This pre-solicitation notice requests Standard Form 330 Architect-Engineer Qualifications packages for design services related to infrastructure upgrades at the Central Arkansas Veterans Healthcare System campus in North Little Rock, Arkansas. A firm-fixed price design contract will be awarded to provide investigative and feasibility design, schematic design, design development, construction documents, specifications, cost estimates, narratives, and construction period services for electrical, HVAC, communications, and physical security system upgrades across multiple buildings. The period of performance for design services is 365 calendar days from notice to proceed. Construction period services will be exercised separately to match the construction contract period.

Submissions are due by June 18, 2021. A two-phase evaluation process will initially evaluate SF 330s submitted before shortlisting three firms for written responses. Design requirements include compliance with VA design manuals and sustainable criteria. The project value is between $20-50 million. This is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses. The award date target is September 3, 2021.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements