SOW

Tower Crane #1 Structural Inspection

Contractor to provide service for Structural and Mechanical Inspection of Tower Crane #1. The areas of inspection shall be the Main Boom, Gantry Structure, Gantry Mechanics and the Hoist Winch Assemblies. Visual and ND Testing will be done throughout the Crane to Generate a written report of the Inspection. The Period of Performance shall be determined when the contract is awarded. A report with pictures shall be provided of the Inspection within (4) days after the completion of the Inspection. The Contractor may need to remove small areas of paint to measure welds or joints then cover them with primer after the Inspection.

File details come from the government source that posted it. Updated .