SOW Building 34 AC Units with pics 42524.docx
DOCX document 8 MB Posted
- Solicitation number
- 12405B24Q0373
About this file
This document is a Statement of Work (SOW) for the replacement of two wall-hanging air conditioning units in Building 34 of the USDA, ARS, Sugarcane Field Station in Canal Point, Florida.
The SOW requires the contractor to provide all labor, materials, and equipment to remove the existing air conditioning units and install two new wall-hung units. Key details include: the contractor must submit information/submittals on the proposed equipment prior to starting work; the work must be completed within 14 days of equipment delivery; the government will provide utilities but no other services; the contractor is responsible for disposal of the old units and cleanup; and the contractor must start up and test the new units, provide documentation, and demonstrate their operation to the government. The SOW includes detailed requirements for the demolition, installation, and start-up/checkout processes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_1130.JPG | JPG image | |
| IMG_1131.JPG | JPG image | |
| Service Provisions 1135444.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work For Replacement of Two Wall Hanging Air Conditioning Units Building 34
Section 1 GENERAL
1.1 SCOPE OF WORK. The Contractor shall provide all material, personnel, and equipment, tools, fuel and other items or services necessary to remove then install two wall hanging air conditioning units. The air conditioning units are located on the east end of building 34 of the USDA, ARS, Sugarcane Field Station. The USDA, ARS, Sugarcane Field Station is located at; 12990 Hwy 441N, Canal Point, FL 33438.The Contractor shall provide information/submittals on the air conditioning and heating equipment the Contractor proposes to install. The information/submittals shall be provided to the Government prior to starting the project. The information/submittals shall be supplied to the Government Contracting Officer, Contracting Officer Representative, and the Sugarcane Field Station Administrative Officer.
1.2 PHYSICAL SECURITY. The Contractor shall be responsible for safeguarding all government property. Prior to the end of each workday the Contractor is required to secure their equipment and leave the site before the lock down of the facility. The Government is not responsible for loss or damage to the Contractors equipment during the contract.
1.3 HOURS OF OPERATION. The Contractors scheduled performance of these services must fall within the normal business hours of the Sugarcane Field Station. The Sugarcane Field Station’s normal business hours are 7:30am to 4:00pm, Monday through Friday. Any work proposed by the Contractor outside of the normal business hours will need to be approved by the Government Contracting Officer, Contracting Officer Representative, and the Sugarcane Field Station Administrative Officer.
1.4 PROJECT SCHEDULE AND DURATION. The Contractor shall have 14 days, from delivery of the air conditioning and heating equipment to complete the removal and installation work. It is recognized that the air conditioning and heating equipment may not be readily available, but the Contractor shall make an effort to quickly procure and deliver the equipment to the job site. Therefore, the Contractor shall be required to share with the Government Contracting Officer, Contracting Officer Representative, and the Sugarcane Field Station Administrative Officer, information regarding the time frame of when the equipment is ordered and the equipment’s expected delivery. The Government Contracting Officer has the final say on anything related to the contract.
Section 2 GOVERNMENT FURNISHED PROPERTY AND SERVICES.
2.1 GENERAL. The Government shall provide, without cost, the facilities, equipment, fuel and services listed below.
2.2.1 Government furnished utilities will be provided where available.
2.1.2 Government furnished restrooms will be available in building 34.
2.2 Services. The Government shall provide, without cost, the services listed below.
2.2.1 No Government services will be provided.
Section 3 CONTRACTOR FURNISHED ITEMS AND SERVICES
3.1 GENERAL. Except for those items or services specifically stated to be Government furnished in Section 2, the Contractor shall furnish everything required to perform this Statement of Work. The Contractor shall be responsible for removing all construction material, debris and abandoned appurtenances.
SUBMITALS
The Contractor is required to submit copies of all required submittals to the Contracting Officer, Contracting Officer Representative and the Administrative Officer, prior to starting work. The material listed is referenced for performance quality only. The Contractor shall provide equipment equal to the below items.
1. Bard wall mounted air conditioning unit, W36AB-A08
| 36,000 Btu capacity cooling, Electric Heat Strip 8 KW |
| 230/208V/60Hz/1 phase |
| Dimensions, 80” high by 43” wide by 22” deep |
| 2. | Honeywell Home Low Voltage Thermostat |
| Mfr. Model TH6110D1021 |
EHIBIT 1
The Contractor shall provide all labor, materials and equipment to remove two Bard Co. wall hung air conditioners, then install two new wall hung air conditioners. Work includes but is not limited to: (1) Disconnecting the electrical circuits and the thermostat control wiring. (2) Disconnecting the supply and air return duct. (3) Removing the wall hung air conditioning units from the wall. (3) Attaching the two new wall hung air conditioners securely to the wall. (4) Connecting the air conditioners to the existing supply and return ducts. (5) Connect the air conditioners to the buildings air conditioning electrical circuits. (6) Install new programable thermostats and control wiring. (7) Repair all building sub wall sheeting and exterior paneling that was damaged or removed during demolition and installation. (8) Dispose of the old air conditioning units and construction trash. (9) Start the new air conditioning units make any adjustments necessary to provide building comfort and maximum efficiency.
DEFINABLE FEATURES OF WORK
1. DEMOLITION of AC units. The Building 34 (which has these 2 units) is a 50’ by 30’ building with a meeting room, office, restrooms and work rooms. The building is constructed on a metal frame, similar to a double wide mobile home or portable classroom. Each of the 15’ by 50’ halves of the building are cooled and heated by a 3 Ton wall hung air conditioning unit. The air conditioner unit on the south half of the building is a Bard model W36A2. The dimensions of the Bard W36A2 unit are 70” tall by 38” wide by 17” deep. The air conditioner unit on the north half of the building is a Bard model WA351.
The Contractor shall turn off the electrical supply circuits to both units. The electrical breakers are located in electrical panels located in the north and south work rooms of the building. The Contractor will ensure the electrical supply circuits remain off and locked out until the new air conditioning units are ready for start-up. The Contractor will take precautions to protect the electrical supply wiring, so that it can be reused for the new air conditioner units. The Contractor shall disconnect the existing thermostats and control wiring and remove the existing thermostats. The new thermostats will be relocated, so the exiting thermostat wiring can be cut back and abandoned in place, within the wall. The Contractor shall disconnect the supply air duct and the return air duct for both air conditioning units. The Contractor will take precautions to minimize damage to the duct and duct connections, these items will be reused when installing the new units. The Contractor will be responsible for the proper disposal of the old air conditioning equipment including the removal from the Sugarcane Field Station property.
2. EQUIPMENT INSTALATION. The Contractor shall follow the air conditioning equipment manufacturer's instructions for installation of the new air conditioning units. The new air conditioning units will be installed in the same areas where the old air conditioning equipment was removed. The Contractor shall cut and remove enough of the Hardie Board siding to fit the new wall hung units to the building’ s plywood sheeting and wall framing. The Contractor will be responsible for any duct transitions or duct repairs, that may have occurred during demolition, needed to connect the new equipment to the buildings existing supply and return ducts. All duct connections will be secured with fasteners, clamps then taped and sealed with duct mastic. The Contractor shall extend the air conditioner’s condensate drain lines so that condensate drains off the slab the building is placed on and away from the building. The drain lines will be sloped so that the condensate drains and does not collect in the drain lines. The drain lines will be secured to stay in place. As stated in DEMOLITION the Contractor is responsible for protecting the existing electrical supply wiring for reuse. If the Contractor damages the existing electrical supply, the Contractor will be responsible for replacing the electrical conductors. The Contractor will be responsible for sizing and selecting and installing the proper electrical disconnecting means to protect the equipment. The thermostats used to control the air conditioners will be relocated. The Contractor shall provide and install two new thermostats and control wiring. The thermostat for the north unit will be located in the large meeting room. This thermostat will be mounted on the wall between the cabinet that contains the sink and the doorway that leads to the hallway. The thermostat will be mounted 60” up from the floor. The thermostat wire shall be run above the drop ceiling grid and panels. The thermostat wire will be run inside the wall cavity before attaching to the thermostat. The new location for the north thermostat is 30’ from the old thermostat location. The thermostat for the south air conditioner will be located in the hallway on the wall across from the men’s and women’s restrooms. The thermostat will be centered on the wall. The Contractor will use the same plan of attack that was laid out for the north thermostat to install the south thermostat. The new south thermostat location is 20’ from the old south thermostat location. The Contractor shall replace and repair all Hardie Board Siding material damaged or removed during the demolition or installation. The Contractor shall install additional siding where the physical size of the new air conditioners leaves gaps uncovered by siding. The Contractor will use new materials that match the existing siding in material composition, width and texture. The Contractor will install new siding that vertical joints are not stacked. Vertical joints will be offset by a minimum of 6”. All new siding joints will be caulked with an interior/exterior elastomeric caulk, that is paintable. The Contractor shall paint the new siding and trim to match the buildings existing color. The Contractor will apply two coats of paint.
3. START-UP AND CHECKOUT. The Contractor shall provide and install air filters in each unit. The Contractor shall start and operate both new air conditioning units. The units shall be operated and tested in air conditioning mode and heat mode. The Contractor will measure each unit’s voltage and amperage draw and determine if the machines are operating within the manufacturer's specifications. The Contractor will test each air conditioners thermostat and control wiring and ensure correct operation in both heat and cooling modes. The Contractor will test each unit in air conditioning mode to ensure the equipment is working at the correct level of efficiency according to the manufacture’s specifications for the given climatic conditions. (correct super heat and sub cooling) The Contractor will correct all deficiency’s, with the equipment, discovered during the operation and test. The Contractor will record all readings taken during the testing phase and present those findings to the Contracting Officer, Contracting Officer Representative and the Administrative Officer. The Contractor shall turn over all documentation regarding the equipment’s operation, maintenance and installation. This information will be turned over to the Contracting Officer, Contracting Officer Representative and the Administrative Officer. The Contractor will demonstrate the correct operation of the air conditioning and heating units to the Contracting Officer, Contracting Officer Representative, Administrative Officer or their designated location personnel.
4. CLEAN UP. The Contractor will clean up and remove all packaging, construction waste and removed equipment associated with demolition and installation phases of work. The Contractor will clean up any spilled liquids. The Contractor will wipe down the new air conditioning equipment to remove any misapplied paint, grease, oils, writing utensil marks or dirt.