SOW boathouse door replace.docx
DOCX document 28 KB Posted
- Solicitation number
- 2121301PCV201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| interior photo 2.jpg | JPG image | |
| interior photo 1.jpg | JPG image | |
| exterior photo 1.jpg | JPG image | |
| exterior photo 2.jpg | JPG image | |
| exterior photo 3.jpg | JPG image | |
| interior photo 3.jpg | JPG image | |
| FIXED PRICE SERVICE FAR MATRIX.pdf | ||
| PCV201 WAGE DETERMINATIONS.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COAST GUARD STATION ST. CLAIR SHORES
01SEP2020
1.1 WORK COVERED BY CONTRACT:
· Dismantle and dispose of existing door and operator
· Install one new Cornell Thermiser model ESD20-28’ wide X 24’ high OR equivalent
· 18/24 gauge insulated gray slat
· Single guide weatherseal
· Lintel brush seal
· Brush mounted below lintel
· Install front of hood motor
· Model #SGH 30043 E 3 HP gearhead operator or equivalent
· 460- volt 3 phase
· Auxiliary hand chain
· 3- button open/close/stop NEMA 1 push button
· Safety edge bottom bar assembly
· Install safety stop bearing
1.2 DESCRIPTION OF WORK TO BE COMPLETED:
· Station St. Clair Shores’ boathouse door to be properly removed and installation of a new door.
· Disposal of existing door and associated debris from premises.
2.1 SITE VISIT:
Those who desire access to the USCG Station St. Clair Shores facility for bidding or work are to contact DC2 Daniel McDermott or MK1 Mark Zwick. Contractors are to arrange a start work date with USCG St. Clair Shores.
3.1 MILITARY REGULATION:
The contractor, his employees and sub contractors shall become familiar with and obey all station and facility regulations.
3.2 All personnel employed on the project shall keep within the limits of the work and avenues of ingress and egress. Personnel shall not enter any other areas outside the site of work unless required to do so in the performance of their duties and have obtained verbal permission from MK1 Mark Zwick or the USCG Station St. Clair Shores officer of the day.
3.3 The contractor’s equipment shall be conspicuously marked for identification.
3.4 There shall be no smoking in any Coast Guard building and only in designated areas.
4.1 WORK HOURS:
The contractor shall perform all site work during the normal operation hours, 0700-1600 Mon-Fri except during federal holidays.
4.2 Any deviations from normal working hours will be discussed with MK1 Mark Zwick and agreed upon by all parties concerned.
5.1 LABORER WAGES:
Quote must reflect hourly wages prescribed by the Department of Labor in the attached Wage Determination Document provided by the USCG Station St. Clair Shores Contracting Officer.
6.1 CLEAN UP OF WORK AREA:
The contractor shall remove and properly dispose of all trash and debris pertaining to the contract work from the limits of government property, as well as adjacent affected areas.
6.2 Disposal of HAZ MAT shall be in accordance with Federal, State and local regulations.
7.1 ACCEPTANCE OF WORK:
Prior to the acceptance of work by the Coast Guard the contractor shall arrange through MK1 Mark Zwick a review of work completed to ensure work satisfaction as well as proper clean up. Completed work shall meet the written scope of work.
Coast Guard POC info:
MK1 Mark Zwick mark.a.zwick@uscg.mil
DC2 Daniel McDermott Daniel.j.mcdermott@uscg.mil
File details come from the government source that posted it. Updated .