SOW B523.pdf

PDF 2 MB Posted

Attached to
B523 Geotech Drilling
Solicitation number
FA303021Q0026
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATED STATEMENT OF WORK

FOR

GEOTECHNICAL DRILLING AND REPORT SERVICES FOR

BUILDING 523 – Rm. 101

Opportunity # 1101412

November 2020

PREPARED BY:

17TH CIVIL ENGINEER SQUADRON (AETC)

460 E. KEARNEY BOULEVARD

GOODFELLOW AFB, TX 76908-4104

PROJECT MANAGER: R. Terrazas

TABLE OF CONTENTS

Statement of Work (SOW)

Part 1 – Purpose Page 2

Part 2 – Scope of Work Page 2

2.1 – General Page 2

2.2 - Environmental Protection Compliance Page 2

2.3 - Contractor Furnished Labor and Materials Page 2

2.3.1 - Geotechnical Drilling Services Pages 2 - 3

2.3.2 – Geotechnical Report Services Page 3

II. Technical Exhibits

Installation Layout – B523 TE – 1 Bldg. 523 – Location of Area of Work TE - 2 ENLARGED As Built B523 – A1.2 – Floor Plan TE – 3 ENLARGED As Built B523 – A15 – Arch. Details – Wall Sections TE – 4 ENLARGED As Built B523 – S1 – Foundation Plan TE – 5 ENLARGED As Built B523 – S10 – Sections TE – 6 Floor Elevation Survey B523, Rm. 101 TE - 7

Forms

1. SOW (pdf format)

2. Drawings

3. CLIN Schedule without Pricing

4. Detailed IGE Spreadsheet

5. CLIN Schedule with Pricing

6. CE Liquidated Damages Letter

7. Form 9

STATEMENT OF WORK

GEOTECHNICAL DRILLING AND REPORT SERVICES FOR

BUILDING 523 – Rm. 101

Opportunity # 1101412

1.0 PURPOSE: To provide an investigative\exploratory report of the cause of building floor\slab settlement. Also, provide a suggested\recommended solution to remedy the affected areas and from the problem recurring.

Initial visual inspection (see pictures attached) confirms the settling of the floor\slabs.

2.0 SCOPE OF WORK: The Contractor shall furnish all plant, labor, tools, transportation, supplies, supervision, materials and incidentals necessary to perform the work described herein for the subject project. This work shall consist of providing Geotechnical Drilling Services and Geotechnical Report Services of Building 523 Chiarello Hall.

Hours of operation for the building will be Monday – Friday, 0730 – 1630.

Note: Building 523 requires escorts to enter the facility.

2.1 GENERAL: All work shall be coordinated with the Contracting Officer’s designated representative Contract Inspector (325-654-3757). All buildings shall remain occupied during all work. All work shall comply with the most current edition of the US Army Corps of Engineers Safety Manual EM 385 1.1. Also, the Contractor shall initiate and process an AF Form 103 Civil Engineer Work Request with drawings showing proposed borehole location. If necessary, the Contractor shall notify the Government of any proposed utility outage requirements 24 hours in advance. Note, the Government shall be responsible for the disconnection of building utilities, as required.

2.2 ENVIRONMENTAL PROTECTION COMPLIANCE: The Contractor shall perform all work in accordance with local, state and federal environmental laws and regulations.

2.3 CONTRACTOR FURNISHED LABOR AND MATERIALS: The Contractor

shall perform Geotechnical Drilling Services and Geotechnical Report Services as herein indicated. There shall be no Government Furnished Equipment nor Government Furnished Materials for this Geotechnical Drilling Services or Geotechnical Report Services.

2.3.1 GEOTECHNICAL DRILLING SERVICES: The Contractor shall perform the drilling of a geotechnical borehole(s) and/or coring(s) at each respective site in accordance with the location indicated on the attached drawing for soil sampling and concrete testing procedures.

This work shall include marking the site and verifying access is provided for the equipment.

Buildings 523 - Task to be performed within the interior of this building. The Contractor shall core the existing slab in multiple locations to determine the slab parameters and soil conditions beneath the slab. The Contractor will hand auger soils below the slab to the depth able to advance the hand auger or a maximum of 30” below the slab. After performing the Geotechnical Drilling Services, the Contractor shall restore the drilling site to original condition, as required.

The Contractor will analyze the soils encountered beneath the slab to determine soil parameters and the potential for soil movement. The Contractor will perform compression tests on the concrete cores retrieved and gradation on base and sub-base materials.

2.3.2 GEOTECHNICAL REPORT SERVICES: The Contractor shall also prepare a separate Geotechnical Report for each building based on the geotechnical borehole(s) and core drillings, geotechnical investigation and lab results. The report shall include site conditions, site map showing the borehole location, log of the borehole, groundwater conditions, Potential Vertical Rise estimates, results of lab tests [ie. soil moisture content, Atterberg Limits and sieve analysis], allowable bearing capacity values, foundation recommendations, provisions to mitigate the effects of expansive soils, if applicable, engineered and compacted fill material requirements, and construction testing requirements. The Contractor shall provide the Government with one printed copy plus one digital PDF copy of the resultant Geotechnical Report.

-END OF SOW-

Installation Layout

GOODFELLOW AIR FORCE BASE

Map Path: F:\Geo Base Data\Maps\0 Tem plates\BaseMapTem plate (current).m xd

Th is m ap is fo r reference o nly. Alth o ugh every effo rt h as been m ade to ensure the accuracy o f info rm atio n, erro rs and co nditio ns o riginating fro m physical so urces used to develo p the database m ay be reflected o n th is m ap. IGI&S “Geo Base” sh all no t be liable fo r any erro rs, o m issio ns, o r dam ages that result fro m inappro priate use o f th is do cum ent.

S

S

VBC

BBC

VBC VBC TC TC TCVB

C

VB

CBBC TC

PT Pad

BBC

BB

C

BBC

VBC

VBC

TC

Little League Ballfield

Ballfield #2

Running Track

Fo o tball Field

Ballfield #1

Multi Purpo se Field

Ch ina B ea ch

Sw im m i ng P o o l

Mc Ga rr

Sw im mi ng

Po ol

RETENTION

POND

RETENTION

POND

RETENTION

POND

RETENTION

POND

SC

HE

RZ

B

LV

D.

MARAUDER STREET

VALIANT STREET

COMANCHE TRAIL

CANBERRA STREET E

W. CANBERRA STREET

FARROW STREET

FT

.L

A N

CA

ST

E R

AV

EN

U E

VANCE STREET

FT

. G

RI

FF

IN

AV

EN

UE

KE

AR

NE

Y B

LV

D.

FT. RICHARDSON CO

UR

T

PERIMETER ROAD SW

POWELL STREET

KI

OW

A

TR

AI

L

HORNET STREET

KAYDET STREET

VANCE STREET

KICKAPOO TRAIL

FL

IG

HT

LIN

E A

VE

NU

E

AP

AC

HE

TR

AI

L

CH

AL

LE

NG

ER

AV

EN

UE

FT

. R

IC

HA

RD

SO

N A

VE

FT

. S

TO

CK

TO

N A

VE

NU

E

FL

IG

HT

LIN

E A

VE

NU

E

PERIMETER ROAD S

FT

. P

HA

NT

OM

H

ILL

AV

EN

UE

POLLARD STREET

CL

IN

IC

D

RI

VE

MARAUDER WALK

MATHIS STREET

PERIMETER ROAD SE

CARSWELL STREET

MARAUDER TROOPWALK

NUCHOLS STREET

PERIMETER ROAD N

GRIFFIN STREET

GOODFELLOW DRIVE

TEXAN STREET

MITCHELL STREET

VALIANT STREET E.

CARSWELL ALLEY

MATHIS ALLEY

FT

. L

AN

CA

ST

ER

AV

EN

UE

VANCE CIRCLE

FT

. G

RI

FF

IN

AV

EN

UE

LODGE ACCESS

FT CONCHO DRIVE

PE

RI

ME

TE

R

RO

AD

W

E NORTH PATROL ROAD

PE

RI

ME

TE

R

RO

AD

E

PB3530DPB3530E

512504

525 3420

3424 3405

1030 10281026

10271029

1034 1032

258 243

240 238

135 116

241 242

607 608606

603 602

709 701

705 707

612 610

625624623

259742

San Angelo

£¤277

£¤87

£¤67

Ballfield

SF

BBC

BBC

BBC

BBC

TC

WINCHESTER DRIVE

BR

ON

CO

WA

Y

MAVERICK ROAD

DERRINGER DRIVE

LONGHORN DRIVE

C OW

BOY WAY

AR

AP

AH

OE

TR

AI

L

35123717

3401 3407

35113716 3713 3514

34123402

37113710

36023601 3646 36063617

3642 3605

3634 3618

32013109

3104 3106

34483450

3404 3506

31133111

3104 3115

31073103

3102 3108 3112

Rec Cam p

Sw im m ing

Po o l

VBC

TC

BBC

Lake Nasworthy

57005

57024 57011

57006

57007

57008

RECREATION CAMP AREA

Legend S To wer_ P

Offbase Ro ads ! ! ! ! ! Fence

Buildings Carpo rts + Pavilio ns Pavem ent Branch Playgro und Ath letic Co urt Ath letic Field Sw im m ing Po o l Interm ittent Water

RIO CONCHO HOUSING AREA

Lo cal Area

Goodfellow

AFB

Goodfellow Rec Camp

17 CES/CENME, GeoBase Building 3511, Room 124

654-1192/1282

Map Date: August 2020

0 200 400100 Meters

0 500 1,000 1,500250 Feet

Parking Area

RV Sites

1591846821C Oval

1591846821C Callout Building 523

UP

E L E

C T

148A

149A

113B

150A

151B

MECH ROOM

ELEC/TEL ROOM

138A

152A

152B

153A

153B

154A

154B

155A

155B

151A

150B

148B

149B

113A

E L E

V

112A

117A

N

DATE:

OCT 2016VTD

SCALE:

DRAWN BY:

1" = 30' - 0"

BLDG 523

1ST FLOOR PLAN

1553258525C Callout Interior Condition:

Slab shows signs of settling.

Approx. 1/2" - 3/4"

1591846821C Polygon

1591846821C Text Box Condition of perimeter radius wall rm. 101

1591846821C Text Box Condition @ bldg enrty, rm. 100

1591846821C

ENLARGED As Built B523 - A1.2 Floor Plan

Polygon

ENLARGED As Built B523 - A15 Wall Sections

ENLARGED As Built B523 - S1 Floor Plan

ENLARGED As Built B523 - S10 Sections

Polygon

Elev = 0

-0.0

0.15

-0.2

-0.1

-0.1

-0.2

-0.1-0.1

-0.1

-0.1 -0.1

-0.1

-0.0 -0.0

-0.1 0.07

-0.1

-0.1 0.00

-0.0

-0.3

-0.3

-0.4

-0.3

-0.4 -0.1

-0.1

-0.3 -0.0

-0.1

-0.3 0.02

-0.0

-0.2 0.05

-0.1

-0.3

-0.0

-0.3

-0.7 -0.2

-0.4

-0.7 -0.1

-0.3

-0.4

-0.4

-0.3 -0.1

-0.2 -0.1 0.03

-0.0 0.07 0.29

0.19 0.13

0.25 0.15 0.32

0.16 0.17

0.13 0.25

BLDG 523 - RM 101

FLOOR ELEVATION SURVEY

*FLOOR PLAN SHOWN FOR APPROXIMATE REPRESENTATION PURPOSES ONLY

Elevation Change -0.50" or more

-0.25" - -0.49"

-0.10" - -0.24"

-0.10" or less ±

File details come from the government source that posted it. Updated .