. To be clear, 3/4tn Pick-Up Trucks needed to transport Superintendents, Foreman, Laborers and Other Personnel are considered to be incidental to this contract and costs for such should be covered by unit prices in Exhibit III of this proposal?
A: That is an accurate statement
5. To be clear, small tools as described in Section 5 of the SOW are considered to be incidental to this contract and costs for such should be covered by unit prices in Exhibit III of this proposal?
6. To be clear, consumables as described in Section 5 of the SOW are considered to be incidental to this contract and costs for such should be covered by unit prices in Exhibit III of this proposal?
File details come from the government source that posted it. Updated .