This Statement of Work (SOW) outlines requirements for the Air Force Institute of Technology's procurement of three UAV engines model LOP-AR74-1103 to support USAF Intelligence Surveillance and Reconnaissance platforms. The technical specifications require engines with chamber size greater than 200 cc, power output exceeding 35 bhp at full speed, weight under 25 lbs excluding generator, and fuel consumption less than 0.6 lb/bhp/hr at cruise. The engines must include voltage regulators and fuel pumps.

Delivery is required within 30 weeks of contract award to Wright-Patterson AFB, OH. The SOW specifies products must be domestic or qualifying country end products per DFARS 252.225-7001. Payment terms are 100% upon completion with net 30 through Wide Area Work Flow. A one-year warranty is required. The document includes detailed commercial vehicle delivery procedures for Wright-Patterson AFB, requiring inspection at Gate 16A for vehicles larger than pickup trucks, with specific exceptions and protocols for various delivery scenarios.

View the file

Other files

File Type Posted
17Dec24_QA-UAV_Rotary Engine.pdf PDF
Instructions_UAV Engines.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

UAV ENGINES AR74-1103

09 MAY2024

I. BACKGROUND: The Air Force Institute of Technology does not currently have access to engines required to accomplish projects relating to characterizing engines applicable to Unmanned Aerial Systems (UAS) supporting USAF Intelligence Surveillance and Reconnaissance (ISR) platforms.

II. MINIMUM TECHNICAL REQUIREMENTS:

The engine shall meet the following characteristics:

1. Model: LOP-AR74-1103

2. Chamber size: Greater than 200 cc

3. Power Output: Greater than 35 bhp at full engine speed.

4. Weight: 25 lb. or less excluding generator.

5. Fuel Consumption: Less than 0.6 lb./bhp/hr. at cruise.

6. Voltage Regulator: Must include any required voltage regulator.

7. Fuel system: Must include any required fuel pump.

8. Quantity: 3 engines required for characterization and tear-down/inspection

III. QUALIFYING COUNTRY PRODUCTS: All products proposed/delivered to satisfy these requirements shall be either domestic or qualifying country end products in accordance with DFARS 252.225-7001. Buy American and Balance of Payments Program.

IV. DELIVERY: The contractor shall deliver a complete system to the following address: SHIP

TO DODAAC:F4F5AV

POC: Jamie Smith Air Force Institute of Technology/ENY 2950 Hobson Way

WPAFB, OH 45433

Phone number 937-656-6096 Email address: Jamie.Smith.1@us.af.mil ranell.easterday@us.af.mil

V. LEAD TIME: The contractor shall deliver a complete system no later than 30/weeks after contract award.

VI. WARRANTY: 1 year

VII. PAYMENT: 100% payment upon completion of all requirements specified in this Statement of Work. Payment shall be made on a net 30 basis. Invoices shall be submitted and paid through Wide Area Work Flow mailto:Jamie.Smith.1@us.af.mil mailto:ranell.easterday@us.af.mil

(https://wawf.eb.mil)

VIII. DELIVERY PROCEDURES COMMERCIAL VEHICLES: All vehicles larger than a large pick-up truck is required to be inspected by the Wright- Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation.

1.0 Vehicles to be inspected include, but are not limited to, the following:

1.1 Step van/panel truck

1.2 Tractor/trailer, box, and flatbed containing cargo

1.3 Tanker trucks

1.4 Box Trucks

1.5 Tour buses

1.6 Garbage/recycled waste trucks

1.7 Concrete trucks/mixers, dump trucks

1.8 Cranes, recreational vehicles, petroleum tanker

2. This inspection will be conducted at Gate 16A located off State Route 444. The following are exceptions to vehicles utilizing the CVDG:

2.1 If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B.

If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

2.2 If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre- clearance form to the entry controller at the next point of installation entry. This reentry can be at any base gate.

2.3 Wright Patterson Integrated Defense Plan, paragraph 3.10.12.9.2. All irregular deliveries will be sent to the CVDG for inspection. All visitors, which include contractors and commercial vendors without proper background checks and https://wawf.eb.mil/ contractor passes, will not be allowed on WPAFB unless escorted by the receiving agency. This will take place after the individual(s) are issued a pre-clearance form at the CVDG. After successful completion of the vehicle inspection, the receiving agency will escort the individual to and from their destination on WPAFB. An inspector at the CVDG will contact the receiving.

agency, informing them to send an escort to the CVDG. Escorts will remain with the vehicle at all times while it is on WPAFB.

2.4 Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

The engine shall meet the following characteristics: