SOW Att 01 - VHA Req Div 01 Spec Sections - EHRM Infra Jackson.pdf

PDF 106 KB Posted

Attached to
C1DA--586-21-700 EHRM Infrastructure Upgrades Design Jackson, MS VAMC Federal contract opportunity
Solicitation number
36C77621R0152
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for an Architect-Engineer (A-E) qualifications submission for design services. The Veterans Health Administration seeks a firm to provide investigative and feasibility design, schematic design, design development, construction documents, specifications, cost estimates, and construction period services for infrastructure upgrades including electrical, HVAC, communications, and security at the G.V. Montgomery VA Medical Center in Jackson, Mississippi. The period of performance for design is 144 calendar days with construction period services to match the construction contract duration. Submissions are due by November 18, 2021 with award targeted for February 25, 2022. This is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 - General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 - Project Schedules (Small Projects - Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 - Safety Requirements 01 42 19 - Reference Standards 01 45 00 - Quality Control 01 45 29 - Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 - Construction Waste Management 01 81 13 - Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .