Scope of Work USCGC Chippewa/USCG Facilities, Paris Landing, TN Barracks Air Conditioner replace
1.0 General
1.1 Scope: The work to be performed consists of removal and replacement of 02 complete heat pump units. The contractor shall recover any remaining refrigerant within the systems before breaking any connections. Contractor shall remove current heat pump units and prep the site for installation of new units. Contractor shall provide all labor, materials and tools to complete job. Contractor shall provide all duct and electrical modifications necessary for replacement units. Contractor shall fabricate and install new condensate drain line and flush and pressure test all remaining refrigerant lines. Contractor shall install new thermostats. An operational test of the system shall be performed in the presence of a coast guard inspector.
Current Make and models are as follows:
(01)-Goodman MFG - Model # SSZ140481AG Refrigerant- 410A, 208-230Volts, 1 Phase 60HZ (02)-Rheem - Model # RPNL-048JAZ refrigerant 410A 208-230Volts, 1 Phase 60HZ
| 1.2 Location of site: | USCG Paris Landing | |
| 700 Coast Guard Rd. | ||
| Buchanan, TN 38222 |
1.2.1 POC: MKC Dustin Block dustin.k.block@uscg.mil 731-642-7181 MK1 Erik King erik.m.king@uscg.mil 731-642-7181
1.3 Site Examination: It is recommended that bidders perform a site visit to inspect work to be performed and ensure adequate capacity unit is selected and all related materials needed. Contractor can contact POC’s listed to arrange access to facility.
1.4 Availability of Utilities: Water and electricity receptacles available.
1.5 Contractor Use of Premises: Contractor will be working on an operational Coast Guard installation. Access will be granted building be worked on and necessary immediate area. Access to other buildings must be approved by above POC.
1.6 Area of Work: The contractor shall be responsible for restoring the work area to it original condition at the completion of work. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risk of loss.
1.7 Clean Up: The Contractor shall keep the work area clean, free from accumulation of waste materials and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes
1.8 Safety and Certifications: Contractor performing work on refrigerant system shall be EPA certified and follow all applicable laws pertaining to AC&R repair. Contractor shall provide all required personal protection equipment (PPE).
2.0 Removal of old Heat Pump units.
2.1 The contractor shall remove current heat pump units and verify compatibility with replacement system.
2.2 Install new Heat Pump units.
2.2.1 Contractor shall install replacement heat pump units with compatible units of 4 ton capacity and 14 S.E.E.R rating.
3.0 Waste and Debris
3.1 Contractor is responsible for all cleanup and disposal of the work area.