SOW ABSF Old Richmond Road Culvert Replacment.pdf

PDF 153 KB Posted

Attached to
Appomattox Buckingham State Forest Replacement Culverts
Solicitation number
74900
Issued by
Alleghany County, Virginia

About this file

This document is a Scope of Work (SOW) for the replacement of culverts at the Appomattox-Buckingham State Forest in Virginia. The Department of Forestry (DOF) is seeking a vendor to furnish and deliver four 60-inch by 20-foot sections of aluminized, 14-gauge corrugated metal pipes (CMP) and two aluminized type 2 connecting bands to securely connect the pipe sections. The goods must be delivered to the Appomattox-Buckingham State Forest located in Dillwyn, Virginia no later than September 30, 2024. Bid pricing must be inclusive of any shipping and delivery costs.

The pricing for this solicitation must be submitted in the electronic pricing grid provided. Vendors are instructed to reach out to the DOF contact, thomas.baumann@dof.virginia.gov, for any questions regarding this solicitation. The related state and local contract opportunity is limited to the Appomattox-Buckingham State Forest located in Buchanan County, Virginia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quick Quote:

Appomattox Buckingham State Forest Replacement Culverts

Scope of Work and Requirements

Summary:

DOF is seeking a vendor to furnish and deliver: Aluminized Corrugated Metal Pipes (CMP), with connecting bands to the Appomattox-Buckingham State Forest.

Requirements:

Goods Furnished:

1) Quantity: 4 x 60inch X 20foot Sections of Aluminized, 14 Gauge CMP. *Culvert pipe must be aluminized.

2) Quantity: 2 – Aluminized type 2 connecting bands to connect the above pipe sections together.

a) Connecting bands must be able to securely connect the above CMP sections.

3) Bid pricing must be inclusive of any shipping/delivery cost.

Delivery Requirements:

1. Shipping must be FOB destination.

2. Goods must be delivered to the address below no later than September 30, 2024.

3. Ship to address:

Appomattox-Buckingham State Forest

1685 Francisco Road

Dillwyn, VA 23936

Instructions:

Submit a total cost per unit delivered in the electronic pricing grid provided with the solicitation.

Instructions describing how to respond to a quick quote are linked here. *Not all steps are applicable.

If you have any difficulties submitting a bid, please reach out to eVA customer care at (866) 289-7367

For any questions about this solicitation, please reach out to thomas.baumann@dof.virginia.gov.

https://dgs.virginia.gov/globalassets/business-units/dps/documents/vbo/how-to-respond-to-qq.pdf

File details come from the government source that posted it. Updated .