This pre-solicitation notice seeks standard form SF 330 Architect-Engineer Qualifications packages for a design contract to support an EHRM Training and Admin Support project at the Central Alabama Veterans Health Care System East Campus in Tuskegee, Alabama. The project includes site preparation and utility installation to support placement of eight modular buildings and demolition of nine existing cottages. The anticipated period of performance is 195 days with an estimated award date of June 2023. The contract value is between $2-5 million. Qualifications packages are due by March 3, 2023. Evaluation criteria include specialized experience with similar site preparation and modular building support projects, technical competence of disciplines like architecture and engineering, management approach, capacity to meet the schedule, and past performance. The opportunity is set aside for SDVOSB concerns and submissions must come from verified SDVOSBs.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements