Text version
Department of Homeland Security United States Coast Guard Base Cleveland Housing Division
Scope of Work (SOW) Housing Site Cheboygan, MI
For Main Space Laminate Wood Flooring Install (Living Room, Dining Room, Hall, Kitchen if non-invasive) Carpet Replacement in Bedrooms and Stairs (if applicable)
Point of Contact (POC) DC1 Zachary Noftz 231-627-7882 or 231-740-9615 Or DCC Dana Tull (OHMC)
(714) 580-4780
Site Address 721 Blackthorn Dr. / 723 Blackthorn Dr. (Two Story Attached Units)
711 Blackthorn Dr. (One Story House Unit)
Scope of Work
Carpet Area -
1.1 The contractor is to remove all carpet on stairs and on the second floor along with the padding in all high traffic areas to be replaced where needed to be replaced and dispose of all materials off the USCG property at the contractor expense to an approved disposal site.
1.2 The contractor will repair or replace any damaged or loose tack strips as needed; inspect and repair the subfloor for any loose staples, screws, nails, and etc; identify and report any water, pet staining or odors, or any other abnormal damages that may cause further damage or odors to the USCG POC before continuing work.
1.3 All flooring will need to be cleaned of all loose debris, swept and/or vacuumed, before installing any new materials.
1.4 Install any needed rubber shims to level the carpet with any other flooring in use, and install transitions to areas connecting to different flooring materials.
1.5 Install stain resistant padding in the areas removed and carpet following the manufacturer’s recommendations.
1.6 Carpet installation on stairs is to be tucked.
Laminate Flooring Install –
1.7 Contractor to remove all installed carpet and padding in the downstairs area of the home.
1.8 Contractor to remove all tack strips from old removed carpet.
1.9 Contractor will remove all tile flooring to include any old flooring that previously was installed on top of if applicable.
1.10 Contractor to take all lower level flooring down to subfloor level in areas to have laminate flooring installed.
1.11 Contractor will flush cut all flooring along back and side of kitchen floor cabinetry in dining room to remove any tile or flooring in dining room without disturbing the kitchen cabinetry, flooring in kitchen area will remain along transition of kitchen entry in a clean cut manner with a transition strip to match flooring being installed. If able to lay flooring in kitchen without cabinetry disturbance then the flooring will be placed in kitchen as well.
1.12 Contractor is to fill any cracks found in subfloor work area and if necessary level sub-floor in preparation of new laminate flooring installation.
1.13 Contractor will use an underlayment to the specifications listed below for an extra noise and moisture barrier between the subfloor and the laminate floor to be installed. This will be provided by the contractor.
1.14 The specific flooring to be installed is indicated below under materials, this will be provided by the contractor.
1.15 All transition strip required through the unit will matched with the flooring installed. Minimal use of transitional strips is required per contract, if flooring can be floated through multiple rooms then install will be completed in this manner.
1.16 Install area is to include all alcoves, closets and other flooring areas in accordance with the POC guidance upon contractor’s walkthrough for accurate worksite measurements.
1.17 This flooring will not be installed in any rooms where Toilet or Shower facilities are present. Flooring in such spaces is to be properly separated with a transition strip to match the install floor coverings being placed by this contract. The laminate in restroom areas are not covered for upgrade or replacement in this contract.
Material/ Part Information
| 2.1 | All materials will be supplied by the contractor. |
| 2.2 | 8# 3/8” Spill guard padding is to be used. |
| 2.3 | Shaw Camden Harbor II carpet in the Pebble color is to be used. |
| 2.4 | All rubber shims used will be Johnsonite LS-40-E (D or E according to thickness required). |
| 2.5 | All transitions and other exposed materials planned for use will have to be approved by the POC listed for quality and color. Johnsonite #CEXXC Aluminum track and Johnsonite rubber #47 chocolate brown both in 12’ length should be used. |
| 2.6 | Underlayment for all hard flooring is to be a minimum of 2mm thick and will provide moisture barrier protection and sound reduction. One option would be Silver Vapor’s 3-in-1 flooring underlayment (2mm). |
| 2.7 | All hard flooring to be installed will be Berry Alloc Manufacture, Pure Click 55 style, Lime Oak Color 623M, 360 degree fitment silent floor. Any deviation from this must meet the same specifications of the above flooring, especially for thickness, durability and function. All deviations outside the flooring listed above must be previously approved by the Coast Guard listed POC. |
| 2.8 | Approximate square footage is listed below per unit per install area; contractor is to measure for accuracy and may do so prior to submitting a bid, padding and carpeting measurements are to include stairs and upstairs hallways: |
| Carpeted Estimate | Hard Floor Estimate | |||
| 711 Blackthorn Dr. – | 470 sq. footage | 530 sq. footage | ||
| 721 Blackthorn Dr. – | 600 sq. footage | 460 sq. footage | ||
| 723 Blackthorn Dr. – | 600 sq. footage | 410 sq. footage |
References
3.1 It is encouraged that the contractor review the work site before quoting, There will be a one-time group showing of example 2, 3, and 4 bed units for quoting purposes.
Starting @ 1000 EST 09Mar2021DC3 Kristian Lett will be the field representative for the Flooring Contract Job Walk and will commence in the following order:
Job Site #1-723 Blackthorn Drive, Cheboygan, MI Job Site #2-721 Blackthorn Drive, Cheboygan, MI Job Site #3-711 Blackthorn Drive, Cheboygan, MI
DC3 Lett will meet contractors at the first parking lot entrance on right as you enter Blackthorn Drive in Cheboygan Housing.
These three Job Sites are next to each other in sequence in a counter clockwise rotation. Contractors can park at the lot where 721 and 723 are located.
711 is the next home in a row in Cheboygan Housing.
3.2 All work is to be completed shall comply with Federal, State and Local Laws, Codes and Regulations.
Liabilities
4.1 The contractor will be financially responsible for any and all damages incurred while working on Government property. There will be a pre-work walkthrough with Coast Guard personnel and the contractor at each job site prior to the contract start and contractor must identify any damages in their work area that are pre-existing, or along their access route to their work area. (Doorways, Doors, Walls, Jambs, Flooring, etc.) Contractor has to identify the pre-existing damage to the Local Housing Representative in writing and provide a copy of the signed document by both the contractor and the local housing representative dated for the start date of the work performed in said unit or they can be held liable for the damages.
Coordination
| 5.1 | Once awarded all communications will go through Local CG POC listed for scheduling, all modifications or contract inquiry will go through the Contracting Officer or their representative. No work can be modified or changed without their permission and the prior approval. |
| 5.2 | Work to be completed should have minimal impact on the unit’s operation. In the event any of the utilities need to be secured, these items should be well planned out. |
| 5.3 | Normal work hours for the unit is 8:00 AM to 3:00 PM, Monday-Friday, excluding all Federal Holidays. Extended work day hours can be accommodated as long as the 1 week/5 work day window of contractor’s access is maintained. Other contractors are scheduled in the same unit immediately following. Any work outside these times need to be worked out ahead of time with any change in cost being highlighted upfront and confirmation by contracting officer will have to be approved as an amendment to the contract. |
| 5.4 | All required License, Certificates, Accreditation Card, etc. will be submitted with the quote or bid. There is also a minimum of two references being requested for submission with these documents. |
Project Completion
| 6.1 | All work completed must meet the Local CG POC’s expectation as outlined in this SOW. The site is to be at a minimum as clean of a condition it was found in. All trash, debris, materials removed, etc. should be properly disposed by the contractor. There will be no on-site storage available for the duration of this project. |
| 6.2 | This contract will be awarded for multiple addresses, all with different start schedules; these will not run consecutively but as available units become vacant. The contractor will be given a one week window to schedule and complete each job. The Coast Guard POC will attempt to provide a 30 day notice prior to the availability timeline as they have the ability to do so. All jobs will be completed as the contract is listed or any modifications agreed to with no new additions or modifications allowed to the contract after August 31, 2021 in preparation of the end of FY21. |
Expected Units to become Vacant
| Address |
| Style |
| BD |
| BA |
| Total Rooms |
| Gross Square Feet |
| Net Square Feet |
| Estimated Vacancy Date |
| Flooring |
Required
| 711 BLACKTHORN DR |
| SD |
| 3 |
| 2 |
| 6 |
| 2050 |
| 1800 |
| TBD Between May- July |
| Yes |
| 721 BLACKTHORN DR |
| TA |
| 4 |
| 1.5 |
| 6 |
| 1950 |
| 1350 |
| TBD Between May- July |
| Yes |
| 723 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| TBD Between May- July |
| Yes |
Other Addresses with potential to be added or swapped with same size and style.
| Address |
| Style |
| Bedrooms |
| Baths |
| Total Rooms |
| Gross Square Feet |
| Net Square Feet |
| 630 BLACKTHORN DR |
| SD |
| 3 |
| 2 |
| 6 |
| 2500 |
| 1800 |
| 635 BLACKTHORN DR |
| SD |
| 4 |
| 2 |
| 7 |
| 3130 |
| 1800 |
| 640 BLACKTHORN DR |
| SD |
| 3 |
| 1 |
| 6 |
| 3200 |
| 1800 |
| 655 BLACKTHORN DR |
| SD |
| 3 |
| 2 |
| 6 |
| 2050 |
| 1800 |
| 705 BLACKTHORN DR |
| SD |
| 4 |
| 2 |
| 7 |
| 2550 |
| 1800 |
| 706 BLACKTHORN DR |
| TA |
| 4 |
| 2 |
| 7 |
| 1950 |
| 1350 |
| 710 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 712 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 2050 |
| 1300 |
| 721 BLACKTHORN DR |
| TA |
| 4 |
| 1.5 |
| 6 |
| 1950 |
| 1300 |
| 722 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1227 |
| 1300 |
| 723 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 725 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 726 BLACKTHORN DR |
| TA |
| 4 |
| 1 |
| 7 |
| 1950 |
| 1350 |
| 727 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 7 |
| 1900 |
| 1350 |
| 732 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 736 BLACKTHORN DR |
| TA |
| 4 |
| 1 |
| 7 |
| 1950 |
| 1350 |
| 641 BLACKTHORN DR |
| SD |
| 4 |
| 2 |
| 7 |
| 2550 |
| 1800 |
| 700 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 702 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 711 BLACKTHORN DR |
| SD |
| 3 |
| 2 |
| 6 |
| 2050 |
| 1800 |
| 704 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 714 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 716 BLACKTHORN DR |
| TA |
| 4 |
| 2 |
| 7 |
| 1950 |
| 1350 |
| 720 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1950 |
| 1300 |
| 724 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 730 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
| 734 BLACKTHORN DR |
| TA |
| 3 |
| 1.5 |
| 6 |
| 1900 |
| 1300 |
image1.jpeg