This is a Statement of Work (SOW) for the inspection, overhaul, and testing of Woodward Governors used onboard various U.S. Coast Guard vessels. The scope encompasses receipt, disassembly, inspection, condition reporting, overhaul, reassembly, calibration, testing, preservation, packaging, and marking of twelve specific governor models (NSN 2910-01-215-0459 through 3010-01-417-1986) installed on WPB, WMEC, WAGB, WTGB, and WLM vessel classes.
The contractor must obtain Original Equipment Manufacturer (OEM) procedures and Woodward Test Specifications prior to commencing work and perform all overhaul activities in accordance with OEM standards and applicable documents including ANSI/ASQ Q9001-2015, ISO/IEC-17025, and ISO/IEC-16388-2007. Key requirements include submission of detailed arrival/disassembly inspection reports with cost estimates (materials, labor, testing, preservation, packaging, and marking) requiring Contracting Officer approval before proceeding with overhaul work. All replacement parts must be new and manufactured by Woodward Governor Company, with overhauled governors restored to like-new performance standards. Each governor must undergo final acceptance testing at an authorized Woodward facility with detailed test reports submitted to the Contracting Officer. The contractor must maintain a documented quality system, test equipment calibration program conforming to ISO/IEC-17025, and provide space and personnel for all inspections and testing at the contractor's plant or Coast Guard-acceptable facilities. Preservation and packaging must comply with Woodward Governor Company Bulletin 25075A (1975), with each governor individually packed in wooden crates meeting specified dimensions (21" x 21" x 40"), marked with stock number, part number, contract information, overhaul date, and re-inspection date (60 months from overhaul), and affixed with ISO/IEC-16388-2007 Code 39 bar code labels prior to shipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Provisions and Clauses_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION No. E . CHANGE No. .
SPECIFICATION FOR THE INSPECTION AND
OVERHAUL OF WOODWARD GOVERNORS
USED ONBOARD VARIOUS COAST GUARD VESSELS
R-233-0320
ORIGINATED BY B. Staab . DATE 06/2003 .
ORIGINATOR'S COMMAND ENGINEERING LOGISTICS CENTER (ELC) .
DEPARTMENT/DIVISION AUXILIARY EQUIPMENT BRANCH 025 .
UPDATED BY Charles (Dan) Kane (Revision F) . DATE 11/2024 .
INTERNAL REVIEWER E. R. Fischer DATE 06/2003 .
SOWRB APPROVAL . DATE .
SPECIFICATION FOR THE
INSPECTION AND OVERHAUL OF WOODWARD
GOVERNORS USED ONBOARD VARIOUS COAST GUARD VESSELS
1.0 SCOPE
1.1. This document sets forth the requirements for the receipt, disassembly, inspection, condition report, overhaul, reassembly, calibration, testing, preservation, packaging, packing, and marking of Woodward Governors used onboard various Coast Guard vessels.
1.2. GOVERNMENT FURNISHED PROPERTY (GFP) - The listed items are managed by the U. S. Coast Guard Surface Forces Logistics Center, Curtis Bay, MD.
1.2.1. The Contractor shall provide protective storage for the GFP when not in use and safe handling when in use. The storage area shall, at a minimum, be closed on all sides, dry and locked when the property is not in use.
Para- Graph NSN Part Number Application
| a. |
| 2910-01-215-0459 |
| 8573-647 |
| 110 WPB |
| b. |
| 2910-01-467-9285 |
| 8540-634 |
| 110C WPB |
| c. |
| 2910-01-209-6294 |
| J8558-245 |
| 210A WMEC |
| d. |
| 2990-01-148-9821 |
| 8575-262 |
| 210B WMEC |
| e. |
| 2990-01-122-3873 |
| 8240-674 |
| 270 WMEC, SSDG & EDG |
| f. |
| 2910-01-481-4014 |
| 8577-356 |
| 270 WMEC |
| g. |
| 2990-01-225-7497 |
| 8570-378 |
| 400 WAGB, Main Diesel Engine |
| h. |
| 2990-01-226-1107 |
| 8240-763 |
| 400 WAGB, SSDG |
| i. |
| 2910-01-090-1151 |
| EG-B2P |
8240-390
400 WAGB
| j. |
| 2910-01-352-7027 |
| PGA 8558-784 8572-653 |
| 140 WTGB |
| k. |
| 2910-01-509-7773 |
| A-8240-485 |
| 140 WTGB |
| l. |
| 3010-01-417-1986 |
| 8241-853 |
| 225 WLB, 210 WMEC, 175 WLM |
2.0 APPLICABLE DOCUMENTS
2.1. GENERAL – The documents listed in this section are specified in sections 3, 4 or 5 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to insure the completeness of this list, document users are cautioned that they must meet all specified requirements of the documents cited in section 3, 4, or 5 of this specification, whether or not they are listed here.
2.2. GOVERNMENT AND COMMERCIAL DOCUMENTS - The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the Department of Defense Single Stock Point of Specification and Standards (DODSSP) and supplements thereto.
2.2.1. ISO/IEC-16388-2007, Code 39 Symbology, Bar Coding
2.2.2. American Society for Quality (ASQ) – ASQ Q9001-2015, dated 2015, Quality Management Systems-Requirements.
2.2.3. ISO/IEC-17025 3rd Edition 2017-11 General requirements for the competence of testing and calibration laboratories.
2.2.4. Woodward Governor Company
a. Bulletin number 25075A (dated 1975), Commercial Preservation Packaging for Storage of Mechanical-Hydraulic Controls.
b. Test Specification (TSP) for each governor listed in paragraph 1.2.1. A. thru L.
2.3. SPECIFICATION ORDER OF PRECEDENCE - In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3.0 REQUIREMENTS
3.1. GENERAL - Inspections, overhaul and testing of each governor shall be accomplished in accordance with the Original Equipment Manufacturer (OEM) procedures, specifications, references and standard practices and all applicable documents listed in section 2.0 of this specification.
3.1.1. It is the Contractor’s responsibility to obtain the OEM procedures, specifications, references, standard practices and Woodward Test Specifications from Woodward Governor Company, the OEM. The Contractor shall obtain and be in possession of these documents prior to the start of any work.
3.1.2. The overhaul requirement described herein are the considered the minimum necessary and are not intended to replace any procedures, controls, examinations, or tests normally employed by the Contractor to assure the quality of the product. The overhaul of the governor is intended to return the governor’s performance and appearance to a like new condition.
3.2. ARRIVAL/DISASSEMBLY INSPECTION - Each governor received by the Contractor shall be disassembled and inspected to determine the total estimated cost to repair including material, labor and testing costs. A detailed report shall be compiled and submitted to the Contracting Officer to include the following information:
3.2.1. No further work shall be accomplished until the report is approved by the Contracting Officer.
a. Date of inspection
b. Inspector’s name
c. Identification of governors by serial number, part number, and stock number
d. Condition of shipping crate and cost of any repair
e. List of each part requiring replacement, by actual part number, and their applicable costs
f. Cost of overhaul labor
g. Comments, if any, pertaining to any unusual observations during inspection and disassembly.
h. Configuration/upgrade recommendations and their associated costs.
i. Inspection data sheets describing all deficiencies found and the proposed corrective action.
j. Dimensional inspection noting all items that are out of tolerance.
3.2.2. The estimate shall include all material, parts, labor, testing, and preservation, packing, packaging, and marking costs.
3.3. OVERHAUL REQUIREMENTS – Each governor shall be overhauled, calibrated, and tested in accordance with the documents cited in section 2.0 of this specification.
a. All replacement parts shall be new and manufactured in accordance with Woodward Governor Company, the Original Equipment Manufacturer (OEM).
b. Each overhauled governor shall be restored to the performance and operating standards of a new governor.
c. Each overhaul shall include disassembly and cleaning of all parts of all contaminants including but not limited to dirt, grease, oil and paint.
d. All gaskets, seals, o-rings, bearings, and parts worn or damaged beyond manufacturer’s tolerances shall be replaced.
e. Each governor shall be assembled by Woodward Governor factory trained service technicians to ensure that all OEM specified clearances, procedures, calibrations and torque values are applied.
f. Each data plate shall be updated to reflect the newly overhauled configuration
3.3.1. The following applies to Governor, Diesel Engine, p/n 8575-262 (210B WMEC), NSN 2990-01-148-9821 paragraph 1.2.1.i of this specification.
a. All governors arriving at the Contractor’s facility marked with part numbers 369413, 8558-555, or 8571-624 shall be repaired, configured, calibrated, marked and upgraded in accordance with new Woodward spec 8575-262. This new part number (8575-262) specifies (but is not limited to) the following new settings:
1. Removal of the droop linkage as per new Bill of Material (see Woodward Data Sheet)
2. 10 psi governor setting: 440-460 rpm governor speed
3. 59 psi governor setting: 1074-1084 rpm governor speed
4. High speed dump valve setting of 1130-1140 governor rpm
5. Zero psi air idle: 432-437 governor speed
3.4. FINAL ACCEPTANCE TEST - Each overhauled governor shall be tested at an authorized Woodward Governor test facility. Each governor shall be calibrated to meet the current applicable Woodward TSP except as modified in paragraph 3.3 of this specification.
3.4.1. A detailed test report shall be compiled and submitted to the Contracting Officer to include the following information:
a. Date of test
b. Tester's name
c. Identification of governors by serial number, part number, and stock number
d. Comments, if any, pertaining to any unusual observations during testing
e. A chronological list of all tests and calibrations performed with the resultant values/readings including pass/fail criteria.
f. Dimensional report with all final clearances and tolerances.
g. Signature of Government witness, if any.
3.5. NOTIFICATIONS & INSPECTIONS - The Contractor shall notify the Contracting Officer at least ten (10) calendar days prior to any inspections or testing required herein.
4.0 QUALITY ASSURANCE
4.1. RESPONSIBILITY FOR INSPECTION - The Contractor is responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment needed to conduct all required inspections. All inspections and testing shall be performed at the Contractor's plant or at other facilities acceptable to the Coast Guard. The Coast Guard reserves the right to verify or have performed any of the inspections set forth in this specification where such inspections are deemed necessary to assure that supplies and services conform to the prescribed requirements.
4.2. RESPONSIBILITY FOR COMPLIANCE - All items shall meet the requirements of this specification. The inspections set forth in this specification shall become part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements in this specification shall not relieve the Contractor of the responsibility of assuring that all products or services submitted to the government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.
4.3. QUALITY SYSTEM - The contractor shall maintain a documented Quality System in accordance with ANSI/ASQ Q9001-2015.
4.4. INSPECTIONS AND TESTS - The inspections and tests required herein are the minimum required and are not intended to replace any controls, examinations, inspections or tests normally employed by the Contractor to assure the quality of the equipment.
4.4.1. Arrival/Disassembly Inspection in accordance with paragraph 3.2.
4.4.2. Final Acceptance Test in accordance with paragraph 3.4.
4.5. CALIBRATION SYSTEM - The Contractor, as well as any subcontractors, shall maintain a test equipment calibration program conforming to ISO/IEC-17025 3rd Edition 2017-11. The calibration system records shall be maintained for inspection for the duration of any contract referencing this specification.
4.6. FAILURE RESPONSIBILITY - If a governor fails to pass any inspection or test, the Contractor shall report the failure and the recommended corrective action to the Contracting Officer. If approved, the corrective action on the materials or processes shall be accomplished in accordance with this section.
4.6.1. The inspection/test shall be discontinued until all corrective action has been taken.
4.6.2. After all corrective action has been taken; the inspection/test shall be continued or repeated, at the option of the Contracting Officer.
4.6.3. Acceptance shall be withheld until re-inspection has shown that the corrective action was successful and the item satisfactorily passes all inspections and tests.
4.6.4. All corrective actions shall be documented as part of the contractor's inspection system, and submitted for approval to the Contracting Officer.
4.6.5. Each corrective action report shall include, but not be limited to, the cause of each defect, corrective action suggested, and steps taken to prevent a recurrence of each defect.
4.7. TEST AND INSPECTIONS - The Contractor shall demonstrate, in the presence of the USCG Quality Assurance Representative, that each governor overhauled under this contract has been calibrated in accordance with, and meets the parameters of the current applicable Woodward MASTER TSP as modified in paragraph 3.3 of this specification.
4.8. REPORTS - One copy of any required inspection, test or tolerance check shall be sent to the Contracting Officer, including one copy of the most current MASTER Woodward TSP for each governor covered herein.
4.8.1. A copy of any test, inspection, or calibration record, and the current Woodward TSP for the governor to be tested shall also be turned over to the Quality Assurance Representative upon his arrival at the Contractor's plant.
4.9. PACKING INSPECTION – The Contracting Officer shall be notified prior to the packing and marking of the completed units in accordance with section 3.5 of this specification.
5.0 PRESERVATION, PACKAGING, PACKING AND MARKING (PPP&M)
5.1. PRESERVATION – All governors shall be preserved and packaged in accordance with Woodward Governor Company bulletin 25075A, dated 1975 titled Commercial Preservation Packaging for Storage of Mechanical-Hydraulic Controls.
5.1.1. Each governor shall be completely assembled and ready for installation.
5.1.2. All openings shall be sealed with plastic caps.
5.2. PACKAGING & PACKING
5.2.1. Each overhauled and preserved governor shall be sealed in accordance with Woodward Governor Company bulletin 25075A.
5.2.2. Each overhauled, tested and preserved governor listed as GFP in paragraphs 1.2.1.a., thru 1.2.1.L, shall be individually packed in a wooden box, constructed as described and pictured in Attachment No. 1, Pictures 1 thru 9.
5.2.3. If the Contractor deems the containers the governors were received in to be in compliance with paragraph 5.2 of this specification, the containers can be reused.
5.2.4. Should new containers be required, or existing containers repaired, labor and material costs to accomplish this shall be listed on the Arrival/Disassembly Inspection Report as described in paragraph 3.3 of this specification.
a. The lower base shall be constructed of 4” X 4” lumber skids (2 each) and ¾” X 20” X 20” plywood, with a ¾” X 1 ¾” X 20” nailer strip screwed to the front and back of the base to allow the cover to be attached (screwed) to it (see photo No. 1).
b. The unit base shall be constructed of 3/4” X 16” X 16” plywood and 2” X 4” supports (see photo’s No. 2 & 3). The unit base may require a hole of sufficient diameter to allow passage of the drive shaft of the governor.
c. The governor shall be attached to the unit base, through the governor base plate, using 4 - 3/8” X 2.5” bolts (minimum), 8 washers, 4 lock washers, and 4 nuts.
d. The top and sides of the crate shall be constructed using ½” plywood and 2” X 4” framing (see photo No. 4).
e. The finished crates shall be 21” X 21” X 40”.
f. The crates shall be assembled using decking screws (no nails are to be used).
g. After the governor is sealed in accordance with Woodward Governor Company bulletin 25075A and after the governor is packed in accordance with 5.2.4. a. through f. above, the void between the governor and crate sides and lid shall be filled with spray foam.
5.2.5. Each overhauled, tested and preserved governor listed as GFP in paragraphs 1.2.1. A. thru 1.2.1.L., shall be individually packaged and packed in wooden boxes constructed of 1/2” plywood, minimum, with internal or external support bracing.
a. A clearance of not less than 2” shall be allowed between the governor and the closest member of the sides, ends or top of the crate.
b. Bubble wrap or spray foam shall be used as packaging material of adequate thickness so as to properly cushion the governor to prevent damage and not to allow movement of the governor within the wooden crate.
c. The crates shall be assembled using decking screws (no nails are to be used).
5.3. MARKING - The marking described herein shall be placed on the longest two sides of each box (on opposite ends). The lettering shall be black painted stencil and permanently affixed to each container. The lettering shall be at least 3/4" high, and be applied on a highly contrasting painted white background.
5.3.1. All previous markings and Quality Assurance Decals shall be completely removed from the reusable shipping container prior to application of any new markings.
5.3.2. This marking shall consist of the following information.
| STOCK NUMBER | See Contract | ||||
| ITEM NAME | See Contract | ||||
| PART NUMBER | See Contract | ||||
| CONTRACT NUMBER | See Contract | ||||
| DELIVERY ORDER NUMBER | See Contract | ||||
| GROSS WEIGHT | As Determined by Contractor | ||||
| CONDITION CODE | CONDITION A | ||||
| QUANTITY & UNIT OF ISSUE | 1 EA | ||||
| OVERHAUL DATE | As determined by Contractor | ||||
| RE-INSPECTION DATE | 60 Months from Overhaul Date | ||||
| COAST GUARD SFLC MATERIAL | |||||
| REUSABLE CONTAINER | |||||
| DO NOT DESTROY |
5.3.3. Stenciling on each crate shall be as pictured in photo Nos. 5, 6, 7, & 8, except the Contractor shall include the appropriate stock number and part number for each applicable governor enclosed. Additionally, the stenciling shall be applied to a contrasting white painted background.
5.4. BAR CODING – A Bar Code label shall be attached to each governor shipping container prior to shipment for the Contractor’s facility.
5.4.1. All bar coded labels shall be in accordance with ISO/IEC-16388-2007, Code 39 Symbology, Bar Coding
a. The actual labels shall be Type “V”, Grade “A”, Style “2”, Composition “b” with plastic laminate.
6.0 NOTES
6.1. GOVERNMENT & COMMERCIAL DOCUMENT SOURCES
6.1.1. GOVERNMENT DOCUMENTS
a. USCG Surface Forces Logistics Center 2401 Hawkins Point Road Baltimore, MD 21226-5000 410-762-??????????????
b. Department of Defense Single Stock Point (DODSSP) 700 Robbins Avenue Building #4, Section D Philadelphia, PA 19111-5098
FAX 215-697-9398
http://dodssp.daps.dla.mil/
c. DOD & Navy Publications and Forms (Other Than DODISS) Naval Publication and Forms Center 5801 Tabor Ave.
Philadelphia, PA 19120 215-697-2197
6.1.2. COMMERCIAL DOCUMENTS
a. Woodward Governor Company 3800 north Wilson Ave. P.O. Box 3800 Loveland, CO 80539-3800 970-663-3900
b. American Society for Quality (ASQ) 611 E. Wisconsin Ave., P.O. Box 3005 Milwaukee, Wisconsin 53201-3005 800-514-1564 http://asq.org/
International Organization for Standardization ISO Central Secretariat Chemin de Blandonnet 8
CP 401
1214 Vernier (Geneva) Switzerland E-mail: central@iso.org Tel.: +41 22 749 01 11 Fax: +41 22 733 34 30 ISO - International Organization for Standardization
USCG - SFLC
DATE - 06/2003
R-233-0320
REVISION F 11/2024
PICTURE No. 1
PICTURE No . 2
PICTURE No. 3
PICTURE No. 4
PICTURE No .5
PICTURE No .6
PICTURE No .7
PICTURE No. 8
PICTURE No. 9 image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg