AE Design SOW - EHRM Infrastructure Upgrades - Jackson - Final.pdf
PDF 244 KB Posted
- Attached to
- C1DA--586-21-700 EHRM Infrastructure Upgrades Design Jackson, MS VAMC Federal contract opportunity
- Solicitation number
- 36C77621R0152
About this file
This statement of work and pre-solicitation notice describe an upcoming contract opportunity for architect-engineeral design services. The Veterans Health Administration will award a firm-fixed price contract to provide investigative and feasibility design, schematic designs, construction documents, and construction period services to upgrade infrastructure at the G.V. Sonny Montgomery VA Medical Center in Jackson, Mississippi. Key upgrades include electrical systems, HVAC, fiber infrastructure, communications cabling, and physical security. The period of performance for design services is 144 calendar days with optional line items for construction period services. Submissions of SF 330 qualifications packages are due by November 18, 2021, with award by February 25, 2022. This is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PPQ - Jackson EHRM.docx | DOCX document | |
| SOW Att 10 - XMatrix - EHRM Infra Jackson.pdf | ||
| SOW Att 05 - 01 32 16.01 EHRM AE CPM Schedule Specs - - EHRM Infra Jackson.pdf | ||
| SOW Att 02 - 00 VA OEHRM Site Infra Reqs v2.0 - EHRM Infra Jackson.pdf | ||
| SOW Att 01 - VHA Req Div 01 Spec Sections - EHRM Infra Jackson.pdf | ||
| SOW Att 06 - PG-18-15- Vol C - AE Submission Reqs - EHRM Infra Jackson.pdf | ||
| SOW Att 11 - COVID-19 Safety Protocols for Federal Contractors.pdf | ||
| SOW Att 09 - SitePlan Model - EHRM Infra Jackson.pdf | ||
| SOW Att 08 - VHA Directive 1061 - Legionella - EHRM Infra Jackson.pdf | ||
| SOW Att 03 - HEFP SEP Design Alerts 1-6.pdf | ||
| 36C77621R0152.docx | DOCX document | |
| SOW Att 07 - Seasonal Influenza with Vaccines - EHRM Infra Jackson.pdf | ||
| SOW Att 04 - Sensitive Infra Data Classification - EHRM Infra Jackson.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G.V. (Sonny) Montgomery VA Medical Center 1500 East Woodrow Wilson Avenue 10/15/2021 Jackson, MS 39216
ARCHITECT-ENGINEER DESIGN STATEMENT OF WORK
EHRM INFRASTRUCTURE UPGRADES
PROJECT NO: 586-21-700
PROJECT NAME: EHRM Infrastructure Upgrades – Jackson, MS
ESTIMATED CONSTRUCTION COST: $20,916,900
**The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required**
1. GENERAL INTENT:
The Contractor (herein referred to as “A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at the G.V. (Sonny) Montgomery VA Medical Center in accordance with this design statement of work.
2. SCOPE OF WORK:
A/E Part One Services (also known as Design Phase Services) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The project shall include, but is not limited to, upgrades to facility fiber throughout the buildings to each IT closet, providing a redundant fiber run throughout the facility to each IT closet, providing redundant fiber mains to the demarcation room from the provider point, installation of approximately 100 additional IT outlets, installation of approximately 75 new electrical outlets throughout the facility, providing additional outlets in each IT closet, upgrades to facility power distribution as required, upgrades to facility HVAC distribution as required, physical security assessment and upgrades, and hazardous material abatement.
A/E Part Two Services (also known as Construction Period Services) for this design project includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project; attendance at pre-bid, post-award, and commissioning kick off construction project conferences; review of construction material submittals and shop drawings; approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications; preparation of site visit reports; coordination with project commissioning requirements; review of any construction project modifications for cost and technical acceptability; attendance and participation during the final acceptance inspection; preparation of the punch list; and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log, and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award.
The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprise all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of the G.V. (Sonny) Montgomery VA Medical Center record drawings and the EHRM infrastructure readiness assessment documents will be made available to the highest rated A/E firm; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. SOW Attachment 09 – G.V. (Sonny) Montgomery VA Medical Center Campus Map will give the A/E firm a basic understanding of the G.V. (Sonny) Montgomery VA Medical Center campus.
The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project.
The A/E firms’ representatives performing site investigations on G.V. (Sonny) Montgomery VA Medical Center campus must have the following additional requirements before starting site investigations on campus:
1. Negative TB Test, within the past calendar year
2. Face cover
3. Pre and weekly negative COVID test while working in patient care areas
4. Daily visit at check-in station for appropriate COVID screening
5. Annual influenza shot is required for all staff performing work on G.V. (Sonny) Montgomery VA Medical Center campus (see SOW Attachment 07 – Seasonal Influenza with Vaccines)
6. Contractor badge must always be obtained and worn by contractor or representative while on campus
3. DESIGN WITHIN FUNDING LIMITATIONS:
The design shall be prepared by the A/E to permit the award of a construction contract, using Federal Acquisition Regulation procedures for the construction of the facilities, at a cost that does not exceed the project’s estimated construction contract price of $20,916,900.
4. DESIGN INDEPENDENCE, FURNITURE, AND EQUIPMENT:
Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately.
Equipment that can be part of the design includes those items to meet code requirements for building occupancy; items covered in the VA’s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26, or 28 through 48; non-IT equipment items covered by Division 27; and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00, and 12 36 00.
The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.
5. DESIGN CRITERIA:
The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning, and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs References:
PG-18-1 Master Construction Specifications
SOW Attachment 01 VHA Required Division 01 Specification Section List
PG-18-3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders]
PG-18-4 Standard Details and CAD Standards
PG-18-5 Equipment Guide List
H-18-8 Seismic Design Handbook
PG-18-9 Space Planning Criteria
PG-18-10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis]
PG-18-12 Design Guides (graphical, by function)
PG-18-13 Barrier Free Design Guides
PG-18-14 Room Finishes, Door, and Hardware Schedules
PG-18-15 Minimum Requirements for A/E Submissions
PG-18-17 Environmental Compliance Manual
H-7545 VA Cultural Resource Management Procedures
See SOW Part 16 OIT Infrastructure Standard for Telecommunications Spaces v3.0 (21 August 2020) http://www.cfm.va.gov/til/index.asp http://www.cfm.va.gov/CFM/TIL/spec.asp http://www.cfm.va.gov/CFM/TIL/cPro.asp http://www.cfm.va.gov/CFM/TIL/sDetail.asp http://www.cfm.va.gov/CFM/TIL/equip.asp http://www.cfm.va.gov/CFM/TIL/seismic.asp http://www.cfm.va.gov/CFM/TIL/planning.asp http://www.cfm.va.gov/cfm/til/dManual.asp http://www.cfm.va.gov/cfm/til/dGuide.asp http://www.cfm.va.gov/CFM/TIL/accessibility.asp http://www.cfm.va.gov/cfm/til/room/RoomFinishes.pdf http://www.cfm.va.gov/til/aeDesSubReq.asp http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.va.gov/vapubs/viewPublication.asp?Pub_ID=584&FType=2
The following references should also be used to complete the design documents:
VA Standards Alert 017 – Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf)
00 VA OEHRM Site Infrastructure Requirements v2.0 (SOW Attachment 02)
SOCAMES 6 Design Alerts (SOW Attachment 03)
Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department-wide.
6. DESIGN COLLABORATION:
The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 16, and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEFP/SEP and/or VISN deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.
7. INDEPENDENT LIFE SAFETY REVIEW:
The A/E shall incorporate any comments from the VA 3rd party life safety review.
8. ENVIRONMENTAL PROTECTION:
The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the G.V. (Sonny) Montgomery VA Medical Center. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.
9. PHYSICAL SECURITY:
The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the Physical Security Design Manual for Mission Critical Facilities located on the TIL (https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf). The A/E shall ensure that all aspects of the https://www.cfm.va.gov/til/sAlert/sAlert017.pdf http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf applicable VA Physical Security Design Manual (either Life-Safety Protected or Mission Critical Facilities; both will be applicable depending on the area the work is taking place) are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary.
10. TELECOMMUNICATIONS DESIGN:
In accordance with “Telecommunications and Special Telecommunications Systems Design Manual,” February 2016 (https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf), paragraph 1.2 (d), Telecommunications design must be performed and stamped by a BICSI Registered Communications Distribution Designer (RCDD) for all projects.
11. SUBMITTAL REQUIREMENTS:
Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C - A/E Submission Instructions for Minor and NRM Construction Program dated November 2008. This document is included as SOW Attachment 06 - PG 18-15 Vol C - AE Submission Reqs. Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO). This memo is included as SOW Attachment 04 - Sensitive Infrastructure Data Classification, as it is hosted on a non-public VHA site (https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949).
The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15. It is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Statement of Work. Each new submittal will incorporate all VA comments from the previous submittal. The Asbestos Abatement requirements in PG-18-15 are applicable at G.V. (Sonny) Montgomery VA Medical Center due to the age of the campus (construction began in the 1950s).
The following submittals will be required for this project:
Quality Assurance/Quality Control (QA/QC) Plan
Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required.
Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions.
Conceptual drawings of the planned design and the initial cost estimate will additionally be included.
Schematic Design (SD) - 35%
Design Development One (DD) - 65% https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949
Construction Documents (CD) - 95%
Final Bid Documents (Bid) - 100%
12. DRAWING FORMAT:
All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2019 or the latest version available to G.V. (Sonny) Montgomery VA Medical Center.
The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions, and other items in the design to aide with facility visualization and contractor coordination.
The project BIM model minimum requirements shall be developed to include the systems described below as they would be built and the processes of installing them, and to reflect record drawing conditions (possibly incorporating into the G.V. (Sonny) Montgomery VA Medical Center Master Record Drawing – pending facility expertise). The deliverable model at the SD, DD, and CD design phases shall be developed to include as many of (but not limited to) the systems described below as are necessary and appropriate at that design phase.
Architectural/Interior Design
Square Footage/Volume
Room Names and Numbers
Architectural Schedules
Architectural Specialties and Woodwork
Doors
Windows
Louvers
Roof
Floors
Ceilings
Vertical Circulation
Walls/Curtain Wall Sizes, Shapes, & Material Data
General Signage
Schedules
Furniture
Equipment
Structural
Foundations
Shafts and Pits
Mechanical
HVAC
Plumbing
Electrical/Telecommunications
Power and Lighting
Steam Distribution
Other Engineering Data as Required
Exterior Building Information
Nurse Call System
Asbestos/Hazardous Material Info
Security System Information (Access Control, Security Cameras, Panic Alarms, Overhead Paging)
Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms)
Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition) http://www.cfm.va.gov/til/projReq.asp
13. SUBMITTAL FORMATS:
Submittals shall be provided in electronic and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp), and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at https://section508.gov/. The A/E shall be responsible for providing:
Meeting/Conference Minutes
Meeting minutes for all formal meetings and conferences held with the VA, including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.
Minimum meeting minutes requirements
Project name, project number, meeting host, meeting name
Date, time, meeting ID, call-in number, duration, and consecutive number of total related meetings
Participant list (name, title, phone number (office and mobile), email, attended meeting (yes/no))
Meeting purpose, roll call, COVID-19, and additional items
Agenda items (decisions, action items, and fixes or next steps)
Next meeting date and time
Detailed attachment list
Construction Cost Estimates
Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated March 8, 2011. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above.
Quality Assurance/Quality Control (QA/QC) Plan
All documents in any of the electronic formats listed above.
Basis of Design (BD)
All documents in any of the electronic formats listed above.
Two (2) half-size paper bond sets of drawings - 2 to VA
Schematic Design (SD)
All documents in any of the electronic formats listed above.
Two (2) half-size paper bond sets of drawings - 2 to VA
Two (2) paper bond sets of specifications - 2 to VA
Two (2) paper bond sets of investigation reports, design calculations, space planning data, and cost estimate - 2 to VA
Design Development (DD) and Construction Documents (CD) https://section508.gov/ http://www.cfm.va.gov/cost/index.asp
All documents in any of the electronic formats listed above.
Memo annotating what was not upgraded and corresponding justifications.
One (1) full size paper bond sets of drawings - 1 to VA
Two (2) half-size paper bond sets of drawings - 2 to VA
Two (2) paper bond sets of specifications - 2 to VA
Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW), and cost estimate - 2 to VA
Final Bid Documents (Bid)
PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report.
Certified memo annotating what areas/times were not upgraded and the corresponding justifications.
Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/fully functional.
Word files of specifications.
Revit and AutoCAD files of drawings.
One (1) full size paper bond sets of drawings - 1 to VA
Two (2) half-size paper bond sets of drawings - 2 to VA
Two (2) paper bond sets of specifications - 2 to VA
One (1) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW, and cost estimate - 1 to VA
Solicitation Support Services
Pre-bid site visit to include meeting and project walk around. This is the meeting where contractors are invited to the job site to visually inspect the construction site in order to accurately develop a construction bid package.
Answer any technical questions/requests for information (RFI) received from contractors over the duration of the solicitation, including questions asked during the site visit. Questions from contractors may come at multiple times and cover several or a few questions over the course of the solicitation period.
Technical question responses will be provided to the Contracting Officer who will distribute the information via amendment to the solicitation.
Answers to RFIs will be required from the A/E within five (5) calendar days of the date the questions are sent to the A/E from either the project COR or CO. An alternate response period may be submitted for review, however, unless approved by the CO and COR, the A/E is required to comply with the five (5) calendar day requirement.
Throughout the solicitation period, the A/E shall provide addenda as necessary if required to revise specs and drawings.
In response to any technical questions and/or addenda issued during the solicitation period, the A/E shall provide any final revisions to the 100% FC CD as part of the construction contract. These documents shall be labeled Final Construction.
Construction Period Services (CPS)
Requests for Information (RFI)
Requests for Information shall be submitted within three (3) calendar days of submittal to the A/E.
Submittal Reviews
Submittal reviews shall be submitted within seven (7) calendar days of submittal to the A/E.
Site Visit Reports
Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above.
Modification/Change Order Requests
Modification requests shall be submitted within seven (7) calendar days of submittal to the A/E. This includes the review of the contractor’s change order/modification proposal for construction change orders, as well as the formulation of an IGCE for the modification, as requested. The A/E's reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes. All documents in any of the electronic formats listed above. Note - If major modification, VA will provide additional time and document format guidance.
Punch List
Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.
Record Drawings
Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format.
14. PROJECT SCHEDULE/PERIOD OF PERFORMANCE:
The A/E shall perform Part One Services/Design Phase work according to the schedule shown below. The A/E is also responsible for following specification Section 01 32 16.01 Architectural and Engineering CPM Schedules (see SOW Attachment 05 - 01 32 16.01 EHRM A-E CPM Schedule Specs.) If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day.
QA/QC Submittal & Basis of Design (BD) 10% Submittal
21 calendar days after receipt of Notice of Award
QA/QC and BD 10% Submittal Review Meeting
10 calendar days after VA receipt of QA/QC & BD 10% Submittals
35% SD Submittal 21 calendar days after VA acceptance of QA/QC & BD 10% Submittals
35% SD Review Meeting 10 calendar days after VA receipt of 35% SD Submittal
65% DD Submittal 21 calendar days after VA acceptance of 35% SD Submittal
65% DD Review Meeting 10 calendar days after VA receipt of 65% DD Submittal
95% CD Submittal 21 calendar days after VA acceptance of 65% DD Submittal
95% CD Review Meeting 10 calendar days after VA receipt of 95% CD Submittal
Final Bid Documents Submittal 10 calendar days after VA acceptance of 95% CD Submittal
Final Bid Documents Acceptance Meeting 10 calendar days after VA receipt of Final Bid Documents Submittal
Total Part One Services/Design Phase Schedule
144 calendar days
The 144 days listed in part one project schedule may fluctuate based on when 95% CD submittal meets all VA guidelines and acceptance is issued. If 95% CD submittal is not accepted due to insufficient design requirements throughout the design period and additional time is deemed necessary, it is the responsibility of the A/E firm to cover all costs associated with such delays.
Solicitation Support Services (optional Line Item) shall be performed for the length of time between the time the option is exercised and award of the construction project. Construction Period Services (optional Line Items) shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Solicitation Support Services and Construction Period Services.
15. CONTRACT OVERSIGHT:
All contracts for this project shall be awarded by the Program Contracting Activity Central (PCAC); only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders, and changes to the statement of work.
PCAC shall designate a Contracting Officer’s Representative (COR) to monitor and manage the A/E’s performance under the design project contract. The COR shall be a representative of the G.V. (Sonny) Montgomery VA Medical Center Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project.
A COR from the G.V. (Sonny) Montgomery VA Medical Center Engineering Service Project Section shall also be designated to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s Representative” and does not supersede or eliminate the A/E’s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.
16. OI&T INFRASTRUCTURE STANDARD FOR TELECOMMUNICATION SPACE:
The current version for this standard is version 3.0, dated August 21, 2020 (https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf). The design for this project at the G.V.
(Sonny) Montgomery VA Medical Center must meet the Campus Support Center (CSC) requirements of the Infrastructure Standard for Telecommunications Spaces.
The Infrastructure Standard for Telecommunications Spaces (The Standards) serves as the master reference document of criteria for Department of Veterans Affairs (VA) facility Information Technology (IT) support infrastructure. It defines the technical requirements necessary to maintain optimum reliability and efficiency within VA facilities and computing centers. IT Support Infrastructure is defined as all passive telecommunications and information technology equipment, and supporting physical space and equipment.
This standard is owned and maintained by Solution Delivery (SD) Data Center and Infrastructure Engineering and questions or concerns should be directed to the following email group: OIT ITOPS SD Data Center and Infrastructure Engineering.
Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with their supervisor, Information Security Officer (ISO), Facility Chief Information Officer (CIO), or local Office of Information and Technology (OI&T) representative to ensure that all actions are consistent with current VA policies and procedures prior to implementation.
17. EXEMPTIONS TO VA OEHRM SITE INFRASTRUCTURE REQUIREMENTS:
Any variances or exemptions to SOW Attachment 02, most recent version, must be referenced, documented, and discussed with CO, COR, and HEFP SEP. Following approval of variance or exemption, A/E shall submit documentation describing variance or exemption, indicate reference in VA documentation, describe any mitigating measures, and include an attachment with documentation of discussion with CO, COR, and HEFP SEP.
18. REPORTING REQUIREMENTS:
The Contractor is required to report to Engineering Project Section, Facility Management Service, Bldg. 1 RM I101 to log in during normal working hours. This check-in is mandatory. When the service is completed, the https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf
Contractor shall document services rendered on a legible field service report. The Contractor shall return to the same service and building to submit the field service report to the COR for signature during normal working hours.
19. SOW ATTACHMENTS:
The following documents are attached to this SOW for A/E use and incorporation into the project documents:
VHA Required Div 01 Specification Sections (SOW Attachment 01)
00 VA OEHRM Site Infrastructure Requirements v2.0 (SOW Attachment 02)
SOCAMES 6 Design Alerts 1-6 (SOW Attachment 03)
Sensitive Infrastructure Data Classification FOUO (SOW Attachment 04)
01 32 16.01 EHRM Architecture and Engineering CPM Schedule (SOW Attachment 05)
Program guide, PG-18-15 Volume C – A/E Submission Instructions for Minor and NRM Construction program dates November 2008 (SOW Attachment 06)
Seasonal Influenza with Vaccines (SOW Attachment 07)
VHA Directive 1061 Prevention of Healthcare Associated Legionella Disease (SOW Attachment 08)
Campus Map (SOW Attachment 09)
Site Self-Assessment X-Matrix (SOW Attachment 10)
COVID-19 Safety Protocols for Federal Contractors (SOW Attachment 11)
End of SOW
File details come from the government source that posted it. Updated .