United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
Building Windows and Doors Tint Installation
USDA, Agricultural Research Service (ARS), US Vegetable Laboratory 2700 Savannah Highway Charleston, SC 29414
Prepared by: Robert Simmons December 12, 2022
GENERAL REQUIREMENTS
The contractor shall provide all material, labor, and equipment to fulfill the requirements of this statement of work. Contractor shall provide the following services.
Remove the blinds from all windows on the front the building. USDA to supply lift. Vendor to remove all scrap materials.
Clean, prep, and tint windows on the front of the building with a dark gray high-performance tint (30% ceramic) to reduce heat for the following sizes:
1st Floor:
40 w x 29 h qty of 29 , 234 square feet 40 w x 44 h qty of 29, 354 square feet 40 w x 30 h qty of 29, 242 square feet
2nd Floor 41 w X 29 h qty of 40, 330 square feet 41 w x 44 h qty of 40, 501 square feet
Lobby 37 w x 37 h qty of 58, 551 square feet 19w x 37 h qty 60, 293 square feet 37w x 61 h qty 4, 63 square feet 19w x 61 h qty 6, 48 square feet
Doors 26w xx 80 h qty 2, 29 square feet
The contractor will be responsible for verification of measurement accuracy (see pictures of building location).
Location POC is Robert Simmons at Robert.Simmons@usda.gov or 843-906-0333.
B. WORKING HOURS
All work shall be performed during normal working hours of this facility, 8:00am to 4:00pm, Monday through Friday, except Government holidays. Work performed outside the normal working hour shall be scheduled in advance.
C. SECURITY
Contractor shall sign in all employees working on the job site. Due to Covid-19 protocol, temperature checks and masks shall be used while in the facility.
D. FINAL INSPECTION
POC will perform a final inspection. When the final inspection is to be held, it is the responsibility of the Contractor to setup an appointment with the POC and arrange for a walk-through of the project. Any and all "Punch List" items that are the result of this final inspection shall be completed within ten (10) calendar days.